Tender Overview
Organization: Cachar College, under the Higher Education Department, Assam. Procurement focuses on an Online UPS (>10 KVA) With Battery to support college infrastructure. No BOQ items reported and no explicit estimated value or EMD provided. The tender highlights a demand for precise performance parameters (KVA rating, input/output voltage), construction features (inbuilt isolation transformer), and battery details (battery type and backup time). This procurement may consider a flexible quantity approach per the buyer's option clause, with potential 25% quantity variation. The response is driven by functional reliability and compliance with college-size power protection needs within Assam.
Key differentiators include strict emphasis on performance parameters and the presence of a user-specified backup capability, which impacts battery type and run-time requirements. The tenderβs scope is oriented toward campus-level uninterrupted power supply readiness, with emphasis on electrical compatibility and reliability under local conditions. Unique aspects include the integration of an isolation transformer and explicit backup-time considerations, which influence UPS sizing and maintenance planning.
Technical Specifications & Requirements
- Category: Performance Parameters β Rating in KVA; Input Voltage: AC 50 Hz; Output Voltage: AC 50 Hz.
- Category: Construction β Availability of Inbuilt Isolation Transformer.
- Category: Battery/Backup Bank β Type of Battery; Backup Time.
- Additional items to confirm: compatibility with campus electrical distribution, fault tolerance, and safety compliance for educational facilities in Assam.
- Emphasis on delivering a complete UPS package including installation support, warranty terms, and serviceability in regional conditions.
Terms, Conditions & Eligibility
- Quantity Flexibility: Purchaser may increase/decrease quantity up to 25% at contract, with proportional delivery extension calculations.
- Delivery Period: Commences from the last date of original delivery order; extended time calculation applies with a minimum of 30 days.
- ATC/ATC Document: Buyer has uploaded ATC; bidders should review for site-specific terms.
- Compliance with these terms is mandatory; bidders must align with option clause and delivery dynamics for contract execution.
