Tender Overview
Hindustan Petroleum Corporation Ltd invites bids for the procurement of 15 meter Type 3 fire hose, double door hose box, and SS universal nozzle. The tender covers a bundled fire-safety equipment package with an indicative scope including these three items; the precise BOQ is not published. The bid features a flexible quantity option allowing up to 25% increase in ordered quantity both at initial award and during the currency of the contract. The delivery schedule references the last date of the original delivery order, with a minimum extension proportional to the extended quantity, subject to a floor of 30 days. This procurement is conducted under HPCLโs internal supply chain framework and is positioned as a standard supply contract.
Technical Specifications & Requirements
- Product names: 15 meter Type 3 fire hose, double door hose box, SS universal nozzle.
- Standards/Compliance: Not specified in the tender data; bidders should assume conformity to general fire-safety equipment norms and HPCL internal standards.
- Quantities/Scope: No BOQ items available; estimated value and exact quantities are not provided.
- Delivery/Installation: Delivery period to be calculated per option clause; initial deliveries to follow the original delivery schedule, with adjustments based on quantity variation.
- Experience/Capabilities: Vendors must be capable suppliers of emergency firefighting equipment and compatible with HPCL procurement processes.
- Pricing/Validity: Price adjustments allowed for up to 25% quantity changes at contracted rates; delivery time adjustments follow the specified formula.
Terms, Conditions & Eligibility
- Option Clause: Purchaser may increase/decrease the quantity by up to 25% of bid quantity at contract placement and during currency.
- Delivery Timeline: Calculations start from the last date of the original delivery order; minimum additional time is 30 days.
- ATC/Acceptance: Attested terms and ATC document uploaded by purchaser; bidders must comply with these terms.
- EMD/Payment: Specific EMD amount and payment terms are not disclosed in the data; bidders should prepare standard bid security and comply with HPCL payment norms.
- Documentation: Bidders must follow the Terms and Conditions; ensure submission of all required technical and commercial credentials per HPCL guidelines.
- BOQ: No BOQ items available; ensure readiness to supply the three listed product lines if called upon.