Tender Overview
Bharat Sanchar Nigam Limited Portal (BSNL), under the Department of Telecommunications, invites bids for an integrated package including LED Street Light Fittings, PF Al conductor Armoured cable, end termination, GI pipe arrangements, MCB DB, GI Wire, Loop box, Gate light, LED bulbs and related LED arrangements, along with supplying and drawing and fixing. Estimated value is ₹286,022.0. Project scope spans multiple electrical and civil fittings intended for street/ campus lighting and distribution, with a 12-item BOQ totaling generic entries. Location details are not specified in the tender metadata. A distinctive feature is the option to scale quantity up to 25% during contract execution, with delivery timelines tied to the last delivery order. This clause drives flexibility for bulk increments and schedule management.
Technical Specifications & Requirements
- No formal technical specifications are provided in the tender text. The procurement includes items such as LED Street Light Fittings, PF Al conductor Armoured cable, end terminations, GI pipe arrangements, MCB DB, GI Wire, Loop box, Gate light, LED Bulbs, and related wiring/drawing/fixings. The BOQ shows 12 items but all entries are labeled as N/A, indicating missing quantity granularity. The primary differentiator is the bundled electrical scope rather than standalone product specs. The only explicit numeric cue is the estimated value ₹286,022.0. The absence of standards (IS/ISO) or warranty details requires bidders to rely on standard industry practices for electrical fittings and safety compliance.
Terms, Conditions & Eligibility
- EMD amount not specified in the data; bidders should review the ATC document for exact security requirements.
- Option Clause permits quantity adjustments up to 25% of bid quantity both at contract award and during currency, with delivery period recalibrated as: (Additional quantity ÷ Original quantity) × Original delivery period, minimum 30 days.
- Delivery timelines commence from the last date of the original delivery order; extended delivery time follows the option clause.
- Section prompts bidders to comply with the option-based delivery framework and associated rate protections.
- No explicit payment terms or warranty details are provided in the visible text; bidders should verify with the ATC for penality, penalty, and warranty clauses.