Tender Overview
The opportunity originates from Bhabha Atomic Research Centre (Department of Atomic Energy) for repair, maintenance, and installation of electrical systems or plant equipment. The BOQ shows zero items currently, and no monetary figures or start/end dates are disclosed. A notable tender term grants the buyer authority to adjust contract quantity or duration up to 25% before award and after issuance. This procurement focus implies a service-provider role capable of electrical system maintenance, installation support, and allied services within stringent regulatory contexts. The absence of BOQ quantities or specification makes pre-bid scoping essential, with emphasis on compliance and service flexibility to meet evolving needs.
Technical Specifications & Requirements
- Tender category emphasizes Repair, Maintenance, and Installation of Plant/Systems/Equipments within the electrical domain.
- No explicit technical specifications or standard references are provided in the data; bidders should infer capability in electrical system servicing, installation, and preventive maintenance.
- The presence of an ATC (Applicable Terms and Conditions) document indicates there are clause-based requirements and potential OEM or regulatory compliance expectations to review.
- A 25% quantity/duration variation is allowed by the buyer up to contract award and post-award, signaling flexibility in project scope and renewal of service windows. Prospective bidders should prepare for scope adjustments and demonstrate scalable resources.
- Given no BOQ items, emphasis should be on bidder capability, past performance in electrical systems maintenance, and adherence to DAE guidelines.
Terms, Conditions & Eligibility
- EMD/Security provisions: Not specified in the data; bidders must review ATC for exact deposit terms.
- Quantity/Duration variation: Up to 25% at issue and post-issuance; bidders must accept revised scope.
- ATC document referenced; compliance with Buyer Added Terms is required.
- No start/end dates, value, or delivery timelines disclosed; bidders should await official contract documents and align with internal capacity planning.
- Organization requires service-provider qualifications aligned with electrical maintenance and installation standards; ensure readiness to submit supporting documents per ATC.