Tender Overview
The procurement is issued by the Hqids under the Department of Military Affairs for a set of EW3603B electronic modules, including navigation light control, control, common, rectifier, LED, and AC/DC side MCB components. Scope specifies supply of goods with door delivery to MO(SVP) and inspection by DQA(N); the bid is to be executed via GeM with OEM/authorized seller requirements. Only one supplier, Waves Electronics Pvt Ltd (Ernakulum, Kerala), is mentioned as eligible on STE basis, with a need to confirm specification compliance and ATC. The BOQ lists a total of 6 items, indicating a multi-line quotation across related board-level modules and power components. The arrangement emphasizes compatibility, on-site acceptance, and pre/post inspection. GST treatment must align with government rates, and PSPP/partial payment provisions may apply per Central Defence accounting rules.
Technical Specifications & Requirements
Key technical expectations include:
- EW3603B-WE-NLCP navigational light control panel, EW3603B-WE164 control card, EW3603B-WE165 common card, EW3603B-WE167 rectifier card, EW3603B-GQ8B LED, EW3603B-5SL2107RC AC DC side MCB as listed in the tender category.
- Compliance with OEM/seller authorization and in-country after-sales support; delivery is to MO(SVP) via door-to-door service.
- Inspection modalities include DQA(N) pre-dispatch and post-receipt checks with I-NOTE accompanyment; pricing must reflect GeM breakdown including GST, freight, packing, and duties.
- Warranty periods and REMARKS: clause indicates a warranty term but specifics are not provided in the data.
Terms, Conditions & Eligibility
Key terms include:
- OEM IMPORTED PRODUCTS require an Indian-based office for after-sales support; certificate to be submitted.
- Delivery: door delivery to MO(SVP); inspection by DQA(N).
- Bids restricted to Waves Electronics Pvt Ltd on STE basis; must confirm compliance with specification/ATC.
- GST rates aligned to Govt rates; price breakdown must show GST and other charges.
- Payment/PSPP: partial supply and payment allowed under DPM-2009 provisions, subject to CFA approval; extended payment timelines require revalidated PBG valid for 14 months.
- Warranty: warranty period stated but not detailed; ensure alignment with supplier terms and Govt. requirements.
