Tender Overview
Power Grid Corporation Of India Limited invites bids for Providing service charges only for installation of Counter Poise earthing at Tower legs whose TFI value is >10 (Za Value) under the Bongaigaon TLM jurisdiction. Estimated value is ₹3,181,752.00 with an EMD of ₹64,000. Scope references GeM bid documents and Engineer/Officer-In-Charge directions; bidders must follow Buyer uploaded ATC terms. The package emphasizes compliance with Works & Procurement Policy and mandatory bid security/ERM submission. The option clause allows up to 25% quantity/duration adjustment before and after contract award, requiring bidder acceptance. This tender targets specialized installation services for transmission line towers within POWERGRID guidelines and ATC documents; BOQ items show zero line-item quantity, indicating a service-focused package and policy-compliant execution.
Technical Specifications & Requirements
- Scope: Installation of Counter Poise earthing at tower legs with TFI value >10 (Za Value) under Bongaigaon TLM jurisdiction
- Standards/ATC: Conforms to GeM bid document and Bidder Upload ATC; POWERGRID Works & Procurement Policy may be reviewed online
- EMD/Support: Submit Bid Security/EMD and all qualifying documents; technical bid must include filled Bid Forms
- Delivery/Compliance: Adhere to Engineer/Officer-In-Charge instructions and applicable clauses in tender documents; non-substantive responsiveness may lead to rejection
- Contract Flexibility: Option clause permits up to 25% adjustment in quantity or duration prior to contract issuance
Terms, Conditions & Eligibility
- EMD: ₹64,000 (as per terms); submit along with bid
- Delivery/Performance: Timely completion per GeM ATC and works policy; nonconformity leads to rejection
- Documentation: Include OEM/ATC documents, bid forms, and qualifying requirements; submission through GeM portal per POWERGRID ATC
- Policy Reference: Buyer uploaded Works & Procurement Policy Vol-I & Vol-II; documents prevail only as per bidding contract
- Contractual Rights: POWERGRID reserves rights to modify terms; substantial responsiveness is mandatory for eligibility