Tender Overview
The Indian Air Force, Department of Military Affairs, seeks supply, installation, testing, commissioning (SITC) of Glucose System Pack, Urea System Pack, Creatinine System Pack, Uric Acid System Pack, Cholesterol System Pack, Triglyceride System Pack, HDL/LDL System Packs, Total/Direct Bilirubin System Packs, SGOT/SGPT, and HbA1C System Packs for execution in JODHPUR, RAJASTHAN. The scope includes SITC of 13 items with associated training and any statutory clearances. The ATC emphasizes a flexible quantity clause up to 25% for contract quantities and currency periods. A dedicated service presence is required in the consignee’s state, with a 30-day window to establish service centers post award. Unique delivery-time computation and on-site/off-site warranty considerations shape planning.
Technical Specifications & Requirements
- Scope of Supply: Supply, Installation, Testing, Commissioning, and Operator Training; statutory clearances if any.
 - Delivery/quantity: Option clause permits +/- 25% quantity variation; delivery period calculated as (additional quantity/original quantity) × original delivery period, minimum 30 days.
 - Service & Support: Functional Service Centre in the state of each consignee location for carry-in warranty; establishment within 30 days if not present; documentary evidence for center required before payment; toll-free service line mandatory.
 - BOQ: 13 items listed; no item-wise quantities provided; base program requires 13-system packs across lab parameters.
 - Compliance: On-site or off-site warranty terms to be clarified; ensure availability of service support and OEM affiliation if required.
 
Terms, Conditions & Eligibility
- EMD/Bid Security: Not specified in data; bidders must review ATC for exact amount and format.
 - Delivery: Delivery period linked to original order; extended time rules apply per option clause; minimum 30 days.
 - Payment terms: Not specified; bidders should anticipate standard procurement terms with milestone-based payments.
 - Service: Must have dedicated toll-free support; establishment of service centers within 30 days post award; evidence submission required for payment.
 - Documentation: Manufacturer/OEM authorizations, GST, PAN, financials, and experience certificates likely required per ATC; confirm exact list during bid submission.