Tender Overview
Uttar Pradesh Social Welfare (Sanik Kalyan) Department signals a procurement of diverse household items including textiles, dinnerware, kitchen equipment, bedding, lighting, and basic furniture. Estimated value: ₹23,775,000 with an EMD of ₹475,500. Location: Uttar Pradesh; multiple categories under a single tender for social welfare supplies. The scope covers 24 item lines such as fabrics (sadi, blouse, peticot), dinner sets, cookware, bedding, wall clocks, ceiling fans, and safety items. A key differentiator is the broad mix of consumer goods under a single contract and the option to adjust quantity by up to 25% during and after contract award. The tender emphasizes compliance with government orders and official uploads of required documents. Unique clause: extended delivery time calculation and rate protection across quantity variations. The tender targets suppliers capable of handling large-scale public sector deliveries in UP and meeting ATC attaché/document upload requirements.
Technical Specifications & Requirements
- Total items: 24 categories; itemized types include textiles (03-05 categories), kitchenware (dinner set, cooker), bedding (gadda, mattress, takiya), furnishings (trolley bag, wall clock, ceiling fan), personal items (silver jal, payal, bichiya), and misc items (bleach, chuni, paint cloth).
- Estimated value: ₹23,775,000; EMD: ₹475,500.
- Delivery framework: option clause permits ±25% quantity variation; delivery time calculated as (additional quantity/original quantity) × original delivery period, with a minimum 30 days.
- Documentation: government orders referenced; mandatory uploading of requested documents per buyer instructions; ATC text applicable.
- Compliance focus: no explicit product standards listed; bidders must align with ATC and government order directives and ensure timely delivery across UP.
Terms, Conditions & Eligibility
- EMD: ₹475,500; to be deposited as specified in bid terms.
- Quantity flexibility: up to 25% increase/decrease during contract and currency; extended delivery period triggers calculated time extension.
- Delivery timeline: calculated method; minimum 30 days for added quantity; original delivery period governs base terms.
- Documentation requirements: upload and retention of documents per government orders; compliance with the stated ATC clauses.
- ATC compliance: adhere to supplier terms and government directives; installation and delivery must align with UP Social Welfare procurement policies.
- Vendors must be prepared for extended verification and auditable records per official notices.