Tender Overview
The Health Department Andaman & Nicobar invites bids for an Online UPS system rated >10 KVA with battery backup. The project carries an EMD ₹12,500 and focuses on supplying a UPS with performance parameters including input/output voltage (AC, 50 Hz), efficiency, and overload capacity. The tender emphasizes installation and commissioning by OEM-certified resources and requires adherence to end-user documentation formats. No BOQ quantity is listed, yet the scope centers on procurement of a complete, install-ready UPS solution for critical health infrastructure within the Andaman & Nicobar administration. Key differentiators include mandatory inbuilt isolation transformer, specified operating temperature range, and mounting type expectations. Unique eligibility hinges on prior government supply experience and OEM authorization. This tender is a procurement for reliable power protection equipment to support health services continuity.
Technical Specifications & Requirements
- Category: Performance Parameters; Rating (KVA); Input Voltage: AC 50 Hz; Output Voltage: AC 50 Hz
- Category: Construction; Inbuilt Isolation Transformer availability; Overall Efficiency (%); Minimum Overload Capacity for online UPS
- Category: Battery/Backup Bank; Type of Battery; Backup Time requirement
- Category: Features; Mounting Type; Operating Temp Range (lower/upper)
- Delivery/Installation: Installation, Commissioning, Testing, Configuration to be done by OEM-certified personnel; OEM authorization required when submitting bids
- Documentation: End User Certificate if requested; emphasis on non-obsolescence with at least 7 years residual OEM life
Terms, Conditions & Eligibility
- EMD: ₹12,500 to be submitted with bid
- Experience: Minimum 3 years of regular supply to Central/State Govt/PSU for similar UPS products; provide contracts supporting yearly quantities
- Authorizations: OEM authorization or authorized distributor certificate required; installation/commissioning by OEM resources
- Delivery Terms: Delivery commitments must be met within the stipulated period; non-delivery triggers termination rights
- Warranty/Support: Accessory inclusions and standard industry practice items to be supplied; penalties and performance considerations apply