Tender Overview
Organization: Rourkela Steel Plant (SAIL) seeks supply of cable drums/reels/spools under multiple item categories. The procurement scope is limited to the supply of goods with mandatory GTP (Guaranteed Technical Particulars) and QAP (Quality Assurance Plan) approval before manufacturing. Each reel must feature clearly visible meter-length markings on both sides, and reel lengths must adhere to the ordered length within a ±5% tolerance. The contract contemplates quantity fluctuations up to 25% during and after award, with delivery timelines linked to the original delivery period, minimum 30 days. The tender emphasizes accurate Data Sheets, GST-compliant invoicing, and alignment with IS/IEC cable testing standards. Location is unspecified; tender is positioned as a government-style GeM procurement.
Technical Specifications & Requirements
- GTP (Guaranteed Technical Particulars) & QAP approval is mandatory before manufacturing.
- Each cable drum/reel/spool must show permanent length markings in meters on both sides.
- Reel length must match ordered length within ±5% tolerance; deviations beyond ±5% lead to rejection or capped payment at +5%.
- Gross weight, net weight, tare weight must be stenciled on each reel and listed in packing list.
- Provide a certified length tally sheet or digital print-out for each drum.
- Unit weight per meter (kg/m) and total net weight must be provided for length verification.
- Cables must be manufactured and tested as per relevant IS/IEC standards with test certificates.
Terms & Eligibility
- Option Clause: Purchaser may alter quantity by up to 25% during and after contract at contracted rates.
- Bidders must declare reel lengths and maintain tolerance, with additional time calculation rules starting from last delivery date.
- GST remains bidder’s responsibility; GST reimbursement is subject to actuals or applicable rates with a ceiling at quoted GST%.
- Data Sheet verification is mandatory; mismatches may lead to rejection.
- Invoices via GeM require GST invoice copy and GST portal payment screenshot.
- Scope: Only supply of goods; no services included.
- Compliance with GTP/QAP prior to manufacturing is non-negotiable.