Tender Overview
Bharat Heavy Electricals Limited (BHEL) seeks supply of 1260 KW Turbine Oil Cooler (PHE) with Plate Material SS304 as per Spec. HE 57075 for deployment in RAIGAD, MAHARASHTRA. Procurement involves two variant references: Var 01 and Var 00, with detailed plate material and standard alignment. Estimated value and EMD are not disclosed in the available data. The contract includes an option clause permitting up to 25% quantity variation at contracted rates, with delivery timing calculated relative to the original delivery period and subject to a minimum of 30 days. The award relies on compliance with documentation and data-sheet verification. Unique aspects include the requirement to attach a comprehensive data sheet and to meet the specified welding/plate standards. This tender emphasizes strict adherence to Data Sheet alignment and ATC provisions.
Technical Specifications & Requirements
- Product name: Turbine Oil Cooler (PHE) for 1260 KW applications
- Variants: Var 01 and Var 00 as per Spec. HE 57075
- Plate material: SS304 for both variants
- Data sheet requirement: Upload a complete Data Sheet; mismatch may lead to bid rejection
- Warranty: 36 months from dispatch or 18 months from commissioning, whichever earlier
- Payment terms: 100% payment after site receipt acknowledgment and submission of billing documents; MSEs 45 days, SMEs 60 days, non-MSMEs 90 days
- Delivery terms: Delivery clause allows quantity extension up to 25% during contract; delivery timeline linked to last date of original order, minimum 30 days
- Certificate/ATC: Ensure all certificates requested in bid document/ATC are uploaded; non-compliance risks rejection
Terms, Conditions & Eligibility
- EMD/security and certificates: Upload all certificates/documents requested in bid and ATC; non-compliance triggers rejection
- Warranty/guarantee: 36-month warranty from dispatch or 18 months from commissioning
- Payment: 100% payment post-delivery with verified billing documents; MSMEs receive preferential timelines
- Data sheet alignment: Data Sheet must match offered product specifications; mismatches can cause rejection
- Delivery flexibility: Option to increase quantity up to 25% with adjusted delivery period; extended time rules apply
- Termination and risk: Purchaser may terminate for non-compliance or inability to deliver; financial remedies reserved