GEM

Jawaharlal Nehru Port Trust 3 Phase 4 Wire LT CT Operated Static Energy Meter Tender 2025

Posted

17 Oct 2025, 11:42 pm

Deadline

08 Nov 2025, 11:00 am

Progress

Issue17 Oct 2025, 11:42 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

10

Bid Type

Two Packet Bid

Categories 4

Tender Overview

The procuring organization is the Jawaharlal Nehru Port Trust, seeking supply of a 3 phase 4 wire LT CT operated static energy meter. The scope is limited to the supply of goods, with no BOQ quantities published. Key commercial terms include an option clause allowing up to 25% quantity variation at contracted rates and an award/delivery framework that may extend delivery timelines. A minimum 1-year warranty is required, with OEM warranties submitted at delivery and a requirement for an established India-wide after-sales service network. The tender stresses the necessity of OEM authorization, and BIS certification alongside OEM catalogues detailing specifications. This opportunity targets bidders capable of meeting installation/training/maintenance support requirements near consignee locations. The absence of explicit BOQ items suggests a generic supply contract environment with emphasis on conformity to standards and after-sales readiness. The tender emphasizes qualification criteria and supplier reliability as differentiators in a largely supply-based procurement.

Technical Specifications & Requirements

  • Product: 3 phase 4 wire LT CT operated static energy meter
  • Standards/Certifications requested: BIS certificate; OEM authorization certificate; OEM catalogue with detailed specifications
  • Documentation: mandatory test reports/calibration certificates for each offered item; installation, commissioning, training, and maintenance capabilities within India
  • Warranty: Minimum 1 year from supply/acceptance; OEM warranty certificates to be submitted at delivery; after-sales service network details to be uploaded
  • Delivery/Scope: scope limited to supply of goods; delivery period not explicitly defined in available data; option to extend delivery time with a defined formula
  • Additional: ensure OEM authorization and presence of service centers near consignee destinations

Terms, Conditions & Eligibility

  • EMD/ security deposit details are not specified in the provided data, but bidders must comply with standard tender security practices
  • Warranty: at least 1 year or as per OEM; warranty validity from final acceptance date
  • Delivery terms: delivery commencement tied to last date of the original delivery order; option-based extension mechanics included
  • Documentation: submit OEM authorization certificate, BIS certificate, OEM catalog with specifications, and mandatory test/calibration certificates
  • Post-sales: well-established installation, commissioning, training, troubleshooting, and maintenance service group; service centers in India to be disclosed
  • Other clauses: bidders must comply with the generic option clause for quantity variation up to 25% during contract and extended period

Key Specifications

  • Product/service: 3 phase 4 wire LT CT operated static energy meter

  • Quantities: not specified (scope limited to supply of goods)

  • Estimated value: not provided

  • Experience: prior supply of energy meters preferred

  • Quality/standards: BIS certificate; OEM authorization; ISO/IEC not specified

  • Warranty: minimum 1 year from supply/acceptance

  • Testing: mandatory calibration/test reports with bid

Terms & Conditions

  • Option clause allows ±25% quantity variation during and after contract

  • 1-year warranty; OEM warranty certificates required at delivery

  • OEM authorization certificates and BIS certification mandatory

  • Installation/commissioning/maintenance network must be India-based

  • Test reports/calibration certificates required with material

Important Clauses

Payment Terms

Not specified in data; bidders should anticipate standard govt tender terms and ensure compliance with EMI/TDS and supplier payment vectors per contract

Delivery Schedule

Delivery period tied to last date of original delivery order; extended period applicable based on option clause with a minimum 30 days and proportional calculation

Penalties/Liquidated Damages

Not specified; standard procurement practice may include LD for late delivery or non-conformity, to be confirmed in final terms

Bidder Eligibility

  • Must provide OEM Authorization Certificate

  • Must hold BIS certification for offered meters

  • Must demonstrate India-based after-sales service capability with local centers

AI-Powered Bidder Prediction

Companies most likely to bid

Unlock Bidder Insights

AI predictions on likely bidders

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar energy meter supply

4

Financial statements or turnover documents

5

EMD/Security deposit submission proof

6

OEM Authorization Certificate

7

OEM catalogue with detailed specifications

8

BIS certificate and calibration/test reports for offered meters

9

Documentation evidencing after-sales service capability and location of service centers

Frequently Asked Questions

How to bid for 3 phase energy meter tender in Mumbai 2025

Bidders must submit OEM authorization, BIS certificate, OEM catalog with specifications, and calibration/test reports. Include installation/training capability and service centers in India. Ensure compliance with the option clause for 25% quantity variation and provide warranty certificates covering at least 1 year.

What documents are required for energy meter procurement bid in Maharashtra

Required documents include GST, PAN, experience certificates for similar meters, financial statements, EMD submission proof, OEM authorization, BIS certificate, OEM catalog, and calibration/test reports. Also provide service center locations and installation capabilities within India.

What standards apply to energy meters in this JNPT tender

Bidders must provide BIS certification and an OEM authorization certificate; meters should come with calibration/test reports and OEM catalogs detailing specifications. The tender emphasizes conformity to national quality standards and after-sales support requirements.

When is the delivery schedule for the JNPT meter supply tender

Delivery is governed by the last date of the original delivery order; the option clause permits up to 25% quantity variation with a proportional extension. If extended, minimum additional time is 30 days, calculated as (increase/original) × original delivery period.

What warranty is required for supplied static energy meters

A minimum warranty of 1 year from the date of supply/acceptance or as per OEM terms. OEM warranty certificates must be submitted at delivery, and the seller must guarantee rectification during the warranty period.

What are the post-sales service requirements for meters

Bidder must have a well-established installation, commissioning, training, troubleshooting, and maintenance service group in India, with service centers near consignee destinations disclosed with the bid.

What is required in OEM catalog submissions for this tender

Submit OEM authorization, detailed specifications in the catalog, and calibration/test certificates. The catalog should clearly map to the offered 3 phase 4 wire LT CT operated static energy meter and confirm BIS/ISO compliance where applicable.

Similar Tenders

Purchase of Three phase static meters of 10-60A - 33550 Nos.

RAJKOT, GUJARAT

EMD: ₹3.0 L
View Details

Purchase of Three Phase HT ERS Meter with external sets of CTs-07 no.

RAJKOT, GUJARAT

EMD: ₹40,000
View Details