Tender Overview
The Uttar Pradesh Urban Development Department invites bids for Mobile Containers For Solid Waste conforming to IS 12402 in Hardoi, Uttar Pradesh (PIN 241001). The procuring organization is the E-municipalities - Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh. The tender seeks a defined quantity with a potential 25% quantity variation at contract award and during the contract period, at contracted rates. An EMD of ₹4,64,580 applies. Bidders must demonstrate financial turnover compliance and OEM turnover, with separate criteria for primary product categories. The initiative targets reliable municipal waste handling equipment and requires bidders to align with local service infrastructure expectations and delivery timelines.
Technical Specifications & Requirements
There are no explicit technical specifications in the data. However, the BOQ category indicates procurement of IS 12402 compliant mobile waste containers, which implies adherence to standard dimensions, material quality, corrosion resistance, locking mechanisms, and ergonomic handling. The tender requires the bidder to provide documented turnover evidence (three-year average) and OEM turnover, along with a stated service-centre strategy within the state of the consignee. Optional quantity increases must be managed with minimum 30 days additional time or calculated adjustments based on the original delivery period.
Terms, Conditions & Eligibility
Key eligibility elements include:
- EMD: ₹4,64,580 (as specified in bid terms)
 - Turnover criteria: three-year average turnover as per bid document; auditedBalance Sheets or CA certificate required
 - OEM turnover: same three-year criterion for the OEM of the offered product; in bunch bids, the primary product OEM must meet the criterion
 - Service & Support: functional service centre in the state of each consignee location for carry-in warranty; if absent, establishment within 30 days of award
 - Quantity flexibility up to 25% during and after placement of contract
 - Delivery timelines tied to original and extended periods, with minimum 30 days escalation