Open State Governments & UT NPROCURE

Tender for Construction & Operation of 100 TPD Bio-CNG Plant in Ahmedabad on PPP Model

Bid Publish Date

25-Nov-2025, 2:00 pm

Bid End Date

09-Dec-2025, 6:00 pm

Value

₹90,00,00,000

Progress

Issue25-Nov-2025, 2:00 pm
AwardPending
Explore all 4 tabs to view complete tender details

Tender Type

Open

Sector

State Governments & UT

Tender Fee

₹18,000

Contract Form

Works

Completion Period

As per tender Document Attached

Currency Type

Single

Categories 7

The Ahmedabad Municipal Corporation has issued an exciting tender for the design, construction, financing, and operation of a 100 TPD Bio-CNG plant. This project aims to convert municipal organic waste into renewable energy, supporting sustainable waste management and green energy initiatives in Gujarat. The PPP model encourages private sector participation, offering a 10-year operational period with significant environmental benefits. Bidders with proven experience in waste-to-energy projects, infrastructure development, and renewable energy solutions are invited to submit their proposals. The project includes comprehensive scope, technical specifications, and evaluation criteria, ensuring transparency and adherence to environmental standards. This tender presents a valuable opportunity for companies seeking to contribute to sustainable urban development and renewable energy generation while partnering with the government for a cleaner future.

Scope Of Work

The scope of work involves the complete design, construction, financing, and operational management of a 100 TPD Bio-CNG plant at Ahmedabad. Key deliverables include:

  • Design and engineering of the plant based on specified capacity and environmental standards.
  • Construction of the plant infrastructure including waste processing units, biogas digesters, and CNG compression facilities.
  • Procurement and installation of equipment such as biogas reactors, compressors, and safety systems.
  • Operation and maintenance of the plant for a period of 10 years.
  • Ensuring compliance with local environmental and safety regulations.

The process involves the following sequential steps:

  1. Feasibility study and detailed project report submission.
  2. Design approval by AMC.
  3. Construction and commissioning of the plant.
  4. Operational phase including waste collection, processing, and CNG production.
  5. Monitoring and reporting to AMC.
Specification Details
Capacity 100 TPD
Waste Type Organic & biodegradable waste
Energy Output Bio-CNG
Project Duration 10 years

The bidder must ensure the plant meets all technical, safety, and environmental standards as specified in the tender documents.

Technical Specifications

The plant must adhere to the following technical parameters:

Parameter Specification
Capacity 100 TPD
Waste Type Organic and biodegradable waste
Biogas Production Minimum 2500 Nm³/day
CNG Compression Up to 200 bar
Equipment Standards IS/ISO certified

Sequential procedures include:

  1. Submission of detailed technical proposal.
  2. Technical review and approval by AMC.
  3. Procurement of equipment as per approved specifications.
  4. Construction, installation, and commissioning.
  5. Testing and quality assurance before plant operation.

All technical components must meet the standards outlined in the tender documents and relevant environmental norms.

Financial Requirements

The estimated project cost is approximately Rs. 90 crore, which includes design, construction, equipment procurement, and initial operational expenses. The financial breakdown is as follows:

Cost Component Estimated Cost (Rs.)
Design & Engineering 10 million
Construction & Infrastructure 60 million
Equipment & Machinery 15 million
Miscellaneous & Contingencies 5 million

Payment terms are structured as follows:

  • 10% advance upon contract signing.
  • 40% during construction milestones.
  • 50% post-commissioning and acceptance.

Bidders must provide detailed financial proposals, including operational cost estimates, revenue projections from CNG sales, and financing arrangements, ensuring transparency and viability of the project.

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Eligibility Criteria

  • ✓ Must have valid registration and licenses for waste management or renewable energy projects.
  • ✓ Proven experience in designing, constructing, or operating waste-to-energy or biogas plants.
  • ✓ Financial stability with minimum turnover as specified in the detailed tender document.
  • ✓ Submission of necessary documents including tender fee, EMD, and other required certifications.
  • ✓ Compliance with all statutory and environmental regulations.
Financial Criteria Details
Minimum Annual Turnover Rs. 100 million
Net Worth Rs. 50 million
Experience At least 3 similar projects in the last 5 years

Critical: Bidders must submit all required documents for primary eligibility verification, including tender fee and EMD, to qualify for further evaluation.

Bidding Process

Process Timeline

1. Primary Stage

11-12-2025 11:00

2. Commercial Stage

Required Forms

Primary

Tender Fee Form

Library-Standard

Required

Emd Fee Form

Library-Standard

Required

Commercial

Price Bid.

User Defined Template-Secured

Required

Required Documents

Stage - Primary Stage

1

Scan copy of tender fee

Required
2

Scan copy of emd

Required
3

Scan copy of other necessary documents as per tender

Required

Frequently Asked Questions

Key insights about GUJARAT tender market

What is the main objective of this tender?

This tender aims to select a qualified partner to design, build, finance, and operate a 100 TPD Bio-CNG plant in Ahmedabad, focusing on waste-to-energy conversion and sustainable municipal waste management under a PPP model.

What are the eligibility requirements for bidders?

Eligible bidders must have valid licenses, proven experience in waste-to-energy or biogas projects, a minimum annual turnover of Rs. 100 million, and must submit all required documents, including tender fee and EMD, as specified in the tender notice. They should also comply with environmental and statutory norms.

What is the project duration and scope?

The project duration is 10 years, covering design, construction, operation, and maintenance of the Bio-CNG plant. The scope includes waste processing, biogas production, CNG compression, and adherence to safety standards as detailed in the tender documents.

How can bidders participate in the tender process?

Bidders must download the tender documents, attend the pre-bid meeting, and submit their technical and financial bids online before the deadline. The process includes bid opening, evaluation, and award based on predefined criteria. All submissions must be complete and compliant.

What are the key dates and deadlines for this tender?

Key deadlines include:

  • Bid Submission Start: 25-11-2025
  • Bid Submission End: 09-12-2025
  • Bid Opening: 11-12-2025
  • Evaluation & Award: by 20-12-2025

Bidders should ensure timely submission to avoid disqualification.