Supply, installation, commissioning, and testing of CGWA complied digital water flowmeter with tele
Central Coalfields Limited
HAZARIBAG, JHARKHAND
Menu
Bid Publish Date
16-Dec-2025, 2:10 pm
Bid End Date
06-Jan-2026, 6:00 pm
Location
Progress
Tender Type
Open
Sector
State Governments & UT
Tender Fee
₹30,000
Contract Form
Works
Completion Period
30 Months
Currency Type
Single
This government tender offers a unique opportunity for companies specializing in water infrastructure, automation, and civil engineering to participate in a major project in Gandhinagar, Gujarat. The project involves designing, supplying, installing, and maintaining a Centralized Flow Monitoring System for water transmission and distribution networks. The scope includes advanced flow meters, wireless RTUs, civil and electro-mechanical works, and system integration to enable real-time water flow monitoring. The project duration is 30 months, with a comprehensive operation & maintenance plan for 10 years. Bidders must meet strict eligibility criteria, including technical capability and financial stability. This tender aims to improve water management efficiency, reduce losses, and support Gujarat's water infrastructure development goals. The process is transparent, with clear evaluation criteria and deadlines, inviting qualified companies to submit competitive bids and contribute to sustainable water management solutions.
The scope of work involves:
| Key deliverables | Specifications |
|---|---|
| Flow meters | Accurate, durable, suitable for water flow |
| Wireless RTU | Reliable wireless data transmission |
| Civil works | Foundations, enclosures, mounting structures |
| System integration | Seamless data flow into the central system |
The process involves:
All equipment must comply with applicable standards and certifications.
The technical specifications include:
| Parameter | Requirement |
|---|---|
| Flow meters | Electromagnetic or ultrasonic, accuracy ±1% |
| Wireless RTU | Compatible with existing SCADA systems, IP67 rated |
| Power supply | 230V AC with backup options |
| Data transmission | Wireless, secure, real-time |
| Civil enclosures | Weatherproof, tamper-proof |
| Certification | ISO 9001, IEC standards |
The installation process involves:
All equipment must be compliant with Indian standards and certified by authorized bodies. The system should support remote monitoring and data analytics for efficient water management.
The estimated project budget ranges from Rs. 2 crore to Rs. 3 crore, inclusive of all civil, electro-mechanical, and software components. The financial proposal should include:
| Cost Component | Estimated Cost |
|---|---|
| Equipment Supply | Rs. [amount] |
| Civil & Mechanical Works | Rs. [amount] |
| Installation & Commissioning | Rs. [amount] |
| Operation & Maintenance (10 years) | Rs. [amount] |
Payment terms are structured as:
Bidders should submit detailed cost breakdowns and ensure adherence to the budget constraints. All financial proposals must be valid for 180 days from the bid submission date.
Central Coalfields Limited
HAZARIBAG, JHARKHAND
Central Coalfields Limited
HAZARIBAG, JHARKHAND
Oil And Natural Gas Corporation Limited
WEST TRIPURA, TRIPURA
Oil And Natural Gas Corporation Limited
ANAND, GUJARAT
Oil And Natural Gas Corporation Limited
JORHAT, ASSAM
Tender Results
Loading results...
Discover companies most likely to bid on this tender
Bidders must meet the following eligibility criteria:
| Qualification Requirements | Details |
|---|---|
| Minimum turnover | Rs. [specified amount] |
| Past project experience | At least 2 similar projects in last 5 years |
| Certification | Valid ISO and relevant industry certifications |
| Financial documents | Audited financial statements for last 3 years |
Note: Bidders must upload all required documents during submission and ensure compliance with all eligibility conditions to qualify for evaluation.
08-01-2026 12:00
08-01-2026 12:05
08-01-2026 12:10
Tender Fee Form
Library-Standard
Emd Fee Form
Library-Standard
FORM 0
User Defined Template-Standard
FORM I Flow Meter
User Defined Template-Standard
FORM – 3 Flow Meter
User Defined Template-Standard
FORM - 6 Flow Meter
User Defined Template-Standard
FORM - 5 Flow Meter
User Defined Template-Standard
Form - 8 Flow Meter
User Defined Template-Standard
FORM - 9 Flow Meter
User Defined Template-Standard
FORM – 10 Flow Meter
User Defined Template-Standard
FORM – 11 Flow Meter
User Defined Template-Standard
FORM - 12 Flow Meter
User Defined Template-Standard
FORM - 13 Flow Meter
User Defined Template-Standard
FORM - 14 Flow Meter
User Defined Template-Standard
FORM - 15 Flow Meter
User Defined Template-Standard
FORM-7 Flow Meter
User Defined Template-Standard
FORM – 16 Flow Meter
User Defined Template-Standard
FORM – 17 Flow Meter
User Defined Template-Standard
Form-20 (Form-3A) Flow Meter
User Defined Template-Standard
Form-25 Flow Meter
User Defined Template-Standard
FORM – 2 Flow Meter
User Defined Template-Standard
FORM - 4 Flow Meter
User Defined Template-Standard
FORM - 4 Flow Meter
User Defined Template-Standard
FORM - 5 Flow Meter
User Defined Template-Standard
Percentage Rate
User Defined Template-Secured
Upload scan copy of tender fee DD
RequiredUpload scan copy of EMD FDR/BG
RequiredProvide any proof of Bid Processing Fee
Provide any proof of EMD Document
Upload Supporting Documents
RequiredKey insights about GUJARAT tender market
This tender involves the design, supply, installation, testing, and commissioning of a Centralized Flow Monitoring System for water transmission and distribution networks in Gandhinagar. It includes SITC of flow meters, wireless RTUs, civil and electro-mechanical works, system integration, and operation & maintenance for 10 years. The goal is to enhance water management efficiency through real-time data collection and centralized monitoring.
Eligible bidders must meet criteria such as:
The system requires electromagnetic or ultrasonic flow meters with ±1% accuracy, wireless RTUs compatible with SCADA, weatherproof enclosures, and reliable wireless data transmission. All equipment must meet ISO 9001 and IEC standards. Installation involves site assessment, equipment mounting, calibration, and system integration. The entire setup should support remote monitoring and data analytics for optimal water management.
Bidders must download tender documents by 16th December 2025 and participate in vendor training sessions if required. The final bid submission deadline is 6th January 2026 at 6:00 PM. Bids should be submitted electronically via the official portal, including all technical and financial documents. Evaluation will occur post-submission, with successful bidders notified within 15 days of evaluation completion.
Bids will be evaluated based on:
Sign up now to access all documents
TENDER_DOCUMENT
TENDER_DOCUMENT
TENDER_DOCUMENT
TENDER_DOCUMENT
TENDER_DOCUMENT
TENDER_DOCUMENT
Choose from flexible plans to access tender documents instantly
TENDER_DOCUMENT
TENDER_DOCUMENT
TENDER_DOCUMENT
TENDER_DOCUMENT
TENDER_DOCUMENT
TENDER_DOCUMENT