Menu
Progress
Tender Type
Open
Sector
State Governments & UT
Tender Fee
₹6,000
Contract Form
Fixed-rate
Completion Period
6 Months
Currency Type
Single
This government tender offers a unique opportunity for civil construction companies to participate in resurfacing existing bituminous roads in Vyara, Gujarat, under the Sadak Yojana 2025 scheme. With an estimated project value of approximately 39.81 million INR and a completion timeline of 6 months, the project aims to improve transportation infrastructure and road safety. Bidders must meet strict eligibility criteria, including experience in similar government projects, financial stability, and statutory compliance. The tender process involves detailed documentation, site inspections, and competitive bidding through the official portal. This initiative is vital for regional development, offering qualified contractors a chance to contribute to urban infrastructure enhancement while adhering to high standards of quality, safety, and environmental norms.
The scope of work includes:
The process involves the following sequential steps:
| Specification | Details |
|---|---|
| Estimated Cost | 39,81,21,000 INR |
| Completion Period | 6 months |
| Contract Type | Fixed-rate |
All works must conform to the technical standards specified in the tender documents, including safety and environmental regulations.
The technical specifications include:
| Parameter | Requirement |
|---|---|
| Road Surface | Bituminous asphalt with specified thickness |
| Material Quality | Conforming to IS standards (e.g., IS 73:2013) |
| Compaction | Minimum 95% of maximum density |
| Thickness | As per tender specifications, typically 50-75 mm |
| Equipment | Vibratory rollers, pavers, and graders |
Sequential procedures:
All works must adhere strictly to technical standards, environmental norms, and safety regulations specified in the tender documents.
The total estimated project cost is approximately 39.81 million INR. The financial proposal must include a detailed cost breakdown covering materials, labor, equipment, and overheads. Payment will be made in accordance with milestones specified in the contract, typically after completion of each phase and approval of quality checks.
| Cost Component | Percentage of Total Cost |
|---|---|
| Material | 40% |
| Labor | 30% |
| Equipment | 20% |
| Miscellaneous | 10% |
Bidders must submit an earnest money deposit (EMD) equivalent to a specified amount, along with bid security documents. Payment terms include advance, progress payments, and final settlement post-completion, subject to certification and approval.
Discover companies most likely to bid on this tender
| Qualification Parameter | Minimum Requirement |
|---|---|
| Financial Turnover | 30% of estimated cost |
| Similar Projects | 3 projects (50%), 2 projects (70%), 1 project (90%) |
| Registration | Gujarat State PWD/CPWD Class-A |
| Solvency | 20% of tender amount |
| Statutory Documents | GST, I.T. returns, E.P.F. registration |
All documents must be valid, attested, and submitted within the stipulated deadline.
01-01-2026 11:30
01-01-2026 11:32
Tender Fee Form
Library-Standard
Emd Fee Form
Library-Standard
Percentage Rate
Library-Secured
Average Annual financial turnover during the last 3 years i.e. from 01/04/2023 should be at least 30 percentage of the estimated Cost. (C.A. Certificate must be attached)
RequiredExperience of having successfully completed similar works during last 5 years ending last day of month previous to the one in which applications are invited should be either of the following:
RequiredThree similar completed work costing not less than the amount equal to 50 percentage of the estimated cost OR
RequiredTwo similar completed work costing not less than the amount equal to 70 percentage of the estimated cost OR
RequiredOne similar completed work costing not less than the amount equal to 90 percentage of the estimated cost Note: Similar Work Shall mean construction of similar type work as mentioned in tender documents in any of government organizations only.
Requiredthe details ofComponent wise work and amount as per criteria shown in form-3A is necessary.
RequiredSubmission of completion certificate in Form 3A format. And Form-3A of Completed Work in Joint Venture are not Valid and Form-3A of Completed Work Only and notarized copy of work order and final Bill should be attached with from-3A (Running Bill Detail Are Not Valid).
Required. The Contractors/Companies having registration of Gujarat State PWD/CPWD of Registration Class –A, & above in Road , Special cate.- III(must be attached)
RequiredThe Contractors/Companies having solvency certificate of National and Schedule Bank amounting 20 percentage of Tender Amount). (must be attached)
RequiredAverage Annual financial turnover during the last 3 years:
RequiredAverage Annual financial turnover during theLast 3 year ending 31/03/2025 of the Previous financial year
RequiredAttested copies of C.A. certificate must be: Attached
RequiredNo. of works completed as per following (The details shall be furnishing in prescribed)
Requiredof works with: its amount Completed Attested copies of completion Certificates for Each completed from the client mentioned Shall have to be attached.:
RequiredSolvency Certificate of Nationalized Bank for current year of (20 percentage of tender amount).
RequiredNo exemption is allowed in Solvency Certificate.
RequiredG.S.T Certificate (must be attached)
RequiredLatest I.T.Return copy of Last Year for More than One-Year-old register Only (must be attached)
Required. E.P.F Registration (must be attached)
RequiredThe applicant is Compulsory to have visited the project site before submitting Price bid and tender documents. No cost for any clarification or visit to site etc. will be reimbursed by the employer.
RequiredContactor should not be black listed anywhere in India Written on Company latter pad (must be attached.)
RequiredProvide any proof of Bid Processing Fee
RequiredProvide any proof of EMD Document
RequiredKey insights about GUJARAT tender market
The bid submission deadline is on 20th December 2025 at 18:00 hours. Bidders must ensure all documents are uploaded and submitted before this cutoff to avoid disqualification.
Eligible bidders must have:
The technical specifications require that all road resurfacing works conform to IS standards (e.g., IS 73:2013). The materials used must meet quality benchmarks, and equipment like vibratory rollers and pavers must be compliant. The process includes surface cleaning, removal of damaged layers, primer application, bituminous laying, and compaction, ensuring durability and safety of the roads.
Bids will be evaluated based on:
Bidders must submit:
Sign up now to access all documents
TENDER_DOCUMENT
TENDER_DOCUMENT
TENDER_DOCUMENT
TENDER_DOCUMENT
TENDER_DOCUMENT
TENDER_DOCUMENT
TENDER_DOCUMENT
Choose from flexible plans to access tender documents instantly
TENDER_DOCUMENT
TENDER_DOCUMENT
TENDER_DOCUMENT
TENDER_DOCUMENT
TENDER_DOCUMENT
TENDER_DOCUMENT
TENDER_DOCUMENT