• Replacement of failed transformers to restore power supply in designated rural areas.
• Capacity augmentation of existing transformers to meet increased load demands.
• De-augmentation transfer of transformers to optimize network efficiency.
• Installation and commissioning of new transformers as per specified technical standards.
• Testing and quality assurance to ensure compliance with safety and performance norms.
• Coordination with PGVCL officials for site readiness and project execution.
• Documentation and reporting of progress and completion.
- Bid submission and documentation review.
- Site inspection and assessment.
- Procurement of transformers and related equipment.
- Installation, testing, and commissioning.
- Final inspection and handover.
| Technical Specifications |
Details |
| Transformer Capacity |
100 kVA to 250 kVA |
| Voltage Rating |
11 kV / 0.433 kV |
| Efficiency |
Minimum 98% |
| Standards |
IS 1180 / IEC standards |
• Bidder responsibilities include ensuring timely delivery, adherence to safety protocols, and compliance with all statutory requirements.