Gujarat Water Infrastructure Limited has issued an open tender for the design, construction, testing, and commissioning of an RCC Under Ground Sump and Pump House at Dudhrej Pumping Station, Surendranagar. This project includes supply, installation, and comprehensive Operation & Maintenance (O&M) support for 10 years, aimed at enhancing water supply infrastructure in Gujarat. The tender invites experienced civil and electro-mechanical contractors to submit competitive bids before the deadline of 18th November 2025. The project emphasizes quality, safety, and sustainability, aligning with government water management initiatives. Bidders must meet strict eligibility criteria, including technical expertise, financial stability, and compliance with technical standards. Download detailed tender documents and participate in the transparent bidding process to secure this significant government contract, contributing to Gujarat's water infrastructure development.
Gujarat Water Infrastructure Ltd Tender for RCC Pumping Station Construction & O&M
Posted
17 Oct 2025, 02:25 pm
Deadline
18 Nov 2025, 12:30 pm
EMD
₹26,21,500
Location
Progress
Tender Type
Open
Sector
State Governments & UT
Tender Fee
₹24,000
Contract Form
Works
Completion Period
18 Months
Currency Type
Single
   
Categories
 12  
  Scope Of Work
The scope of work encompasses:
- Designing, constructing, testing, and commissioning of RCC Under Ground Sump and RCC Pump House at Dudhrej Pumping Station.
- Supply, installation, and commissioning of pumping machinery and related electro-mechanical equipment.
- Civil works including foundation, structural, and finishing as per approved technical specifications.
- Integration of instrumentation and control systems for efficient operation.
- Operation & Maintenance (O&M) services for a period of 10 years post-commissioning.
The process involves:
- Site preparation and foundation work as per technical drawings.
- Structural construction of RCC sump and pump house.
- Supply and installation of pumps, motors, and electrical systems.
- Testing and commissioning of all installed systems.
- Handover and training for operational staff.
- Ongoing maintenance and support for 10 years.
| Key Deliverables | Specifications | 
|---|---|
| RCC Under Ground Sump | Capacity as per technical drawings | 
| RCC Pump House | Structural integrity, waterproofing | 
| Pumping Machinery | High-efficiency pumps, energy-saving motors | 
| Instrumentation | SCADA system integration | 
| Operation & Maintenance | 10-year comprehensive support | 
Bidder must adhere to all technical standards, safety norms, and environmental regulations specified in the tender documents.
Technical Specifications
The technical specifications include:
| Parameter | Requirement | 
|---|---|
| RCC Sump Capacity | As per detailed drawings, minimum 500 m³ | 
| Pumping Machinery | Submersible or vertical turbine pumps with efficiency >85% | 
| Electrical Systems | Three-phase, 415V, 50Hz, compliant with IS standards | 
| Instrumentation | SCADA compatible, remote monitoring capable | 
| Structural Materials | Reinforced concrete with specified grade (M30 or higher) | 
The process involves:
- Reviewing technical drawings.
- Procuring equipment as per specifications.
- Ensuring installation meets safety and quality standards.
- Conducting comprehensive testing before commissioning.
All technical parameters must comply with BIS standards and project-specific requirements outlined in the tender documents.
Financial Requirements
The estimated project cost ranges from INR 50 million to INR 80 million. The financial breakdown includes:
| Cost Component | Estimated Cost (INR) | 
|---|---|
| Civil Works | 20-30 million | 
| Pumping Equipment | 15-25 million | 
| Electrical & Instrumentation | 5-10 million | 
| Miscellaneous & Contingency | 5 million | 
Payment terms are as follows:
- 10% advance upon contract signing.
- 40% after completion of foundation and civil works.
- 30% post installation and testing.
- 20% after successful commissioning and handover.
Bidders must submit a detailed financial proposal aligned with these guidelines, including break-up of costs and payment schedule. All financial bids should be valid for 180 days from the bid submission deadline.
AI-Powered Bidder Prediction
Companies most likely to bid
Unlock Bidder Insights
AI predictions on likely bidders
   
Eligibility Criteria
 - ✓ Must have valid digital signature certificate (Class-III) issued by licensed Certifying Authority of India.
- ✓ Must submit Tender Fee of INR 24,000 and EMD of INR 26,21,500.
- ✓ Proven experience in executing similar water supply and civil infrastructure projects.
- ✓ Financial stability with average annual turnover of at least INR 50 million over the last 3 years.
- ✓ Must possess necessary licenses, technical staff, and equipment for civil and electro-mechanical works.
| Qualification Criteria | Minimum Requirement | 
|---|---|
| Annual Turnover | INR 50 million (last 3 years) | 
| Experience | At least 2 similar projects completed in last 5 years | 
| Technical Capability | Adequate machinery and skilled personnel | 
| Financial Health | Clearance of all statutory dues | 
Bidders must submit all required documents for preliminary and technical stages as specified in the tender notice.
   
Bidding Process
  Process Timeline
19-11-2025 17:00
19-11-2025 17:15
19-11-2025 17:30
Required Forms
Preliminary
Tender Fee Form
Library-Standard
Emd Fee Form
Library-Standard
Technical
FORM - I
User Defined Template-Standard
FORM – 2
User Defined Template-Standard
FORM – 3
User Defined Template-Standard
FORM - 4
User Defined Template-Standard
FORM-5
User Defined Template-Standard
FORM-6
User Defined Template-Standard
FORM-7
User Defined Template-Standard
FORM-8
User Defined Template-Standard
FORM - 9
User Defined Template-Standard
FORM-10
User Defined Template-Standard
FORM – 11
User Defined Template-Standard
FORM - 12
User Defined Template-Standard
FORM - 13
User Defined Template-Standard
FORM - 14
User Defined Template-Standard
FORM - 15
User Defined Template-Standard
FORM – 16
User Defined Template-Standard
Form-20 (Form-3A)
User Defined Template-Standard
Commercial
Percentage Rate
User Defined Template-Secured
Required Documents
Stage - Preliminary Stage
[1] Attach Scan Copy of Tender Fee
Required[2] Attach Scan Copy of EMD
RequiredStage - Technical Stage
ATTACH SCAN COPY OF NECESSARY DOCUMENTS
RequiredFrequently Asked Questions
What is the deadline for bid submission?
The last date for submitting bids is 18th November 2025 at 6:00 PM IST. Bidders must ensure all documents are uploaded before this deadline to avoid disqualification.
What are the eligibility criteria for bidders?
Bidders must have a valid digital signature certificate (Class-III), experience in similar water infrastructure projects, a minimum annual turnover of INR 50 million over the past three years, and submit the required tender fee and EMD. Refer to the detailed eligibility section for comprehensive requirements.
How can I participate in the online bidding process?
Participants need to register on the official e-procurement portal, procure a valid Digital Certificate, attend the free vendor training sessions, and upload all required documents as per the tender guidelines. Technical support is available from (n)Procure support team.
What technical standards must the equipment comply with?
All equipment, including pumps, electrical systems, and instrumentation, must meet BIS standards and project specifications outlined in the tender documents. Proper testing and certification are mandatory before installation.
Is there any site visit or pre-bid meeting scheduled?
The tender notice does not specify a scheduled pre-bid meeting. However, bidders are encouraged to review the technical documents and contact the project authority for clarifications before bid submission.
   
Similar Tenders
 Bid Documents for Design, Construction and O & M of Providing, Supplying, Lowering, Laying and Jointing various DI/PVC Rising Main and Gravity Main Pipelines, WTP, RCC ESR, RCC Sump, Pump House, Compound Wall, Supplying and erecting Pumping Machinery at Various HWs & SHWs to Villages under Augmentation of Bediya-Machhundri Regional Water Supply Scheme with trial run of three months and 10 Years of Comprehensive O & M of entire scope of work including existing & new components for supplying water to all beneficiary villages & Town. Taluka: Una, Gir Gadhada Dist. :- Gir Somnath.[8th Attempt]
GIR SOMNATH, GUJARAT
Bid Documents for Design, Construction and O & M of Providing, Supplying, Lowering, Laying and Jointing various DI/PVC/GI Rising Main and Gravity Main Pipelines, RCC ESR, RCC Sump, WTP, Pump House, Supplying and erecting Pumping Machinery at Various HWs & SHWs to Villages with 10 Years of O & M under Augmentation of Sonariya Regional Water Supply Scheme with including exisiting & new structures with trial run of three months for supplying to all benificer villages & Town. Taluka :- Veraval, Sutrapada, Talala DIST :- Gir Somnath.[9th Attempt]
GIR SOMNATH, GUJARAT
i) Augmentation of existing Sewage Pumping Station, Construction of New Sewage Pumping Station at Adalaj, Rising Main from Adalaj TSPS to proposed 100 mld STP at Jaspur (Item Rate Basis) ii) Construction of TSPS & 100 mld capacity STP at Jaspur including miscellaneous work (EPC Basis) along with Operation and Maintenance of the Scheme for five (5) years for GMC area (2nd Attempt)
GANDHINAGAR, GUJARAT
Download FREE!
Access all tender documents at no cost
    Documents  13  
 01 Volume IA Technical Bid - NC-33-GWIL-17.10.2025.pdf
TENDER_DOCUMENT
02 Volume IB-Part-01 - NC-33-GWIL-17.10.2025.pdf
TENDER_DOCUMENT
02 Volume IB-Part-02 - NC-33-GWIL.pdf
TENDER_DOCUMENT
03 Volume IIA Extent of Work - NC-33-GWIL-17.10.2025.pdf
TENDER_DOCUMENT
04 Volume IIB Tech Spec Civil - NC-33-GWIL-17.10.2025.pdf
TENDER_DOCUMENT
05 Volume IIC Tech Spec M-EI - NC-33-GWIL-17.10.2025.pdf
TENDER_DOCUMENT
06 Volume IID Technical Data Sheets - NC-33-GWIL-17.10.2025.pdf
TENDER_DOCUMENT
07 Volume III Price bid - NC-33-GWIL-17.10.2025.pdf
TENDER_DOCUMENT
08 Volume IV Drawing - NC-33-GWIL-17.10.2025.pdf
TENDER_DOCUMENT
08 Volume IV Drawing - NC-33-GWIL-Part-01.pdf
TENDER_DOCUMENT
08 Volume IV Drawing - NC-33-GWIL-Part-02.pdf
TENDER_DOCUMENT
09 Volume V OM - NC-33-GWIL-17.10.2025.pdf
TENDER_DOCUMENT
GR of Finance Dept-GOG-01-05-2025.pdf
TENDER_DOCUMENT
01 Volume IA Technical Bid - NC-33-GWIL-17.10.2025.pdf
TENDER_DOCUMENT
02 Volume IB-Part-01 - NC-33-GWIL-17.10.2025.pdf
TENDER_DOCUMENT
02 Volume IB-Part-02 - NC-33-GWIL.pdf
TENDER_DOCUMENT
03 Volume IIA Extent of Work - NC-33-GWIL-17.10.2025.pdf
TENDER_DOCUMENT
04 Volume IIB Tech Spec Civil - NC-33-GWIL-17.10.2025.pdf
TENDER_DOCUMENT
05 Volume IIC Tech Spec M-EI - NC-33-GWIL-17.10.2025.pdf
TENDER_DOCUMENT
06 Volume IID Technical Data Sheets - NC-33-GWIL-17.10.2025.pdf
TENDER_DOCUMENT
07 Volume III Price bid - NC-33-GWIL-17.10.2025.pdf
TENDER_DOCUMENT
08 Volume IV Drawing - NC-33-GWIL-17.10.2025.pdf
TENDER_DOCUMENT
08 Volume IV Drawing - NC-33-GWIL-Part-01.pdf
TENDER_DOCUMENT
08 Volume IV Drawing - NC-33-GWIL-Part-02.pdf
TENDER_DOCUMENT
09 Volume V OM - NC-33-GWIL-17.10.2025.pdf
TENDER_DOCUMENT
GR of Finance Dept-GOG-01-05-2025.pdf
TENDER_DOCUMENT
