Indian Army Regulator and Engine Components Tender 2025 Regulator, Air Pressure Pipe Assy, Controller Assy - India
Indian Army
Menu
Progress
Quantity
38
Category
Lub all Pressure sensor
Bid Type
Two Packet Bid
Organization: Indian Army, Department Of Military Affairs. Location: Kamrup, Assam, 781001. Procurement scope: broad list of mechanical and electrical components including pressure sensors, cable assemblies, automatic voltage regulators, rectifier brackets, capacitors, fuses, filters, switches, oil/air cleaners, wheel nuts/studs, tail light assemblies, and related spare parts. Quantity/Value: 20 BOQ items; exact quantities not disclosed. Delivery context: option to increase quantity up to 25% at contracted rates, with delivery period adjustments; advance sample approval required prior to bulk manufacturing. The tender highlights a comprehensive sample approvals process and potential delivery extensions based on the option clause. Unique aspects include a Buyer's right to modify order quantities and to extend delivery time proportional to quantity changes, with a minimum 30-day base window. The tender targets suppliers capable of meeting military-grade component standards and rigorous trial/sample procedures. This procurement emphasizes supply continuity under fluctuating demand and strict conformity to sample-based approvals.
BOQ comprises 20 items; exact quantities and item names are not disclosed (N/A).
Advance sample submission: 3 samples within 5 days of award; buyer approval or modification within 5 days.
Bulk supply to conform to approved samples; if deviations, buyer may demand fresh samples or terminate contract.
Pre-dispatch inspection clause may apply for reference samples, particularly for clothing-related items.
Option clause permits up to 25% quantity variation during contract; delivery period adjusted proportionally with a minimum of 30 days.
Option Clause allows 25% quantity increase/decrease at contracted rates.
Advance samples required: 3 units within 5 days of award; modifications may be issued in 5 days.
Delivery period adjustments depend on quantity changes; minimum 30 days for extended time.
Payment terms not explicitly stated in data; bidders must assume standard government terms unless clarified.
Delivery starts after original delivery order; extended delivery time applies when option clause is invoked; minimum 30 days.
Not specified in data; contract may include LD as per buyer terms; ensure clarity during bid submission.
Experience in supplying mechanical/electrical automotive components to government entities
GST registration and financial stability demonstrated by financial statements
Authorized OEM or dealership credentials for the listed components
Indian Army
Indian Army
Indian Army
DARJEELING, WEST BENGAL
Indian Army
DIMAPUR, NAGALAND
Armed Forces Tribunal
LOHIT, ARUNACHAL PRADESH
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Lub all Pressure sensor | ND-IXD-KR-2H-092-01-0-00 | 1 | nos | sur@17czw | 30 |
| 2 | Cable Assy Stop | ND-IXC-KR-22-061-03 | 1 | nos | sur@17czw | 30 |
| 3 | Automatic Voltage Regulator | 6110-72-0479546 | 1 | nos | sur@17czw | 30 |
| 4 | Rectifier Bracket | XP-0616 | 1 | nos | sur@17czw | 30 |
| 5 | Capacitor | MISC-PROTOR-4BBY-A9620-L-3 | 1 | nos | sur@17czw | 30 |
| 6 | Fuse | MISC-0-5PM3 | 2 | nos | sur@17czw | 30 |
| 7 | Oil Pressure Pipe | ND-IXC-KR-13-002-10-0-00 | 1 | nos | sur@17czw | 30 |
| 8 | Switch Push | ND-MISC-1200530159 | 1 | nos | sur@17czw | 30 |
| 9 | Regulator S | ND-6115-001203 | 1 | nos | sur@17czw | 30 |
| 10 | High Pressure Line 19 X 19 | ND-IXC-KR-13-002-10-0-00 | 6 | nos | sur@17czw | 30 |
| 11 | Element Fuel Filter | ND-IXC-KR-620729G | 2 | nos | sur@17czw | 30 |
| 12 | Oil Filter Element | IXC-RH-2YWA-605411880009 | 1 | nos | sur@17czw | 30 |
| 13 | Wheel Nut | ND-IXC-MI-2615-051-106 | 4 | nos | sur@17czw | 30 |
| 14 | Over Flow Pipe | IXC-RH-2YWA-463-004 | 1 | nos | sur@17czw | 30 |
| 15 | Tail Light Assy Rear | 5997-914613 | 2 | nos | sur@17czw | 30 |
| 16 | Starting Switch Push | P18-ZHG4-255-006SP | 1 | nos | sur@17czw | 30 |
| 17 | Stoper Cable | IXC-GLL-SK-2102 | 1 | nos | sur@17czw | 30 |
| 18 | Fuse | G5-15-N10-481-017-FUSE | 6 | nos | sur@17czw | 30 |
| 19 | Oil Bath Air Cleaner Type | IXC-DZ-MIL-7 | 1 | nos | sur@17czw | 30 |
| 20 | Wheel Stud | 5307-005898 | 3 | nos | sur@17czw | 30 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar procurement
Financial statements (audited if available)
EMD/Security deposit proof
Technical bid documents
OEM authorizations or dealership certifications
Extended Deadline
16-Dec-2025, 2:00 pm
Opening Date
16-Dec-2025, 2:30 pm
Extended Deadline
09-Dec-2025, 2:00 pm
Opening Date
09-Dec-2025, 2:30 pm
Extended Deadline
02-Dec-2025, 2:00 pm
Opening Date
02-Dec-2025, 2:30 pm
Key insights about ASSAM tender market
Bidders must submit GST and PAN, experience certificates, financial statements, EMD proof, and technical bid documentation. Prepare OEM authorizations and sample handling plans. Ensure compliance with the option clause allowing up to 25% quantity changes and understand the advance sample approval timeline of 5 days.
Required documents include GST certificate, PAN card, experience certificates for similar supplies, audited financial statements, EMD proof, technical bid documents, and OEM authorization. Ensure validity and alignment with the buyer’s terms, including sample approvals and delivery terms.
Delivery begins after the last date of the original delivery order; if the option clause is exercised, add time proportionally with a minimum 30 days. Ensure readiness to extend delivery timelines and track sample approval deadlines to avoid LD risk.
Submit 3 advance samples within 5 days of award; buyer will approve or specify modifications within 5 days. Bulk supply must match approved sample; delays in approval extend delivery without LD, and non-conformance may trigger contract termination.
Demonstrate prior experience in supplying similar hardware, maintain GST registration, provide financial stability documentation, possess OEM authorizations, and comply with potential quality/inspection requirements and the 25% quantity variation clause.
Budget and plan for possible 25% quantity changes at contracted rates; ensure supply chain flexibility, maintain stock of critical components, and align delivery plans with the calculation method: Increased quantity / Original quantity × Original delivery period, with minimum 30 days extra.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Choose from flexible plans to access tender documents instantly
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS