GEM

Procurement Opportunity: Supply of 75 KW / 100HP, 3-Phase squirrel cage induction motors as per detailed specification,Suppl in KORAPUT, ODISHA

Bid Publish Date

15-Dec-2025, 1:42 pm

Bid End Date

07-Jan-2026, 9:00 pm

EMD

₹887

Progress

Issue15-Dec-2025, 1:42 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

6

Category

Supply of 75 KW / 100HP, 3-Phase squirrel cage induction motors as per detailed specification

Bid Type

Two Packet Bid

Categories 1

Hindustan Aeronautics Limited (hal) invites bids for Supply of 75 KW / 100HP, 3-Phase squirrel cage induction motors as per detailed specification, Supply of 90 KW / 120HP, 3-Phase squirrel cage induction motors as per detailed specification, Supply of 9. 3 KW / 12. 5 HP, 3-Phase squirrel cage induction motors as per detailed specification in KORAPUT, ODISHA. Quantity: 6. Submission Deadline: 07-01-2026 21: 00: 00. Submit your proposal before the deadline.

Past Similar Tenders (Historical Results)

5 found

DE AND END SHIELD FOR 55 KW 3 Phase Squirrel Cage Induction Motor

Uranium Corporation Of India Limited

CUDDAPAH, ANDHRA PRADESH

Posted: 23 April 2025
Closed: 14 May 2025
GEM

Squirrel Cage Induction Motor

Bharat Earth Movers Limited (beml)

BANGALORE, KARNATAKA

Posted: 28 July 2025
Closed: 7 August 2025
GEM

Squirrel Cage Induction Motor

Bharat Heavy Electricals Limited (bhel)

HARIDWAR, UTTARAKHAND

Posted: 11 March 2025
Closed: 21 March 2025
GEM

Squirrel Cage Induction Motor

National Institute Of Ocean Technology (niot)

KANCHIPURAM, TAMIL NADU

Posted: 4 March 2025
Closed: 1 April 2025
GEM

3 PHASE SQUIRREL CAGE INDUCTION MOTOR WITH BRAKE-415V, 50HZ, 3.7KW, 1500RPM(SYNCHRONOUS) , DUTY-S1,

Advanced Weapons And Equipment India Limited

KANPUR NAGAR, UTTAR PRADESH

Posted: 25 July 2025
Closed: 16 August 2025
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Certificate (Requested in ATC)

2

OEM Authorization Certificate

3

Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

4

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer