VTL DOOR GUIDE BLOCK
Durgapur Steel Plant
Bid Publish Date
20-Nov-2025, 4:50 pm
Bid End Date
01-Dec-2025, 5:00 pm
Bid Opening Date
01-Dec-2025, 5:30 pm
Location
Progress
Quantity
1
Bid Type
Single Packet Bid
The procurement is issued by IISCO Steel Plant, part of the Steel Authority of India Limited for Guide Rails at Drive End. The location is Bardhaman, West Bengal 713101. The process includes vendor-code creation documentation (PAN, GSTIN, cancelled cheque, EFT mandate) and Manufacturer Authorization where applicable. Invoices must be raised in the consignee’s name with the consignee GSTIN, and GST invoices along with GST portal payment proof must be uploaded on the GeM portal. The tender mandates one-to-one replacement of installed materials at SP1 and SP2 sinter machines, ensuring complete supply readiness for one set per location. The inspection is conducted at ISP Stores by the Inspection Cell, with warranty/guarantee and MTC/fitment certificates required. Key differentiators include strict conformity to ATC clauses and mandatory certificates to avoid rejection. The opportunity emphasizes compliance with GST formats, documentation rigor, and on-site verification.
Product/service: Guide Rails at Drive End for Sinter Machine SP1 & SP2
Quantity/Scope: One complete set per machine (one-to-one replacement)
Standards/Compliance: ATC and GEM/GTC terms; OEM authorization when applicable
Documentation: Warranty/Guarantee Certificate, MTC, Fitment Guarantee Certificate
Inspection: Conducted at ISP Stores by ISP Inspection Cell
GST and PAN documentation required with GSTIN for invoicing
OEM authorization must accompany bids where distributors quote
One-to-one replacement and complete set delivery with on-site inspection
GST will be reimbursed as actuals or at applicable rates (whichever is lower), subject to quoted GST percentage; invoice to be raised in consignee name with consignee GSTIN; GST payment proof required
Not explicitly specified; replacement must be one-to-one and complete for SP1 & SP2, with on-site inspection and conformity checks
Not detailed in available terms; adherence to ATC and GTC is mandatory; non-compliance may lead to rejection
Must provide PAN and GSTIN; GST compliance verified
OEM authorization for distributors; Manufacturer Authorization required
Ability to deliver one complete guide-rail set per sinter machine and replacement on-site
Durgapur Steel Plant
Hmt Machine Tools Limited
India Optel Limited
Armoured Vehicles Nigam Limited
N/a
KULLU, HIMACHAL PRADESH
Tender Results
Loading results...
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN copy
Cancelled cheque copy
EFT Mandate copy certified by bank
Manufacturer Authorization/OEM authorisation (if applicable)
GST invoice copy and GST portal payment screenshot
Warranty/Guarantee Certificate as per ATC, GEM Tender and GTC
Material Test Certificate (MTC)
Fitment Guarantee Certificate
Conformity documents stating supplier compliance with specifications
Key insights about WEST BENGAL tender market
Bidders must submit PAN, GSTIN, cancelled cheque, and EFT Mandate; provide OEM authorization if required; ensure invoice is raised in consignee name with GSTIN; upload GST invoice and payment proof on GeM; supply must be one-to-one replacement for SP1 and SP2 and pass ISP inspection.
Submit PAN, GSTIN, cancelled cheque, and EFT Mandate certified by bank; ensure OEM authorization if using authorized distributors; provide GST invoice format and bank details for EFT payments; delivery proof and conformity certificates may be demanded during inspection.
Inspection is conducted at ISP Stores by the Inspection Cell; conformity to supply per ATC/GEM/GTC; include Warranty/Guarantee Certificate, Material Test Certificate (MTC), and Fitment Guarantee Certificate with supply for verification.
GST will be reimbursed based on actuals or applicable rates, whichever is lower; payment terms align with invoice submission on GeM; ensure GSTIN belongs to consignee and provide GST portal payment screenshot as proof.
If bidding via an authorized distributor, a Manufacturer Authorization/Certificate must be attached detailing OEM name, designation, address, email, and phone; ensures supply legitimacy and warranty support for the rails.
Provide Warranty/Guarantee Certificate per ATC, along with Material Test Certificate (MTC) and Fitment Guarantee Certificate; these documents accompany the supply and are checked during ISP inspection.
GST invoices must be uploaded with a GST portal payment screenshot; the consignee GSTIN is mandatory on the invoice; reimbursement is based on actual GST or applicable rate, up to quoted GST percentage.
Access all tender documents at no cost
Main Document
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Main Document
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS