Nylon Rope as per IS 4572
East Central Railway
SAMASTIPUR, BIHAR
Bid Publish Date
09-Nov-2025, 11:31 pm
Bid End Date
01-Dec-2025, 9:00 am
Bid Opening Date
01-Dec-2025, 9:30 am
Location
Progress
Quantity
300
Bid Type
Two Packet Bid
The Indian Army (Department Of Military Affairs) invites bids for Nylon Rope conforming to IS 4572 (Q3). Bidders should anticipate a flexible quantity mechanism allowing up to 25% variation at contract award and during the currency, subject to contracted rates. The engagement requires submission of a Data Sheet, approval of detailed drawings within 7 days of award, and potential delivery extensions if the buyer delays drawing approvals. The contract includes OEM/ OEM-certified installation by authorized resources and an End User Certificate process in the buyer’s template. This procurement prioritizes compliance with established rope standards and traceable documentation.
Product: Nylon Rope
Standard: IS 4572 (Q3)
Data Sheet alignment with offered product parameters
Drawings: Detailed Design Drawings to be approved within 7 days of award
Installation: OEM / OEM-certified resource or OEM-authorized reseller
Documentation: PAN, GSTIN, cancelled cheque, EFT mandate
Delivery: 25% quantity variation allowed; delivery period adjusted if drawings delay
Quantity variation up to 25% at award and during contract at contracted rates
Mandatory Data Sheet submission and alignment with product; drawing approvals within 7 days
OEM installation by authorized personnel; EUC provided if requested
Purchaser may increase/decrease quantity up to 25% at contract award and during currency; delivery period adjusted accordingly with a minimum 30 days
Successful bidder must submit Detailed Design Drawings within 7 days; buyer approval or modification list issued within 7 days; delayed approvals extend delivery period without LD
Installation, commissioning and training to be carried out by OEM or OEM-certified resource or authorized reseller
Not under liquidation, court receivership, or bankruptcy
Must provide PAN, GSTIN, cancelled cheque, EFT mandate
Must demonstrate OEM authorization or OEM-certified installation capability
East Central Railway
SAMASTIPUR, BIHAR
Indian Air Force
JAISALMER, RAJASTHAN
Indian Air Force
Indian Army
DARJEELING, WEST BENGAL
Indian Army
MEERUT, UTTAR PRADESH
Tender Results
Loading results...
Discover companies most likely to bid on this tender
Copy of PAN Card
Copy of GSTIN
Copy of Cancelled Cheque
Copy of EFT Mandate (bank certified)
Data Sheet of offered product
End User Certificate (in buyer format, if requested)
OEM authorization / OEM-certified installation capability documentation
Non-Disclosure Declaration (on bidder letterhead)
Bidder undertaking: not under liquidation, court receivership, or bankruptcy
Key insights about MADHYA PRADESH tender market
Bidders must submit the Data Sheet with product parameters, PAN, GSTIN, cancelled cheque, and EFT mandate. Ensure compliance with IS 4572 (Q3) and provide OEM authorization for installation. Submission includes End User Certificate if required and a formal undertaking of non-bankruptcy status.
Required documents include PAN, GSTIN, cancelled cheque, EFT mandate, product Data Sheet, OEM authorization, End User Certificate, and NDA. Ensure data sheet alignment with offered rope specifications and include installation capability details.
The rope must comply with IS 4572, category Q3. Bidders should provide Data Sheet mapping to IS 4572 specifications, confirm fiber composition, breaking strength, diameter, and elongation relevant to IS 4572 Q3 requirements.
Delivery time follows the original delivery period; if the buyer exercises the option to vary quantity by up to 25%, the additional time is calculated as (increased quantity/original quantity) × original delivery period, with a minimum of 30 days.
Installation must be performed by OEM or OEM-certified resource or OEM-authorized reseller. Provide installation capability documentation and ensure supply aligns with approved drawings to avoid delivery delays.
If Buyer delays, the delivery period is reset without liquidated damages for the period of the delay; bidders must track approval timelines and adjust project schedules accordingly.
An End User Certificate may be required in Buyer’s standard format. Bidders should prepare and include EUC documentation or confirm applicability during bid submission.
Submit Data Sheet with exact product parameters; Buyer will verify against technical parameters and may reject bids with unexplained mismatches. Ensure all parameters (strength, diameter, length, finish) match IS 4572 Q3 specifications.
Access all tender documents at no cost
Main Document
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Main Document
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS