GEM

Contract Bidding Open For Supply of Double arm pendant Double Arm moveable pendant having the oprational Movement of only hor in SOUTH DELHI, DELHI

Bid Publish Date

13-Nov-2025, 9:41 am

Bid End Date

04-Dec-2025, 10:00 am

Bid Opening Date

04-Dec-2025, 10:30 am

Progress

Issue13-Nov-2025, 9:41 am
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

74

Category

Supply of Double arm pendant Double Arm moveable pendant having the oprational Movement of only hori

Bid Type

Two Packet Bid

Categories 7

Indian Army invites bids for Supply of Double arm pendant Double Arm moveable pendant having the oprational Movement of only hori, Medical Grade EN13348 Copper Pipe 15mm x 0. 9mm thickness, Isolation Ball Valve 15mm with Brass Fitting in SOUTH DELHI, DELHI. Quantity: 74. Submission Deadline: 04-12-2025 10: 00: 00. Submit your proposal before the deadline.

Past Similar Tenders (Historical Results)

5 found

Pneumatic Pipelines alongwith other fitment accessories like Elbow MTA T Joints and Socket,Mail Thr

Indian Army

Posted: 9 December 2024
Closed: 30 December 2024
GEM

Airotor Hand Piece with Pipe,Scaler PCB,Scaler Hand Piece With Cord,LED Light Cure Gun,Trolley Pres

Indian Army

KOTA, RAJASTHAN

Posted: 11 January 2025
Closed: 1 February 2025
GEM

DISTRIBUTOR HEAD,PRESSURE CONTROL VALVE,Governor Shaft,SHIFTING SLEEVE,Injector Assy

Indian Army

AMBALA, HARYANA

Posted: 12 April 2025
Closed: 5 May 2025
GEM

Male Female Tee twenty five mm,PPR Pipe twenty five mm copper,Elbow twenty five mm,Male Female Elbo

Controller General Of Defence Accounts

Posted: 7 December 2024
Closed: 28 December 2024
GEM

Patient plate with cable solicon,Bull nose fitting,Weight machine bty 6v,Ball chest electrode,Air v

Indian Army

IMPHAL WEST, MANIPUR

Posted: 9 October 2025
Closed: 20 October 2025
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

8

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer