GEM

Directorate Of Purchase And Stores Department Of Atomic Energy Pressure Monitoring Line Accessories Tender 2025

Bid Publish Date

28-Nov-2025, 10:23 am

Bid End Date

08-Dec-2025, 2:00 pm

Location

MUMBAI , MAHARASHTRA

Progress

Issue28-Nov-2025, 10:23 am
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

5000

Bid Type

Two Packet Bid

Key Highlights

  • Brand/OEM requirements: None specified
  • Technical standards: Not specified in tender text
  • Special clauses: Advance sample approval; four-installment delivery; latest manufacturing date required
  • Eligibility: Goods-only supply; non-GPS vehicle dispatch; compliance with ATC DPS/CPU/04/A2/5133
  • Warranty/AMC: Not specified
  • Penalties: Potential rejection for major deviations; contract termination possible
  • Delivery: 04 equal installments within 18 months; first within 30 days
  • Delivery windows: 1100-1245 and 1400-1700 hours, Mon-Fri

Categories 1

Tender Overview

The Directorate Of Purchase And Stores of the Department Of Atomic Energy invites bids for the intracompartmental pressure monitoring set accessories (Pressure Monitoring Line) under a goods-only procurement. The contract contemplates delivery in 04 equal installments within a maximum of 18 months, with the first installment due within 30 days of the Purchase Order and subsequent installments on a pro-rata basis. Each shipment must reflect the latest manufacturing date, and consignments must be dispatched via non-GPS vehicles. A reference number (DPS/CPU/04/A2/5133) appears in the ATC for document alignment. No estimated value or EMD amount is disclosed. Importantly, the bidder must incorporate an advance sample approval process: submit 5 samples within 15 days of award; approvals or modifications follow within 15 days; bulk supply aligned to approved sample. Submission should demonstrate compliance with the buyer’s framework; penalties or contract termination may apply for major deviations. The scope explicitly covers “Only supply of Goods.”

Technical Specifications & Requirements

  • Product/service: Intracompartmental pressure monitoring line accessories (Pressure Monitoring Line) – no specific technical specs provided in the tender text.
  • Delivery: 04 installments; 1st installment within 30 days, then three equal installments within 18 months; each delivery on a pro-rata basis; latest manufacturing date required for every supply.
  • Sample process: Advance sample submission of 5 samples; 15-day review window; modifications as directed; bulk supply post-approval; if delayed by buyer, delivery period may be refixed without LD.
  • Delivery constraints: Dispatched through non-GPS vehicles; buyer to reject GPS-enabled consignments; GEM contract reference must appear on all documents.
  • Documentation note: GST not applicable; acknowledgement of 1100-1245 and 1400-1700 hours delivery windows on working days.

Terms, Conditions & Eligibility

  • Scope: Goods-only supply; no manufacture or service scope.
  • Sample & approval: 5 advance samples required within 15 days; bulk supply contingent on sample approval.
  • Delivery schedule: 4 equal installments over 18 months; first within 30 days from PO; pro-rata payments.
  • Delivery times: 1100-1245 Hrs and 1400-1700 Hrs (Mon-Fri; excluding holidays).
  • Logistics: Non-GPS vehicles only; GEM contract number to appear on all documents; materials must show latest manufacturing date; GST not applicable.
  • Documentation: Follow ATC DPS/CPU/04/A2/5133 reference on all submission documents; bidder terms must align with bid terms to avoid rejection.

Key Specifications

  • Product/service names: intracompartmental pressure monitoring line accessories

  • Quantity/scale: 04 installments over 18 months (not quantified into a total value)

  • EMD/estimated value: Not disclosed

  • Experience: Prior supply of similar medical/pressure monitoring line accessories preferred

  • Quality/standards: Not specified in tender; adherence to latest manufacturing date required

  • Delivery/installation: Pro-rata installments; delivery windows fixed; non-GPS vehicle dispatch

  • Warranty/AMC: Not specified

Terms & Conditions

  • Advance sample clause requiring 5 samples within 15 days of award

  • 04 equal installments over 18 months with first delivery in 30 days

  • Non-GPS vehicle delivery and documentation alignment with DPS/CPU/04/A2/5133

Important Clauses

Payment Terms

Pro-rata payments for each of 04 deliveries; no LD mentioned for buyer delays in sample approval

Delivery Schedule

Deliver in 04 equal installments within 18 months; first installment within 30 days of PO; latest manufacturing date per shipment

Penalties/Liquidated Damages

Depicts potential contract termination for major sample deviations or non-conformance; approval delays may adjust delivery timelines

Bidder Eligibility

  • Goods-only supply capability for pressure monitoring line accessories

  • Ability to supply with advance sample approval process

  • Compliance with non-GPS vehicle dispatch and document alignment with DPS/CPU/04/A2/5133

Past Similar Tenders (Historical Results)

5 found

intracompartmental pressure monitoring set accessories (Pressure Monitoring Line)

Indian Army

Posted: 29 May 2025
Closed: 9 June 2025
GEM

intracompartmental pressure monitoring set accessories (Pressure Monitoring Line)

South East Central Railway

Posted: 28 November 2024
Closed: 9 December 2024
GEM

intracompartmental pressure monitoring set accessories (Pressure Monitoring Line)

Central Health Service Ministry Of Health And Family Welfare

NEW DELHI, DELHI

Posted: 17 January 2025
Closed: 3 February 2025
GEM

intracompartmental pressure monitoring set accessories (Pressure Monitoring Line)

All India Institute Of Medical Sciences (aiims)

WEST DELHI, DELHI

Posted: 11 July 2025
Closed: 1 August 2025
GEM

PRESSURE MEASUREMENT SYSTEM WITH ACCESSORIES

Office Of Dg (ace)

CHENNAI, TAMIL NADU

Posted: 18 February 2025
Closed: 20 March 2025
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar goods supply

4

Financial statements demonstrating stability

5

EMD/Security deposit documentation (if applicable)

6

Technical bid documents showing compliance with sample process

7

OEM authorizations (if applicable)

8

Documents referencing the contract variation and delivery terms (DPS/CPU/04/A2/5133)

Frequently Asked Questions

What documents are required for the pressure monitoring line tender in Delhi 2025?

Bidders must submit GST registration, PAN card, experience certificates for similar goods, financial statements, EMD documents, technical bid showing advance sample readiness, and OEM authorizations if applicable. Include references to DPS/CPU/04/A2/5133 on all documents for alignment and eligibility.

How to bid for intracompartmental pressure monitoring accessories tender 2025?

Prepare goods-only bid with 04 equal installments over 18 months, first delivery within 30 days, and ensure latest manufacturing date on each shipment. Include 5 advance samples within 15 days of award and address GPS vehicle restrictions in logistics plan.

What are the delivery terms for the pressure monitoring line supply contract?

Deliver in 04 equal installments across 18 months; first within 30 days from PO. Pro-rata payments will be processed after each shipment; consignments must use non-GPS vehicles and follow designated delivery windows on weekdays.

What standards or certifications are required for this procurement?

The tender text does not specify particular standards; bidders should demonstrate compliance with the latest manufacturing date requirement and supply-chain readiness. Ensure documentation references the contract clause DPS/CPU/04/A2/5133.

What is the EMD or security deposit requirement for this bid in 2025?

The tender text does not disclose an EMD amount. Bidders should await further communication or check the official portal for the exact EMD value, payment mode, and validity aligned with the ATC terms.

How to ensure samples meet buyer approval for bulk supply?

Submit 5 samples within 15 days of award; buyer reviews within 15 days and lists required modifications. If modified, supply must conform to the approved sample; major deviations may trigger contract termination.

When can consignments be dispatched according to the tender terms?

Disaptch allowed within the 04-equal-installment schedule; deliveries must be 1100-1245 Hrs or 1400-1700 Hrs, Monday to Friday, excluding holidays, with non-GPS vehicle transport.

What is the contract reference to include on documents for this tender?

Include the contract reference DPS/CPU/04/A2/5133 on all documents as required by the buyer-added terms; ensure it appears on bids, delivery notes, and packaging to avoid rejection.

Explore More Opportunities

Quick Access