intracompartmental pressure monitoring set accessories (Pressure Monitoring Line)
Indian Army
Bid Publish Date
28-Nov-2025, 10:23 am
Bid End Date
08-Dec-2025, 2:00 pm
Location
Progress
Quantity
5000
Bid Type
Two Packet Bid
The Directorate Of Purchase And Stores of the Department Of Atomic Energy invites bids for the intracompartmental pressure monitoring set accessories (Pressure Monitoring Line) under a goods-only procurement. The contract contemplates delivery in 04 equal installments within a maximum of 18 months, with the first installment due within 30 days of the Purchase Order and subsequent installments on a pro-rata basis. Each shipment must reflect the latest manufacturing date, and consignments must be dispatched via non-GPS vehicles. A reference number (DPS/CPU/04/A2/5133) appears in the ATC for document alignment. No estimated value or EMD amount is disclosed. Importantly, the bidder must incorporate an advance sample approval process: submit 5 samples within 15 days of award; approvals or modifications follow within 15 days; bulk supply aligned to approved sample. Submission should demonstrate compliance with the buyer’s framework; penalties or contract termination may apply for major deviations. The scope explicitly covers “Only supply of Goods.”
Product/service names: intracompartmental pressure monitoring line accessories
Quantity/scale: 04 installments over 18 months (not quantified into a total value)
EMD/estimated value: Not disclosed
Experience: Prior supply of similar medical/pressure monitoring line accessories preferred
Quality/standards: Not specified in tender; adherence to latest manufacturing date required
Delivery/installation: Pro-rata installments; delivery windows fixed; non-GPS vehicle dispatch
Warranty/AMC: Not specified
Advance sample clause requiring 5 samples within 15 days of award
04 equal installments over 18 months with first delivery in 30 days
Non-GPS vehicle delivery and documentation alignment with DPS/CPU/04/A2/5133
Pro-rata payments for each of 04 deliveries; no LD mentioned for buyer delays in sample approval
Deliver in 04 equal installments within 18 months; first installment within 30 days of PO; latest manufacturing date per shipment
Depicts potential contract termination for major sample deviations or non-conformance; approval delays may adjust delivery timelines
Goods-only supply capability for pressure monitoring line accessories
Ability to supply with advance sample approval process
Compliance with non-GPS vehicle dispatch and document alignment with DPS/CPU/04/A2/5133
Indian Army
South East Central Railway
Central Health Service Ministry Of Health And Family Welfare
NEW DELHI, DELHI
All India Institute Of Medical Sciences (aiims)
WEST DELHI, DELHI
Office Of Dg (ace)
CHENNAI, TAMIL NADU
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar goods supply
Financial statements demonstrating stability
EMD/Security deposit documentation (if applicable)
Technical bid documents showing compliance with sample process
OEM authorizations (if applicable)
Documents referencing the contract variation and delivery terms (DPS/CPU/04/A2/5133)
Bidders must submit GST registration, PAN card, experience certificates for similar goods, financial statements, EMD documents, technical bid showing advance sample readiness, and OEM authorizations if applicable. Include references to DPS/CPU/04/A2/5133 on all documents for alignment and eligibility.
Prepare goods-only bid with 04 equal installments over 18 months, first delivery within 30 days, and ensure latest manufacturing date on each shipment. Include 5 advance samples within 15 days of award and address GPS vehicle restrictions in logistics plan.
Deliver in 04 equal installments across 18 months; first within 30 days from PO. Pro-rata payments will be processed after each shipment; consignments must use non-GPS vehicles and follow designated delivery windows on weekdays.
The tender text does not specify particular standards; bidders should demonstrate compliance with the latest manufacturing date requirement and supply-chain readiness. Ensure documentation references the contract clause DPS/CPU/04/A2/5133.
The tender text does not disclose an EMD amount. Bidders should await further communication or check the official portal for the exact EMD value, payment mode, and validity aligned with the ATC terms.
Submit 5 samples within 15 days of award; buyer reviews within 15 days and lists required modifications. If modified, supply must conform to the approved sample; major deviations may trigger contract termination.
Disaptch allowed within the 04-equal-installment schedule; deliveries must be 1100-1245 Hrs or 1400-1700 Hrs, Monday to Friday, excluding holidays, with non-GPS vehicle transport.
Include the contract reference DPS/CPU/04/A2/5133 on all documents as required by the buyer-added terms; ensure it appears on bids, delivery notes, and packaging to avoid rejection.
Access all tender documents at no cost
Main Document
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Main Document
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS