GEM

Bids are Invited For Pipe Clamp 02 inch,Pipe Clamp 01 Inch,Pipe clamp one and half inch,Pipe Clamp half inch,Copper Wash

Bid Publish Date

10-Dec-2025, 5:26 pm

Bid End Date

22-Dec-2025, 6:00 pm

Progress

Issue10-Dec-2025, 5:26 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

252

Category

Self Starter Assy 24V

Bid Type

Two Packet Bid

Categories 19

A tender has been published for Indian Army Pipe Clamp 02 inch, Pipe Clamp 01 Inch, Pipe clamp one and half inch, Pipe Clamp half inch, Copper Washer 17mm, Copper Washer 19mm, Copper washer 13mm, Binzo Bolt 19mm, Binzo Bolt 17mm, Binzo Bolt 14mm, Glow Plug, Thread Tape, Compressor Belt, Fan Belt, Alternator Belt, Fuel Return Pipe, Fuel Pipe, O Ring set, Solenoid Switch Self 24V, Over Flow Pipe, Rotary Fuel Pump pipe 13mm, Self Starter Assy 24V, Fuel Cut off Switch, Oil pipe compressor to Sump, Oil pipe Compressor to Filter. Quantity: 252 by. Submission Deadline: 22-12-2025 18: 00: 00. Check eligibility and apply.

Past Similar Tenders (Historical Results)

5 found

TAPPED GASKIT,FUEL PIPE 42,FUEL PIPE 60,ENG MTG PAD,HAND BRAKE VALVE REP KIT,RAM ASSY,HOSE CLAMP,HU

Indian Army

MATHURA, UTTAR PRADESH

Posted: 12 August 2025
Closed: 29 August 2025
GEM

Oil filter,Fuel filter,Fuel filter,Engine Oil 15W 40,Fuel pipe line 19 X 19 size,Fan Belt,Battery 1

Indian Army

ALLAHABAD, UTTAR PRADESH

Posted: 15 December 2024
Closed: 6 January 2025
GEM

Fuel Pipe 19mm,Fan Belt,Air Filter Hose,Ampere Meter,Volt Meter,Bty 12V 180AH,Fuel Filter,Oil Filte

Indian Army

GURDASPUR, PUNJAB

Posted: 11 July 2025
Closed: 23 July 2025
GEM

Armature Outer BRG,AVR Plate,Cylinder Bone,Cylinder Assy with inlet and exhaust Valve,Push Rod,Push

Indian Army

LEH, JAMMU & KASHMIR

Posted: 8 May 2025
Closed: 29 May 2025
GEM

RADIATOR HOSE,HYDRAULIC PIPE 24MM,HYDRAULIC PIPE 32MM,STARTING RELAY CUTOFF,HYDRAULIC JACK SEAL,FRO

Indian Army

DIMAPUR, NAGALAND

Posted: 24 August 2025
Closed: 3 September 2025
GEM

Bill of Quantities (BOQ) 25 Items

Item # Title Description Quantity Unit Consignee Delivery (Days)
1 Pipe Clamp 02 inch Pipe Clamp 02 inch 20 nos yogeshkumar.911h 15
2 Pipe Clamp 01 Inch Pipe Clamp 01 Inch 20 nos yogeshkumar.911h 15
3 Pipe clamp one and half inch Pipe clamp one and half inch 20 nos yogeshkumar.911h 15
4 Pipe Clamp half inch Pipe Clamp half inch 20 nos yogeshkumar.911h 15
5 Copper Washer 17mm Copper Washer 17mm 2 nos yogeshkumar.911h 15
6 Copper Washer 19mm Copper Washer 19mm 2 nos yogeshkumar.911h 15
7 Copper washer 13mm Copper washer 13mm 2 nos yogeshkumar.911h 15
8 Binzo Bolt 19mm Binzo Bolt 19mm 10 nos yogeshkumar.911h 15
9 Binzo Bolt 17mm Binzo Bolt 17mm 10 nos yogeshkumar.911h 15
10 Binzo Bolt 14mm Binzo Bolt 14mm 10 nos yogeshkumar.911h 15
11 Glow Plug Glow Plug 36 nos yogeshkumar.911h 15
12 Thread Tape Thread Tape 10 nos yogeshkumar.911h 15
13 Compressor Belt Compressor Belt 10 nos yogeshkumar.911h 15
14 Fan Belt Fan Belt 10 nos yogeshkumar.911h 15
15 Alternator Belt Alternator Belt 10 nos yogeshkumar.911h 15
16 Fuel Return Pipe Fuel Return Pipe 5 nos yogeshkumar.911h 15
17 Fuel Pipe Fuel Pipe 10 nos yogeshkumar.911h 15
18 O Ring set O Ring set 1 nos yogeshkumar.911h 15
19 Solenoid Switch Self 24V Solenoid Switch Self 24V 3 nos yogeshkumar.911h 15
20 Over Flow Pipe Over Flow Pipe 8 nos yogeshkumar.911h 15
21 Rotary Fuel Pump pipe 13mm Rotary Fuel Pump pipe 13mm 10 nos yogeshkumar.911h 15
22 Self Starter Assy 24V Self Starter Assy 24V 3 nos yogeshkumar.911h 15
23 Fuel Cut off Switch Fuel Cut off Switch 10 nos yogeshkumar.911h 15
24 Oil pipe compressor to Sump Oil pipe compressor to Sump 5 nos yogeshkumar.911h 15
25 Oil pipe Compressor to Filter Oil pipe Compressor to Filter 5 nos yogeshkumar.911h 15

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

8

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer