Hiring of Consultants - Milestone/Deliverable Based - Appointment of Independent Engineer for Provi
Central Transmission Utility Of India Limited
Progress
Quantity
1
Bid Type
Two Packet Bid
Organization: Central Transmission Utility Of India Limited (CTU) invites bids for Hiring of Consultants as Independent Engineer for the Network Expansion Scheme in the Navinal (Mundra) area, Gujarat for power drawl. The scope targets evaluation and oversight of expansion works, with the engagement defined as milestone/deliverable based. EMD: ₹59,000. Location: Navinal (Mundra), Gujarat. Contract type: Consultant services for network expansion oversight; no BOQ items listed. The tender references a dedicated Engineer-In-Charge: Shri Rakesh Ranjan Sharma, Chief Manager, PMG. A key differentiator is the inclusion of buyer-specific ATC terms superseding standard GeM GTC/SLA.
Independent Engineer for Network Expansion Scheme in Navinal (Mundra) area
Estimated value not disclosed; EMD ₹59,000
Milestone/deliverable-based engagement
Contract quantity/duration variability up to 25%
ATC terms supersede GeM GTC/SLA
Engineer-In-Charge: Shri Rakesh Ranjan Sharma
EMD amount ₹59,000 and delivery milestones tied to project deliverables
Contract quantity/duration may adjust by ±25% at issuance
ATC terms override standard GeM terms; ensure ATC document compliance
Not detailed in data; ATC document governs payments via milestone payments per deliverables
Milestone/deliverable based; specific dates not provided in data
Not specified; standard LT/LD not described in supplied information
Experience in consultancy for transmission network expansion projects
Financial stability evidenced by recent financial statements
Compliance with ATC terms uploaded on GeM portal
Central Transmission Utility Of India Limited
Central Transmission Utility Of India Limited
Central Transmission Utility Of India Limited
GURGAON, HARYANA
Central Transmission Utility Of India Limited
GURGAON, HARYANA
Central Transmission Utility Of India Limited
GURGAON, HARYANA
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar network expansion consultancy
Financial statements of last 2-3 years
EMD submission proof of ₹59,000
Technical bid or compliance certificates (as per ATC)
OEM authorizations or consultant credentials (if applicable)
Any project-specific authorization from CTU India
Key insights about HARYANA tender market
To bid, submit the EMD of ₹59,000 and complete the CTU GeM submission with Engineer-In-Charge details. Ensure compliance with ATC terms, provide relevant network expansion consultancy credentials, and attach experience certificates for similar projects in power transmission.
Required documents include GST, PAN, latest financial statements, last 3 years experience certificates for network expansion, EMD proof of ₹59,000, technical compliance certificates, and any OEM authorizations or consultant qualifications per ATC.
Eligible bidders must show prior experience in transmission network expansion, demonstrate financial stability with recent statements, and comply with ATC terms uploaded on GeM. A named Engineer-In-Charge contact is provided for project governance.
EMD is ₹59,000. Payment terms follow ATC provisions and milestone-based payments; ensure proof of EMD submission along with the bid, and follow any additional GeM portal instructions in the ATC document.
Contract quantity or duration can be increased or decreased up to 25% at the time of contract issue; once issued, adjustments remain capped at 25%. Bidders must accept revised quantities if adjustments occur.
ATC documents are uploaded on the GeM portal linked to this tender; bidders must review the uploaded ATC text, superseding standard GeM terms, and ensure compliance in the bid submission.
The Engineer-In-Charge is Shri Rakesh Ranjan Sharma, Chief Manager, PMG; include his contact details in the technical bid and align project milestones with his oversight responsibilities.
Milestones are milestone/deliverable based; specific dates are not provided in the data. Bidders should anticipate phased deliverables aligned to network expansion oversight and ensure timely reporting to the EIC.
Access all tender documents at no cost
Main Document
SCOPE_OF_WORK
OTHER
PAYMENT
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Main Document
SCOPE_OF_WORK
OTHER
PAYMENT
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS