GEM

Procurement Opportunity: Generator Electrode without diaphragm Part No-60345100,Double Pt-wire electrode for Coulometry Part in BULANDSHAHR, UTTAR PRADESH

Bid Publish Date

19-Nov-2025, 3:11 pm

Bid End Date

18-Dec-2025, 11:00 am

Latest Corrigendum Available

Progress

Issue19-Nov-2025, 3:11 pm
Corrigendum11-Dec-2025
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

3

Category

Generator Electrode without diaphragm Part No-60345100

Bid Type

Two Packet Bid

Categories 7

Public procurement opportunity for Nuclear Power Corporation Of India Limited Generator Electrode without diaphragm Part No-60345100, Double Pt-wire electrode for Coulometry Part No-60341100, Titration Vessel SGJ250 for KFT Coulometer Part No- 61464320 in BULANDSHAHR, UTTAR PRADESH. Quantity: 3 issued by. Submission Deadline: 18-12-2025 11: 00: 00. View full details and respond.

Past Similar Tenders (Historical Results)

5 found

1700222188 WELDING ELECTRODE 2.5MM E-7018,1700240146 FILLER WIRE 2.0X1000 M 316L,1700240145 FILLER

Nmdc Steel Limited

BASTAR, CHHATTISGARH

Posted: 4 August 2025
Closed: 22 August 2025
GEM

WELDING ELECTRODE TO SIZE 5 MM DIA X 450 MM LONG. BRANDS; E-717 OF M/S ADVANI OERLIK ON/ DIFFUSALLO

Yantra India Limited

NAGPUR, MAHARASHTRA

Posted: 16 July 2025
Closed: 30 July 2025
GEM

1.15101001170 1HD ELECTRODE (MANUAL) FOR PLA CUT 100P MACHINE PART NO. 7311HD10,2.15101001180 1HD S

National Aluminium Company Limited, Bhubaneswar

KORAPUT, ODISHA

Posted: 18 April 2025
Closed: 8 November 2025
GEM

pH electrode For Metrohm Autotitrator Model 848 tritino plus-LL -ELECTRODE PLUS WOC-pt no. 60262100

Nuclear Power Corporation Of India Limited

KANCHIPURAM, TAMIL NADU

Posted: 22 July 2025
Closed: 2 August 2025
GEM

GENERATOR ELECTRODE TZ 1752,END POINT ELECTRODE KF 1150

Iocl- Digboi Refinery

TINSUKIA, ASSAM

Posted: 12 April 2025
Closed: 26 April 2025
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

OEM Authorization Certificate

2

Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

3

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum Updates

1 Update
#1

Update

11-Dec-2025

Extended Deadline

18-Dec-2025, 11:00 am

Opening Date

18-Dec-2025, 11:30 am