GEM

BHEL Current Transformer Supply Tender 33KV/36KV CTs with Mounting Hardware - Rajasthan 2025

Bid Publish Date

02-Dec-2025, 4:09 pm

Bid End Date

22-Dec-2025, 3:00 pm

Latest Corrigendum Available

Progress

Issue02-Dec-2025, 4:09 pm
Corrigendum16-Dec-2025
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

24

Category

SUPPLY- CURRENT TRANSFORMER: 33KV, NEUTRAL CT FOR BANK OF 1-PH TRANSFORMER

Bid Type

Two Packet Bid

Categories 7

Tender Overview

Bharat Heavy Electricals Limited (BHEL) invites bids for the supply of CURRENT TRANSFORMERs: 33KV NEUTRAL CTs for banks of 1-PH transformers and 33KV NEUTRAL CTs for banks of reactors, plus 36KV single-phase CTs with mounting hardware. The tender scope encompasses multiple CT configurations intended for high-voltage transformer banks and associated hardware. The tender does not list itemized BOQ quantities or an estimated contract value in the available data. Tender location is not disclosed in the provided details. The procurement focus is on precise CTs and mounting components compatible with 33KV/36KV systems, with a possible emphasis on banked transformer/reactor configurations. Key differentiators include bank-of-transformer and bank-of-reactor CT combinations, plus mounting hardware integration. Unique aspects include a multi-CT supply requirement and associated hardware, directed at BHEL’s DH-related program.

Technical Specifications & Requirements

  • Product/Service: CURRENT TRANSFORMERs for 33KV and 36KV systems, including NEUTRAL CTs for banks of transformers and reactors, and mounting hardware for 36KV single-phase CTs.
  • Standards/Compliance: Not specified in the available data; no explicit IS/ISO codes listed.
  • Quantity/Value: No BOQ items or estimated value provided.
  • Delivery/Installation: Not specified; no delivery timeline available.
  • Vendor Eligibility: No explicit experience or certification requirements published here.
  • Documentation/Attachments: ATC document uploaded by buyer; terms may govern submission.

Terms, Conditions & Eligibility

  • EMD/Performance Terms: Not disclosed in the supplied tender data.
  • Delivery Timeline: Not stated; no delivery schedule is visible.
  • Payment Terms: Not listed in the provided information.
  • Documentation: ATC document referenced; GST, PAN, experience certificates, and technical compliance are common submissions but not confirmed here.
  • Quality/Support: No warranty or penalty clauses specified in the available data. bidders should review the ATC for exact terms.
  • Location: Specific site/location not provided; tender in unspecified location.

Key Specifications

  • Product/service names: CURRENT TRANSFORMERs for 33KV and 36KV systems; NEUTRAL CTs for banks of transformers/reactors; mounting hardware for 36KV single-phase CTs

  • Quantities/Capacities: Not disclosed in BOQ; BOQ items total = 0

  • Estimated value: Not disclosed

  • Experience: Not specified in available data

  • Quality/standards: Not specified in available data

  • Delivery/install: Not specified

  • OEM/Brand requirements: Not specified

Terms & Conditions

  • EMD: Amounts not disclosed; verify in ATC

  • Delivery terms: Timeline not provided; confirm in ATC

  • Documentation: Submit GST, PAN, experience certs, financials, EMD proofs as applicable

  • Warranty/penalties: Not stated; refer to ATC for clauses

Important Clauses

Payment Terms

Payment terms are not disclosed in the available data; bidders must refer to the ATC document for exact terms.

Delivery Schedule

No delivery schedule is visible in the provided data; ATC will define timelines and milestones.

Penalties/Liquidated Damages

No LD clauses are shown here; consult ATC for penalties or performance bonds, if any.

Bidder Eligibility

  • Experience in supplying current transformers and mounting hardware

  • Financial stability evidenced by audited statements

  • Compliance with OEM authorizations and technical certifications (as per ATC)

Past Similar Tenders (Historical Results)

5 found

SUPPLY OF CURRENT TRANSFORMER - CT - 11KV 20/5-5A 5VA-0.2S 15VA - 5P20

Bharat Heavy Electricals Limited (bhel)

KANCHIPURAM, TAMIL NADU

Posted: 15 January 2025
Closed: 25 January 2025
GEM

Current Transformer CTR 4000/1A

National Fertilizers Limited (nfl)

BATHINDA, PUNJAB

Posted: 7 May 2025
Closed: 28 May 2025
GEM

RU7403296141 CURRENT TRANSFORMER NORTH KARNPURA PROJECT

Bharat Heavy Electricals Limited (bhel)

CHATRA, JHARKHAND

Posted: 18 December 2024
Closed: 7 January 2025
GEM

E4943162 Current Transformer 01-SG4990199286-33 KV WOUND CT RATIO 1600/1-1A CORE-I: 15VA, 5P20 CORE

Bharat Heavy Electricals Limited (bhel)

BHOPAL, MADHYA PRADESH

Posted: 15 February 2025
Closed: 25 February 2025
GEM

Supply of Earthing Transformer (ET) or Neutral Grounding Transformer (NGT) for 278MVA Generator of

Sjvn Limited

Posted: 18 November 2024
Closed: 11 December 2024
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration

2

PAN card

3

Experience certificates showing prior CT supply experience

4

Financial statements (audited)

5

EMD/Security deposit proof (if required in ATC)

6

Technical bid documents (CTs, mounting hardware specifications)

7

OEM authorizations (if OEM-branded CTs)

8

Technical compliance certificates (as per ATC)

Corrigendum Updates

1 Update
#1

Update

16-Dec-2025

Extended Deadline

22-Dec-2025, 3:00 pm

Opening Date

22-Dec-2025, 3:30 pm

Frequently Asked Questions

How to bid for BHEL CT tender 33KV 2025 in India

Bidders should review the ATC uploaded by the buyer, ensure eligibility, and prepare documents: GST, PAN, financials, experience certificates, and OEM authorizations. The CTs must meet 33KV/36KV configurations and mounting hardware requirements; confirm EMD details in the ATC and submit a compliant technical bid by the stated deadline.

What documents are required for current transformer supply tender in India

Submit GST registration, PAN card, audited financial statements, experience certificates for CT supply, technical bid with CT type/specs, OEM authorization if applicable, and EMD proof. ATC may specify additional CT-specific tests and certifications; ensure alignment with 33KV/36KV CT configurations.

What are the technical specifications for 33KV neutral CTs in this bid

The tender specifies 33KV NEUTRAL CTs for banks of 1-PH transformers and 33KV NEUTRAL CTs for banks of reactors, plus 36KV single-phase CTs with mounting hardware. Specific circuit ratings, insulation levels, and mounting interfaces are expected in the ATC; confirm exact dimensions and terminal arrangements there.

When is the delivery timeline for BHEL CTs procurement

Delivery timelines are not disclosed in the public data; bidders must consult the ATC for the exact schedule, including any phased deliveries, site readiness, and installation support requirements that may apply to 33KV/36KV CTs.

What are the EMD requirements for this CT tender in India

EMD details are not visible in the provided information; bidders should check the ATC to confirm EMD amount, submission method (DD/online), and validity period aligned with bid submission.

What standards or certifications are required for CTs in this tender

The data does not list explicit standards; the ATC may require OEM certifications, testing certificates, and safety norms for high-voltage CTs. Verify IS/I S standards and any manufacturer-specified compliance in the ATC before bid submission.

How to verify eligibility for supplying CTs to BHEL Bank/reactor projects

Ensure prior CT supply experience, valid GST/PAN, financial health, and OEM authorizations. The ATC will specify any mandatory certifications and performance criteria; bidders should compile a dossier demonstrating capacity for 33KV/36KV CTs and mounting hardware delivery.

What documents must accompany the technical bid for CTs

Attach technical specifications, OEM authorizations, test certificates, and compliance documents for 33KV/36KV CT configurations. Include installation hardware details, cross-reference with ATC, and ensure alignment with bank-of-transformer/reactor CT requirements.