GEM

Northern Railway Washing Machine Domestic Purpose Tender 2025 Rajasthan ISI/AAA compliance

Bid Publish Date

21-Nov-2025, 5:04 pm

Bid End Date

02-Dec-2025, 11:00 am

Bid Opening Date

02-Dec-2025, 11:30 am

Progress

Issue21-Nov-2025, 5:04 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

6

Bid Type

Single Packet Bid

Categories 2

Tender Overview

Northern Railway invites bids for the procurement of Washing Machine - Domestic Purpose under a railways contract. The scope is limited to the supply of goods with an option to increase quantities by up to 25% at contracted rates. The delivery schedule ties to the original delivery period, with extensions calculated if the option is exercised. An OEM/Authorized Seller requirement ensures local after-sales support in India. The tender emphasizes past performance documentation as a precondition for bid opening, with a strict need for OEM authorization letters and vendor code submission. This opportunity is positioned within the Indian Railways procurement framework, targeting suppliers capable of in-country service and timely delivery.

Key differentiators include mandatory pre-bid performance evidence, post-receipt inspection by the consignee, and extended delivery time calculations tied to quantity adjustments. The ATC clauses stress valid authorizations and related documents uploaded in the correct fields. This tender signals a pure supply contract with no installation services, and it requires compliance with specified vendor qualification norms for railways.

Technical Specifications & Requirements

  • The procurement is categorized as Washing Machine - Domestic Purpose (Q2) with no BOQ items published.
  • Delivery responsibilities are limited to goods supply; no on-site installation is described.
  • Inspection will occur post-receipt at the consignee site; pre-dispatch inspection is not mandatory unless selected.
  • OEM/Authorized Seller must have an Indian registered office for after-sales support.
  • Conditional ATC clauses require prior performance documents (R.NOTE/RITES/IC/CRM records) before bid opening if available.
  • An authorization letter from the OEM in proper format is mandatory.
  • Rail vendor code submission may be requested; the option clause allows quantity variation up to 25%.

Terms, Conditions & Eligibility

  • EMD/guarantees are not explicitly quantified in the provided data; bidders should expect standard railways tender deposits.
  • The option clause enables a 25% increase/decrease in bid quantity at contract rates.
  • Post-receipt inspection by the consignee site is a mandatory acceptance step.
  • OEM authorization and Indian after-sales support capability are non-negotiable.
  • Past performance documentation (R.NOTE/RITES/CRM/installation reports) must be submitted prior to bid opening.
  • Technical deviations must be stated in ATC to be entertained; otherwise, they may be rejected.
  • Tender requires upload of related documents in correct fields; misfiling risks rejection.

Key Specifications

  • Product: Washing Machine - Domestic Purpose

  • Category: Q2 (no published BOQ items)

  • Delivery: Goods supply only, no installation explicitly stated

  • Inspection: Post-receipt at consignee site

  • OEM: Registered Indian office for after-sales support

  • Performance evidence: prior installation/compliance documents required before bid opening

  • ATC: Technical deviations to be disclosed within ATC clause

  • Authorization: OEM authorization letter required

Terms & Conditions

  • Option Clause: +/- 25% quantity adjustment at contracted rates

  • Post-receipt inspection by consignee site

  • OEM authorization with Indian office for after-sales service

  • Past performance documents mandatory before bid opening

  • Upload of documents in correct fields; ATC deviations only if stated

Important Clauses

Payment Terms

Not explicitly detailed; follow standard railway practice and any ATC specifics

Delivery Schedule

Delivery period starts from last date of original delivery order; extended period calculated as (increased quantity/original quantity) × original delivery period, minimum 30 days

Penalties/Liquidated Damages

Not specified in data; bidders should anticipate typical railways LD as per contract terms

Bidder Eligibility

  • Must provide OEM authorization with registered Indian office

  • Past performance evidence from central/state government or PSUs

  • Compliance with post-receipt inspection requirement

Past Similar Tenders (Historical Results)

5 found

Washing Machine - Domestic Purpose

Directorate Of Employment & Training

NAVSARI, GUJARAT

Posted: 21 August 2025
Closed: 5 September 2025
GEM

Washing Machine - Domestic Purpose

Nuclear Power Corporation Of India Limited

TIRUNELVELI, TAMIL NADU

Posted: 28 July 2025
Closed: 12 August 2025
GEM

Washing Machine - Domestic Purpose

Health Services

Posted: 29 May 2025
Closed: 9 June 2025
GEM

Washing Machine - Domestic Purpose

Ncra Tifr Pune

PUNE, MAHARASHTRA

Posted: 19 August 2025
Closed: 29 August 2025
GEM

South East Central Railway Washing Machine Domestic Procurement Raipur Chhattisgarh 2025 IoT Enabled, BEE Star Rated, IS 302 2024

South East Central Railway

RAIPUR, CHHATTISGARH

Posted: 23 October 2025
Closed: 3 November 2025
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST certificate

2

PAN card

3

Experience certificates of similar supplies

4

Financial statements (latest)

5

EMD/Security deposit documents (as applicable)

6

OEM authorization letters in proper format

7

Technical bid documents or R.NOTE/RITES/CRM reports for past performance

8

Railway vendor code (if available)

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid on the washing machine tender in Northern Railway today

Bidders must submit OEM authorization with Indian after-sales support, past performance documents (R.NOTE/RITES/CRM), and upload all documents in the correct fields. Follow the option clause for quantity adjustments up to 25% and be prepared for post-receipt inspection by the consignee.

What documents are required for the Northern Railway washing machine bid in 2025

Required documents include GST certificate, PAN, experience certificates for similar supplies, latest financial statements, EMD compliance, OEM authorization letter, and past performance reports. Ensure proper upload in the designated tender fields and provide rail vendor code if requested.

What are the delivery terms for the domestic washing machine tender

Delivery is for the supply of goods only, with the original delivery period followed by potential extensions. If quantity increases, the additional time is calculated as (increased quantity/original quantity) × original period, with a minimum of 30 days.

What is required for past performance compliance in this rail tender

Submit authentic documents such as installation, commissioning reports, or equivalent certifications from central/state organizations, PSUs, or public-listed companies. These must demonstrate successful compliance prior to bid opening for eligibility.

What OEM certifications are mandatory for railway washing machine supply

An OEM authorization letter in proper format is mandatory, along with proof of an Indian registered office for after-sales service. The bid requires a valid OEM partnership to ensure service support within India.

When is post-receipt inspection conducted for this tender

Inspection is conducted at the consignee site after material receipt. Pre-dispatch inspection is not mandatory unless specifically selected in ATC. Successful acceptance depends on meeting post-delivery verification criteria.

What is the 25% option clause in the Northern Railway tender

The purchaser may increase or decrease the bid quantity by up to 25% at contracted rates. During extension, additional time is calculated by (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.

What are the payment terms for the railways washing machine supply

Payment terms are not detailed in the provided data; bidders should align with standard railway practice and ATC terms, ensuring compliance with delivery milestones and post-acceptance procedures.