Custom Bid for Services - CPCLY25139 Cleaning of pipelines/Transfer line/De Choking using ROTOMOL/R
Chennai Petroleum Corporation Limited
TIRUVALLUR, TAMIL NADU
Menu
Bid Publish Date
02-Dec-2025, 9:56 am
Bid End Date
23-Dec-2025, 2:00 pm
EMD
₹1,42,000
Value
₹4,68,02,020
Location
Progress
Quantity
1
Bid Type
Two Packet Bid
The Procuring Organization is Chennai Petroleum Corporation Limited, issuing a service-centric tender for Supply, Erection & Dismantling of Scaffolding and Articulated Boom Lift & Scissor Lift to support pipeline inspection and thickness gauging during the pre-shutdown phase of Refinery-III M&I Shutdown. The estimated contract value is ₹46,802,019.52 with an earnest money deposit of ₹142,000. Location details are unspecified in the summary, but the engagement targets the Refinery-III facility. A key differentiator is the combination of scaffold systems with boost-lift machinery for complex inspection tasks, necessitating coordinated erection and dismantling with safety compliance.
The bid opportunity requires bidders to demonstrate capability to mobilize, install, operate, and remove scaffolding alongside articulated boom lifts and scissor lifts in refinery environments, aligning with pre-shutdown timelines. The contract scope emphasizes on-site logistics, safety management, and coordination with refinery maintenance teams.
Keywords embedded include: tender in Chennai, CPCL procurement, scaffolding and lift equipment, pre-shutdown maintenance bid, and refinery inspection support.
Product/service names and categories: Scaffolding supply, erection & dismantling; articulated boom lift; scissor lift
Quantities/values: Estimated contract value ₹46,802,019.52; EMD ₹142,000
Standards/qualifications: refinery safety compliance; MEWP operation in high-risk environments
Delivery/installation: On-site mobilization at Refinery-III for pre-shutdown; dismantling post-work
Experience: Proven ability to perform scaffolding and MEWP operations in refinery settings
Terms: 25% quantity/duration variation permitted; excess settlement option with documentation
Key Term 1: Quantity or duration may be adjusted up to 25% at contract issue
Key Term 2: Excess settlement allows additional charges with documented justification
Key Term 3: EMD amount is ₹142,000; standard bid documents required
Payment terms aligned to contract milestones with EMD compliance; exact terms to be defined in contract
Mobilization for pre-shutdown activities; on-site erection, operation, and dismantling of scaffolding and MEWP within shutdown window
Penalties for delays or non-compliance to safety and workmanship standards; details to be specified in contract
Experience in supplying and operating scaffolding and MEWP in refinery environments
Financial stability evidenced by statements
Ability to mobilize quickly for pre-shutdown activities
Chennai Petroleum Corporation Limited
TIRUVALLUR, TAMIL NADU
Indian Oil Corporation Limited
KAMRUP, ASSAM
Indian Oil Corporation Limited
KAMRUP, ASSAM
Chennai Petroleum Corporation Limited
TIRUVALLUR, TAMIL NADU
Indian Oil Corporation Limited
KAMRUP, ASSAM
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar scaffolding and MEWP projects
Financial statements or turnover proof (as applicable)
EMD deposit receipt or bank guarantee
Technical bid documents demonstrating capability to supply, erect, operate, and dismantle scaffolding, boom lifts, and scissor lifts
OEM authorization or dealership certificates for lift equipment (if required)
Safety certifications and site-access credentials (as applicable)
Extended Deadline
23-Dec-2025, 2:00 pm
Opening Date
23-Dec-2025, 2:30 pm
Key insights about TAMIL NADU tender market
Bidders must submit GST, PAN, experience certificates, financials, EMD ₹142,000, and technical bid. Demonstrate refinery-scale scaffolding and MEWP capability, provide OEM authorizations if required, and confirm adherence to safety standards for pre-shutdown work.
Required documents include GST certificate, PAN, experience certificates for similar projects, financial statements, EMD receipt, technical bid detailing capability to supply erection/dismantling of scaffolding and lifts, and OEM authorizations if applicable.
Equipment must include verified scaffolding systems, articulated boom lifts, and scissor lifts suitable for refinery inspections. Emphasis on safety compliance, on-site performance during pre-shutdown, and compatibility with pipeline thickness gauging tasks.
The EMD amount is ₹142,000. It must accompany the bid as per CPCL terms, with the tender submission detailing payment method and validity period during evaluation.
Mobilization must align with the refinery's pre-shutdown schedule for Refinery-III. Exact dates are provided in the contract; bidders should prepare rapid deployment capabilities and safety-compliant execution plans.
Required standards include refinery safety compliance for MEWP, equipment-specific certifications, and OEM authorizations if specified. Ensure the equipment meets regulatory requirements and safety norms for high-risk industrial deployments.
Contract allows up to 25% variation in quantity or duration at issue and post-issue. Bidders should price flexibly and document capability to scale mobilization, with plans for additional resources and logistics.
Scope includes supply, erection, operation, and dismantling of scaffolding and MEWP to support pipeline inspection and thickness gauging during Refinery-III M&I Shutdown, ensuring safe access and procedural compliance.
Sign up now to access all documents
Main Document
SCOPE_OF_WORK
OTHER
PAYMENT
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Choose from flexible plans to access tender documents instantly
Main Document
SCOPE_OF_WORK
OTHER
PAYMENT
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS