Submersible Pump Starters (Motor starter controls)
East Central Railway
BUXAR, BIHAR
Progress
Quantity
2
Bid Type
Two Packet Bid
The opportunity is issued by Bhakra Beas Management Board for the procurement of Submersible Pump Starters (Motor starter controls). The procurement scope is limited to the supply of goods, with no BOQ items listed. The tender lacks explicit location and monetary values, and the EMD amount is not disclosed in the available data. A notable differentiator is the supplier’s ability to fulfill a variable-order regime governed by the option clause and extended delivery timelines. This tender may appeal to manufacturers and distributors of motor starter controls seeking a government supply contract. The data hints at a straightforward supply contract with potential volume adjustments, making supplier capacity, stock readiness, and lead-time planning critical. Unique terms include a 25% quantity variation right during both initial and currency periods, with delivery-time calculations linked to original and extended periods.
Product/service: Submersible Pump Starters (Motor starter controls)
Scope: Supply of Goods only; no installation/maintenance services stated
Estimated value: Not disclosed in data; implies need to prepare for standard government supply pricing
Delivery terms: 25% variation allowed; delivery period tied to original and extended periods with minimum 30 days
Standards/Compliance: No specific standards listed in data; bidders should ensure IS/IEC compliant electrical controls and general safety compliance
EMD amount not disclosed; bidders must assume standard bid security and verify at bid submission
Option clause allows 25% quantity variation during contract and currency; delivery periods adjusted accordingly
Scope is strictly supply of goods; no installation or service obligations stated
Not specified in data; bidders should rely on standard government procurement payment terms in contract
Delivery period calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with minimum 30 days; extended delivery allowed
No LD terms provided in data; bidders should assume standard penalties per procurement rules or wait for further clarification
Experience in supplying submersible pump starters or electrical motor control equipment
Ability to meet government bidding and GST compliance
Financial capacity to supply goods under a government framework without installation/maintenance
East Central Railway
BUXAR, BIHAR
North Eastern Railway
BAREILLY, UTTAR PRADESH
Paradip Port Authority
Bhakra Beas Management Board
E-municipalities - Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh
JYOTIBA PHULE NAGAR, UTTAR PRADESH
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration document
PAN card
Experience certificates for similar supply of submersible pump starters or electrical motor controls
Financial statements or solvency details (as required by terms)
EMD/Security deposit documents (amount not specified; bidders should prepare per tender norms)
Technical bid documents confirming product specifications and conformity
OEM authorization or authorized distributor certificates (if applicable)
Key insights about PUNJAB tender market
Bidders should prepare GST, PAN, experience certificates, financial statements, and EMD documents. Confirm scope as supply-only, verify that no installation is required, and ensure compliance with option clause delivering up to 25% extra quantity. Ensure delivery timelines follow original and extended-period rules and price competitiveness.
Required documents include GST registration, PAN, up-to-date experience certificates for similar supply, financial statements, EMD/security deposit proof, technical bid demonstrating conformity to product specs, and OEM authorizations if applicable. Ensure all documents reflect current validity and organization details.
Delivery terms specify an option to increase quantity by 25% during contract and currency. The delivery period is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum 30 days for added time; extended periods may be allowed under contract.
No explicit standards are listed in the data; bidders should ensure IS/IEC compliance for electrical control equipment and seek confirmation on any specific BIS/ISI or IS 550 style compliance during bid submission.
The scope is strictly supply of goods; no installation, commissioning, or maintenance services are indicated. Bid prices should include all components required for delivery of the motor starter controls.
Dates are not disclosed in the provided data. Bidders should monitor official procurement portals for the latest bid notice, and prepare all required documents in advance to meet submission deadlines once published.
The EMD amount is not disclosed in the available information. Bidder should verify the exact EMD requirement in the final tender documents and arrange payment via the specified mode to ensure bid validity.
Eligibility includes demonstrable experience in supplying similar electrical control equipment, GST registration, and financial stability. OEM authorization may be required for certain brands; bidders should confirm disclosure of any brand-specific requirements before submission.
E-municipalities - Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh
📍 AGRA, UTTAR PRADESH
Access all tender documents at no cost
Main Document
GEM_GENERAL_TERMS_AND_CONDITIONS
Main Document
GEM_GENERAL_TERMS_AND_CONDITIONS