GPS Tracking System
National Institute Of Technology (nit)
BHOPAL, MADHYA PRADESH
Menu
Progress
Quantity
1
Bid Type
Two Packet Bid
The procurement is led by the Indian Army under the Department Of Military Affairs for a Surveillance Device for Tracking System. The scope includes potential quantity adjustments up to 25% during and after award, with delivery dynamics tied to original and extended periods. A Detailed Design Drawings approval process is required within 5 days of award, after which modifications may be mandated without LD. OEM integration and design control are emphasized, including an End User Certificate and secure end-to-end configuration. The project includes IPv6-ready IT equipment guidance and mandatory OEM/Authorized Reseller involvement for installation and testing, signaling a tightly regulated, design-forward procurement process.
Key technical clauses extracted from terms include:
Detailed Design Drawings approval within 5 days of award
Modification list provided within 5 days if required
Installation, Commissioning, Testing by OEM certified resource or authorized reseller
IPv6 readiness for IT equipment from day one
Non-return of faulty hard disks per security policy
End User Certificate in buyer format upon request
Option clause allows ±25% quantity change at contract and during currency
OEM authorization and IPv6 readiness are mandatory
End User Certificate may be required in buyer format
Detailed design drawings and approvals are time-bound
Documentation for vendor code creation includes PAN, GSTIN, cancelled cheque, EFT mandate
Not explicitly stated; ensure terms align with standard government procurements for Indian Army, including possible advance or milestone payments per contract.
Delivery periods linked to approval of Detailed Design Drawings; extended periods possible with the option clause and calculation formula.
LD applicable only if delayed beyond approved delivery regime; specific LD rate not disclosed in provided terms.
Must provide OEM authorization or be OEM-certified reseller
Must submit PAN, GSTIN, cancelled cheque, and EFT mandate
Must ensure IPv6 readiness and ability to install/commission as OEM-approved
National Institute Of Technology (nit)
BHOPAL, MADHYA PRADESH
Controller General Of Defence Accounts
NORTH SIKKIM, SIKKIM
Indian Army
SAGAR, MADHYA PRADESH
Bharat Heavy Electricals Limited (bhel)
TIRUCHIRAPPALLI, TAMIL NADU
Indian Army
NEW DELHI, DELHI
Tender Results
Loading results...
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN copy
Cancelled Cheque copy
EFT Mandate certified by Bank
OEM Authorization / Manufacturer Authorization
End User Certificate (if requested, in buyer format)
Key insights about PUNJAB tender market
Bidders must submit PAN, GSTIN, cancelled cheque, and EFT mandate for vendor code creation, provide OEM authorization, and ensure IPv6 readiness. Detailed Design Drawings must be approved within 5 days of award, with modification lists provided within 5 days. End User Certificate may be required in the buyer format.
Required documents include PAN Card, GSTIN, Cancelled Cheque, EFT Mandate certified by bank, Manufacturer/OEM Authorization, End User Certificate if requested, and evidence of OEM-certified installation capability; these accompany the technical bid and compliance statements.
All IT equipment must be IPv6 ready from day one; installation and configuration must be performed by OEM-certified personnel or authorized resellers; ensure compatibility with security policy requirements and end-user documentation as per buyer format.
The purchaser may increase/decrease quantity up to 25% at contract placement and during the currency at contracted rates. Delivery time adjusts by a formula based on original and extended periods with a minimum of 30 days.
An End User Certificate may be provided in the buyer’s standard format upon request. Ensure readiness to supply the certificate in the specified format to comply with buyer requirements.
Detailed Design Drawings must be submitted within 5 days of award; buyer approval or modification list provided within 5 days. Delivery is refixed if there is a delay in drawing approval, ensuring alignment with approved drawings.
Installation, commissioning, testing, and training must be conducted by OEM or OEM-certified resources, or an OEM-authorized reseller, ensuring compliance with IPv6 readiness and security policies.
Sign up now to access all documents
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Choose from flexible plans to access tender documents instantly
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS