Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - Industry Unit; Sub
Uttar Pradesh Power Corporation Limited (uppcl)
GAUTAM BUDDHA NAGAR, UTTAR PRADESH
Menu
Bid Publish Date
16-Dec-2025, 11:11 am
Bid End Date
29-Dec-2025, 12:00 pm
Value
₹29,500
Location
Progress
Quantity
1
Bid Type
Two Packet Bid
The Uttar Pradesh Power Corporation Limited (UPPCL) invites bids for Repair, Maintenance, and Installation of Plant/Systems/Equipment under its Energy Department. The estimated contract value is ₹29,500.00 with an undefined start/end date and no published BOQ items. The procurement category targets substation and related manufacturing/installation activities. A key differentiator is the explicit contract quantity/duration flexibility of up to 25% during issuance and after award, enabling scope adjustments. An additional feature is the Excess Settlement option allowing bidders to include extra charges up to a specified percentage, subject to documentary support. This tender emphasizes compliance with appended terms and document uploads as a gating factor for bid acceptance.
Product/Service: Repair, Maintenance & Installation of Plant/Systems/Equipment for UP substation contexts
Estimated value: ₹29,500.00
BOQ: 0 items published, no itemized quantities
Standards/Certifications: Not specified in data; bidders should be prepared to provide standard industry maintenance credentials
Delivery scope: Not specifically defined; typical scope includes field service, installation support, and preventive maintenance
Experience: Not enumerated; bidders should showcase prior substation/plant repair and installation capabilities
Warranty/AMC: Not mentioned; verify during bid submission and final terms
Contract quantity/duration may adjust up to 25% during and after issuance
Excess Settlement allows added charges up to a cap with supporting documents
Mandatory upload of required certificates/documents as per bid package and corrigendum
Not explicitly provided in the data; verify in final bid documents and ATC
Not explicitly provided; bidders should anticipate field service, installation timelines, and maintenance windows in final terms
Not specified in the provided information; confirm in official bid documents
Proven experience in repair, maintenance, and installation of plant/equipment for electrical substations
Demonstrated financial stability with supporting statements
Ability to comply with certificate/document requirements and submit with the bid
Uttar Pradesh Power Corporation Limited (uppcl)
GAUTAM BUDDHA NAGAR, UTTAR PRADESH
Uttar Pradesh Power Corporation Limited (uppcl)
Uttar Pradesh Power Corporation Limited (uppcl)
GAUTAM BUDDHA NAGAR, UTTAR PRADESH
Uttar Pradesh Power Corporation Limited (uppcl)
GAUTAM BUDDHA NAGAR, UTTAR PRADESH
Bharat Heavy Electricals Limited (bhel)
HARIDWAR, UTTARAKHAND
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates demonstrating relevant repair/maintenance/installation work
Financial statements or turnover proof
EMD/Security deposit documentation (as specified in final bid pack)
Technical bid documents and certificates
OEM authorizations or supplier certifications (if applicable)
Any certificates or compliance documents requested in ATC/Corrigendum
Key insights about UTTAR PRADESH tender market
Bidders should submit all required documents listed in the bid package, including GST, PAN, experience certificates, financial statements, and EMD documentation. Ensure you comply with the Excess Settlement option and the 25% quantity/duration adjustment. Prepare installation and maintenance capability evidence for substation contexts.
Submit GST registration, PAN, experience certificates, financial statements, and EMD/security deposit. Include technical bid documents, OEM authorizations if applicable, and any compliance certificates requested in the ATC or corrigenda. Upload all documents with the bid package to avoid rejection.
The contract allows a maximum 25% adjustment in contract quantity or duration at the time of issue, and the same limit applies post-award. Bidders must confirm acceptance of revised scope and duration if invoked by the buyer.
Excess Settlement permits bidders to include additional charges up to a specified percentage of the item-level total value, including addons, provided mandatory supporting documents accompany the invoice. Ensure the applicability is declared during invoice creation.
No itemized BOQ or technical specifications are published in the provided data. Bidders should rely on standard industry practices for electrical plant repairs and be prepared to demonstrate past performance and capability during bid evaluation.
Delivery/installation timelines are not explicitly stated in the data. Bid documents and ATC will specify schedules; bidders should be ready to propose field service timelines, maintenance cycles, and response times for substation equipment.
While not specified, bidders should showcase certifications relevant to electrical maintenance, safety, and quality management (e.g., IS certifications, ISO 9001, and OEM authorizations) along with project experience in substations.
The estimated value is ₹29,500.00. This modest value suggests a simplified scope; bidders should nonetheless present robust technical capability, complete documentation, and readiness to manage potential quantity-led adjustments under the 25% clause.
Uttar Pradesh Power Corporation Limited (uppcl)
📍 BUDAUN, UTTAR PRADESH
Sign up now to access all documents
Main Document
GEM_GENERAL_TERMS_AND_CONDITIONS
SCOPE_OF_WORK
GEM_GENERAL_TERMS_AND_CONDITIONS
Choose from flexible plans to access tender documents instantly
Main Document
GEM_GENERAL_TERMS_AND_CONDITIONS
SCOPE_OF_WORK
GEM_GENERAL_TERMS_AND_CONDITIONS