Rashtriya Chemicals And Fertilizers Limited (RCF), Mumbai, Maharashtra invites bids for the corrosion protection coating on a Tail Gas Scrubber with scaffolding erection. The contract scope covers coating works on a unit component within the manufacturing setup, with the emphasis on applying specified corrosion protection finishes and safe scaffolding installation. The opportunity is anchored to efficient on-site execution and adherence to HSE standards per NIT, with commercial terms including LD for delays and a clear payment timeline. The absence of BOQ items suggests a tightly scoped maintenance/repairs project requiring precise scheduling and coordination with plant operations.
This tender emphasizes structured site-work delivery, safety compliance, and alignment with the established procurement process of RC&F. The unique aspect is integration of scaffolding erection for coating activities, demanding certified safety practices and access planning. Key differentiators include a disciplined payment cycle post-completion and a capped LD regime to deter late performance while maintaining project momentum. Overall, bidders should prepare to demonstrate capability in corrosion-protective coatings and scaffolding management within a manufacturing environment.
Product/Service: Corrosion protection coating on Tail Gas Scrubber with scaffolding erection
Location: Mumbai, Maharashtra
EMD/Value: Not specified in data
Standards/Certifications: Not specified in data; bidders to demonstrate safety compliance per NIT
Delivery/Installation: On-site scaffolding erection included in scope; timing not disclosed
Warranty/AMC: Not specified in data; follow RC&F terms
LD 0.5% of contract value per week, max 10%
100% payment within 30 days after invoice submission
HSE requirements as per NIT; scaffolding included in scope
100% payment on 30th day from invoice submission; resubmission of corrected invoice also triggers 30-day payment cycle
Not explicitly defined; bidders must plan execution in coordination with RC&F plant operations and NIT requirements
LD at 0.5% per week for delays, capped at 10% of contract value
Proven experience in corrosion protection coating and scaffolding erection within manufacturing facilities
Compliance with HSE requirements per NIT
Ability to complete on-site coating works with safe scaffold access
Rashtriya Chemicals And Fertilizers Limited (rcf)
MUMBAI, MAHARASHTRA
Rashtriya Chemicals And Fertilizers Limited (rcf)
MUMBAI, MAHARASHTRA
Rashtriya Chemicals And Fertilizers Limited (rcf)
MUMBAI, MAHARASHTRA
Rashtriya Chemicals And Fertilizers Limited (rcf)
MUMBAI, MAHARASHTRA
Rashtriya Chemicals And Fertilizers Limited (rcf)
MUMBAI, MAHARASHTRA
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for corrosion protection/coating projects
Financial statements (annual report or equivalent)
EMD/Security deposit as per RC&F norms
Technical bid submission document detailing coating method and scaffolding plan
OEM authorizations or approved applicator certificates (if applicable)
HSE compliance declarations and safety plan per NIT
Key insights about MAHARASHTRA tender market
Bidders should submit GST, PAN, experience certificates, financial statements, and EMD as per RC&F terms. Provide technical bid detailing coating method and scaffolding plan. Ensure HSE compliance per NIT, and be ready to demonstrate safety certifications and OEM authorizations if applicable.
Required documents include GST certificate, PAN card, experience certificates for corrosion protection projects, financial statements, EMD/security deposit, technical bid, and OEM authorization if applicable. Also include HSE compliance plans and safety certifications per NIT standards.
Payment is released as 100% on the 30th day from invoice submission to the Contract Cell, with resubmission timelines identical. If discrepancies occur, corrected invoices must be resubmitted and will again be paid within 30 days upon receipt.
Delay LD is 0.5% of contract value per week or part thereof, capped at 10% of contract value for the delayed quantity. This applies to delays beyond the stipulated completion period as per NIT.
Yes, the scope explicitly includes scaffolding erection for applying corrosion protection coating on the Tail Gas Scrubber, requiring safe access planning and compliance with safety standards.
Bidders must comply with HSE requirements per NIT; while specific standards are not listed, demonstrate incident-free safety records, method statements, and on-site waste/disposal practices aligned to RC&F guidelines.
The data does not disclose an estimated contract value or EMD amount. Bidders should anticipate RC&F standard EMD practices and prepare financial readiness, along with compliance documentation, for the Mumbai scope.
Provide project histories showing prior corrosion protection work on similar equipment, WQM/QC test results, coating systems used, surface prep standards, and scaffolding safety records highlighting IS/ISO-aligned practices.
Rashtriya Chemicals And Fertilizers Limited (rcf)
📍 RAIGAD, MAHARASHTRA
Sign up now to access all documents
Main Document
OTHER
SCOPE_OF_WORK
GEM_GENERAL_TERMS_AND_CONDITIONS
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Choose from flexible plans to access tender documents instantly
Main Document
OTHER
SCOPE_OF_WORK
GEM_GENERAL_TERMS_AND_CONDITIONS
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS