LV1/R72 172.91. 132SB SHIELD COMMANDER WIND
Indian Army
PUNE, MAHARASHTRA
Menu
Bid Publish Date
07-Nov-2025, 4:42 pm
Bid End Date
18-Dec-2025, 12:00 pm
EMD
₹15,000
Location
Progress
Quantity
5
Category
External Force balance
Punjab Engineering College (pec), under the Education Department Chandigarh is inviting bids for the procurement of a Wind Tunnel Turn Table (External Force balance category) at CHANDIGARH, 160001. The bid covers Supply, Installation, Testing, Commissioning, Training of operators and providing any statutory clearances required. An EMD of ₹15,000 applies. The scope includes adherence to bid terms, with a notable option clause allowing quantity variation up to 25%, and an extended delivery period calculation based on (increased quantity ÷ original quantity) × original delivery period, with a minimum of 30 days. The bid emphasizes turnover criteria and OEM-related turnover requirements to verify financial capability. Unique conditions also require that for imported products, the OEM or authorized seller must maintain a registered office in India for after-sales service.
Product: Wind Tunnel Turn Table
Scope: Supply, Installation, Testing, Commissioning, Operator Training
EMD: ₹15,000
Turnover: Last 3 financial years; bidder and OEM turnover criteria
Imported products: OEM with Indian registered office for after-sales service
Minimum average annual turnover over last 3 financial years as specified in bid document
OEM turnover requirements (primary product category) for bunch bids
Registered Indian office for after-sales service if delivering imported products
Indian Army
PUNE, MAHARASHTRA
Indian Oil Corporation Limited
NASHIK, MAHARASHTRA
Indian Army
KAMRUP, ASSAM
Indian Army
ALMORA, UTTARAKHAND
Samastipur District Panchayats
DARBHANGA, BIHAR
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | External Force balance | An external balance system is required for wind tunnel applications which can measure the six basic components of force (3) and moment (3) acting on a test model from a location outside the wind tunnel. This should come along with a support table, dummy force balance, Data acquisition, processing and Display System. | 1 | pieces | [email protected] | 60 |
| 2 | Wind tunnel turn table | Refer attached apecification document | 1 | pieces | [email protected] | 60 |
| 3 | NaN | NaN | 1 | pieces | [email protected] | 60 |
| 4 | Not applicable | Not applicable | 1 | pieces | [email protected] | 60 |
| 5 | Not required | Not required | 1 | pieces | [email protected] | 60 |
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Audited financial statements for last 3 years or CA certificate indicating turnover
OEM authorization or certificate (for non-manufacturer bidders)
Technical compliance certificates (if any) and installation capability documents
Bid security/EMD payment proof
Experience certificates for similar projects
Company registration/incorporation proof
Extended Deadline
18-Dec-2025, 12:00 pm
Opening Date
18-Dec-2025, 12:30 pm
Key insights about CHANDIGARH tender market
Bidders must submit all required documents listed in the terms, including GST, PAN, turnover proof, and OEM authorizations. Ensure the EMD of ₹15,000 is paid as bid security. Compliance with the option clause allowing up to 25% quantity variation is mandatory, along with delivery and training provisions.
Submit GST and PAN, audited financials or CA certificate for turnover, experience certificates for similar installations, OEM authorization if not a direct manufacturer, technical compliance documents, and EMD payment proof. Include Indian office proof for imported equipment OEMs.
Eligible bidders must demonstrate three-year turnover alignment with bid thresholds, provide OEM turnover evidence, and show ability to supply, install, test, commission, and train operators. Imported equipment must have an Indian after-sales service office.
The contract allows up to 25% variation in quantity at the contracted rate; delivery time extends proportionally based on the formula (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum 30 days.
Punjab Engineering College (pec) under the Education Department Chandigarh is the issuing body for the wind tunnel turn table procurement in Chandigarh 2025. The bid includes supply, installation, testing, commissioning, and operator training.
Yes. Imported equipment must be supported by an OEM or authorized seller with a registered Indian office for after-sales service. This ensures local maintenance, spares availability, and service responsiveness post-installation.
The EMD amount is ₹15,000. Payment terms are specified in the bid document and typically align with government procurement norms, including bid security submission and subsequent payment upon contract award and acceptance testing.
Scope covers end-to-end delivery: supply, installation, testing, commissioning, and training of operators. The winning bidder must also facilitate any statutory clearances required for operation and ensure smooth handover with documentation.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Choose from flexible plans to access tender documents instantly
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS