GEM

Indian Army DUST CAP FOR RESERVOIR, OIL PUMP, IGNITION LOCK Procurement Leh Jammu & Kashmir 2025

Bid Publish Date

19-Nov-2025, 7:34 pm

Bid End Date

29-Nov-2025, 8:00 pm

Bid Opening Date

29-Nov-2025, 8:30 pm

Progress

Issue19-Nov-2025, 7:34 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

125

Category

DUST CAP FOR RESERVOIR

Bid Type

Two Packet Bid

Categories 12

Tender Overview

The Indian Army, Department of Military Affairs, invites bids for a multi-item procurement listed under the category including DUST CAP FOR RESERVOIR, OIL PUMP, ASSY LEADING, IGNITION CUM STEERING LOCK, BRAKE LINING KIT FRONT, BRAKE LINING KIT REAR, AIR PRESSURE PIPE, CRANK SHAFT SEAL, and DOOR BEADING. The order is planned for Leh, Jammu & Kashmir 194101 with a potential MOQ across 9 items though exact quantities and estimated value are not disclosed. A notable clause grants the buyer a quantity variation up to 25% and a similar extension window during the currency of the contract at contracted rates. Delivery timelines hinge on the original delivery order, with a minimum extension rule of 30 days. Bidders must align to the option clause and bid accordingly.

Key differentiators include the broad mechanical scope across engine, braking, and sealing components and the requirement to manage partial quantity adjustments without price renegotiation. This tender’s unique aspect lies in the joint selection of 9 diverse items under a single contract and the option-based delivery extension mechanism.

Technical Specifications & Requirements

  • No explicit product specifications are published; the BOQ lists 9 items: DUST CAP FOR RESERVOIR, OIL PUMP ASSY LEADING, IGNITION CUM STEERING LOCK, BRAKE LINING KIT FRONT, BRAKE LINING KIT REAR, AIR PRESSURE PIPE, CRANK SHAFT SEAL, DOOR BEADING, plus N/A entries in the BOQ.
  • The only technical constraint references an option clause allowing up to 25% quantity variation and corresponding delivery extension as a function of the ratio between increased and original quantities.
  • Delivery period terms originate from the last date of the original delivery order; extended time follows the calculated formula with a minimum 30 days.
  • EMD/estimated value details are not disclosed publicly; bidders should prepare as per standard Army procurement practices and verify via the bid document.
  • No explicit standards (ISO/IS/IS) or brand requirements are stated in the available data.

Terms, Conditions & Eligibility

  • Option Clause: Purchaser may increase/decrease quantity by up to 25% of bid quantity at contract award and during currency, with delivery time computed as (increased/original quantity) × original delivery period, minimum 30 days.
  • Delivery: The delivery schedule shall commence from the last date of the original delivery order; extended periods apply if options exercised.
  • Submission notes: Bidders must comply with option-based delivery modifications and ensure pricing covers potential quantity changes.
  • EMD/financial terms: Not disclosed in the provided data; bidders should anticipate standard Army practices and confirm during bid submission.
  • Documentation: GST, PAN, experience certificates, financials, OEM authorizations, and technical bid documentation are typically required; verify exact requirements in the terms.

Key Specifications

  • Product/service names from tender category: DUST CAP FOR RESERVOIR, OIL PUMP ASSEMBLY LEADING, IGNITION CUM STEERING LOCK, BRAKE LINING KIT FRONT, BRAKE LINING KIT REAR, AIR PRESSURE PIPE, CRANK SHAFT SEAL, DOOR BEADING

  • BOQ indicates 9 items with N/A quantities; implies bundled procurement

  • EMD value and estimated contract value not disclosed; bidders should assume Army-scale supply

  • Option clause allows ±25% quantity change and extended delivery periods with a minimum 30-day extension

  • No specific standards or brand/OEM requirements listed in available data

Terms & Conditions

  • 25% quantity variation allowed during contract execution

  • Delivery period starts after original delivery order; extension calculated by ratio

  • Provide standard bid documents; EMD and value to be confirmed in terms

Important Clauses

Payment Terms

Any payment terms will be defined in the final bid document; bidders should expect Army standard terms and confirm currency and milestones in the bid.

Delivery Schedule

Delivery begins from the last date of the original delivery order; extended time applies when option quantity is exercised, following the (Increased quantity ÷ Original quantity) × Original delivery period formula.

Penalties/Liquidated Damages

Penalties or LD details are not provided here; bidders must check the final bid for LD terms and ensure compliance with delivery milestones.

Bidder Eligibility

  • Proven experience in supplying automotive and mechanical components

  • GST registration and PAN verification

  • Financial capacity to handle Army-scale procurements

Past Similar Tenders (Historical Results)

5 found

VANE PUMP ASSY,STEERING GEAR BOX OIL SEAL,SWITCH LOCK IGNITION,HUB NUT AND BOLT,BRAKE PAD,CLUTCH CA

Indian Army

RAJAURI, JAMMU & KASHMIR

Posted: 19 December 2024
Closed: 9 January 2025
GEM

AC and Water Pump Drive Belt,Air Filter,Alternator and Power Steering Pump Drive Belt,Brake Shoe,Fu

Indian Army

KARGIL, JAMMU & KASHMIR

Posted: 22 July 2025
Closed: 6 August 2025
GEM

Tapper Cover Gasket,Oil Seals Front Axel,Push Spring Rear,Cable Handle Brake,Lock Assy Steering Ign

Indian Air Force

JODHPUR, RAJASTHAN

Posted: 27 June 2025
Closed: 18 July 2025
GEM

Steering pump Assy,Water pump Assy,Brake booster,Fog lamp assy,Clutch cylinder assy,Brake Shoes,Sha

Indian Army

RAMGARH, JHARKHAND

Posted: 9 January 2025
Closed: 30 January 2025
GEM

DOOR LOCK ASSY,OIL SEAL FOR HUB,FUEL FEED PUMP,CABLE ASSY SPEEDOMETER,PUMP ASSY WATER,FUEL SUPPLY T

Indian Army

Posted: 25 November 2024
Closed: 16 December 2024
GEM

Bill of Quantities (BOQ) 9 Items

Item # Title Description Quantity Unit Consignee Delivery (Days)
1 DUST CAP FOR RESERVOIR STLN 115 nos [email protected] 15
2 OIL PUMP BPL 1 nos [email protected] 15
3 ASSY LEADING TMB 1 nos [email protected] 15
4 IGNITION CUM STEERING LOCK TMB 2 nos [email protected] 15
5 BRAKE LINING KIT FRT BPL 1 set [email protected] 15
6 BRAKE LINING KIT REAR BPL 2 set [email protected] 15
7 AIR PRESSURE PIPE BPL 1 nos [email protected] 15
8 CRANK SHAFT SEAL BPL 1 nos [email protected] 15
9 DOOR BEADING BPL 1 feet [email protected] 15

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar procurements

4

Financial statements (recent years)

5

EMD/Security deposit documentation

6

Technical bid documents

7

OEM authorizations / dealership certificates

8

Any standard compliance certificates if specified in bid

Frequently Asked Questions

Key insights about JAMMU AND KASHMIR tender market

How to bid for Indian Army dust cap and brake kit tender in Leh 2025

Bidders must submit GST, PAN, experience certificates, financial statements, EMD documents, OEM authorizations, and technical bid. The tender includes 9 items with an option clause allowing ±25% quantity variation. Ensure delivery planning aligns with the original and extended delivery period; price adjustments follow contracted rates.

What documents are required for Indian Army procurement in Leh JK

Required documents typically include GST registration, PAN, company/firm registration, experience certificates for similar supply, financial statements, EMD proof, technical bid/proposal, and OEM authorizations. Verify exact list in the bid invitation and ensure all documents meet Army bid format.

What are the technical requirements for Army brake lining kit tender

No explicit technical specs are published; bidders should assume standard brake lining kit dimensions for-front and rear, compatible with armored vehicle platforms, and provide OEM certifications where applicable. Your bid should include installation fitment data and compatibility confirmation.

How does the 25% quantity variation clause affect delivery in Leh

If quantity increases by up to 25%, the delivery period is adjusted using (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum 30-day extension. This requires flexible production planning, buffer inventory, and supplier coordination with the Army orders.

What is the expected payment terms for Indian Army procurement in JK

Payment terms are defined in the final bid document; bidders should expect Army-style terms potentially including milestones tied to delivery acceptance and performance, with clear timelines for payment after submission of compliant invoices and required acceptance tests.

What are the eligibility criteria for supplying engine seals and dust caps

Eligibility includes prior experience in similar automotive/defense components, valid GST and PAN, sound financials, and OEM authorizations if applicable. Demonstrate capability to meet bulk orders, maintain quality standards, and provide warranty and after-sales support where required.

When is the delivery schedule for Army items in Leh likely

Delivery timing depends on the last date of the original delivery order; if the option clause is exercised, the extension is computed per the formula, with a guaranteed minimum 30-day extension. Prepare production flow to accommodate potential schedule shifts.

What standards or certifications are required for this Army tender in 2025

Specific standards are not listed in the available data; bidders should ensure compliance with general defense-grade supplier requirements, maintain ISO/IS certifications where applicable, and secure OEM authorizations if items require brand-specific compliance.