CABLE ASSY CLUTCH CONTROL SPEEDOMETER,SPEEDOMETER ASSY WITH BULB,OIL FILTER,CARDAN JOINT,BRACKET MO
Indian Army
JAMMU, JAMMU & KASHMIR
Bid Publish Date
20-Nov-2025, 2:58 pm
Bid End Date
01-Dec-2025, 3:00 pm
Bid Opening Date
01-Dec-2025, 3:30 pm
Location
Progress
Quantity
13
Category
Propeller Shaft Assy front
Bid Type
Single Packet Bid
The Indian Army – Department Of Military Affairs invites bids for a group of automotive assemblies including Propeller Shaft Assembly (front), Wind Shield Glass, Oil Filter Assembly, Speedometer Assembly, Speedometer Cable, and Siren. The BOQ lists 7 items, with unspecified quantities, and an estimated value not disclosed. A pre-bid meeting and mandatory physical inspection are required to ensure store-mismatching avoidance. An option clause allows a ±25% quantity fluctuation at contracted rates, with delivery extensions calculated per the formula provided, and a minimum 30 days extension. This procurement emphasizes compatibility with existing military stores and inspection-based bid validation.
25% quantity variation rights at contracted rates
Mandatory pre-bid meeting and physical inspection
Delivery-time extension rules with minimum 30 days
Not specified in tender data; bidders should seek confirmation of payment timeline during pre-bid.
Delivery extends per option clause; calculated as (Increase quantity ÷ Original quantity) × Original delivery period, minimum 30 days.
Not specified; bidders should verify LD terms in final contract during negotiations.
Experience in supplying automotive assemblies or equivalent military-grade components
Ability to provide OEM authorizations or manufacturer-backed supply
Financial capability to meet potential 25% quantity fluctuation without default
Indian Army
JAMMU, JAMMU & KASHMIR
Indian Army
BHARATPUR, RAJASTHAN
Indian Army
FARIDKOT, PUNJAB
Indian Army
BARAMULLA, JAMMU & KASHMIR
Indian Army
WEST DELHI, DELHI
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Propeller Shaft Assy front | Propeller Shaft Assy front | 1 | nos | 154wksp.gem | 45 |
| 2 | Wind Shield Glass | Wind Shield Glass | 1 | nos | 154wksp.gem | 45 |
| 3 | Oil Filter Assy | Oil Filter Assy | 5 | nos | 154wksp.gem | 45 |
| 4 | Speedometer Assy | Speedometer Assy | 1 | nos | 154wksp.gem | 45 |
| 5 | Speedometer Cable | Speedometer Cable TATA | 3 | nos | 154wksp.gem | 45 |
| 6 | Speedometer Cable | Speedometer Cable STLN | 1 | nos | 154wksp.gem | 45 |
| 7 | Siren | Siren | 1 | nos | 154wksp.gem | 45 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar automotive assembly supply
Financial statements or turnover proof
EMD/Security deposit documents (as applicable by buyer terms)
OEM authorization letter or manufacturer’s authorization
Technical bid/compliance certificates if available
Key insights about HIMACHAL PRADESH tender market
Submit required documents including GST, PAN, financials, and OEM authorization. Attend the mandatory pre-bid meeting and pass the physical inspection to verify compatibility with Army stores. Prepare to address the 25% quantity variation clause and confirm delivery timelines per contract terms.
Provide GST certificate, PAN card, experience certificates for similar supply, financial statements, EMD/security deposit documents, OEM authorization or manufacturer support letter, and technical bid/compliance certificates as applicable by the buyer terms.
Delivery time may extend when quantity changes by up to 25% at contracted rates. The extension is calculated as (Increase quantity ÷ Original quantity) × Original delivery period, with a minimum 30 days; extensions may apply during currency of contract.
Items include Propeller Shaft Assembly (front), Wind Shield Glass, Oil Filter Assembly, Speedometer Assembly, Speedometer Cable, and Siren. Seven BOQ items exist, but exact quantities are not disclosed in the tender data.
Yes, a pre-bid meeting is mandatory before bid opening to align bidders with scope and inspection requirements; non-attendance may disqualify bids or affect evaluation.
No explicit technical standards are published in the tender; bidders should emphasize OEM compatibility, interchangeability with Army catalogs, and provide OEM authorizations to validate compliance.
Payment terms are not specified in the provided data. Bidders should await notification through the terms in the final contract and confirm milestones and documentation for payment processing during post-bid negotiations.
During contract, the purchaser may increase or decrease quantity by up to 25% at the contracted rates; the extension time uses the specified formula, ensuring minimum 30 days extra delivery in all cases.
Access all tender documents at no cost
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS