GEM

Indian Army Air Dryer Rep Kit & Related Components Tender Baramulla Jammu & Kashmir 2025

Bid Publish Date

24-Nov-2025, 6:58 pm

Bid End Date

04-Dec-2025, 7:00 pm

Progress

Issue24-Nov-2025, 6:58 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

8

Category

Air Dryer Rep Kit

Bid Type

Two Packet Bid

Categories 6

Tender Overview

The Indian Army, Department Of Military Affairs, invites bids for a set of six items including air dryer rep kit, large O rings, ball bearings (SRE), 15 Amp fuse, rod assembly steering, and air exhaust valve for supply to Baramulla, Jammu & Kashmir (193101). The BOQ shows 6 items with unspecified quantities and values, but an option clause allows up to 25% quantity variation at contract award and during the contract term, at contracted rates. Original sealed packaging is required; courier charges for non-conforming items are payable by the seller. This tender targets OEMs and suppliers with readiness for military-grade components and strict packaging standards. The procurement scope emphasizes compliance with delivery timelines and handling of option quantities without altering unit pricing.

Key Specifications

  • Product/service names: 'Air Dryer Rep Kit', 'O Ring Large', 'Ball Brg SRE', 'Fuse 15 Amp', 'Rod Assy Steering', 'Air Exhaust Valve'

  • Quantity: total items = 6 (quantities not disclosed in available data)

  • EMD/Estimated value: not specified in the provided data

  • Delivery: starts from last date of original delivery order; optioned extensions follow formula with minimum 30 days

  • Packaging: original and sealed packaging required; courier charges for non-conforming items borne by seller

  • Standards/Certification: not specified; bidders should confirm compatibility with military standards and OEM specs

  • Warranty/Support: not specified; consider post-delivery support terms in final bid

Terms & Conditions

  • Option Clause allows +/- 25% quantity variation at contract execution and during the currency of the contract

  • Delivery period adjustments rely on the original plan with a 30-day minimum extension

  • Items must be original and sealed; non-conformity triggers courier charge reimbursement by seller

Important Clauses

Payment Terms

Not detailed in the provided data; final tender will specify advance, milestones, and settlement terms

Delivery Schedule

Delivery begins after the last date of the original delivery order; optioned quantity changes adjust delivery time proportionally with minimum 30 days

Penalties/Liquidated Damages

Not specified here; return courier charges for non-conforming items are payable by the seller

Bidder Eligibility

  • OEM authorization demonstrating eligibility to supply military spares

  • Experience in supplying similar components to defense or government agencies

  • Financial capacity evidenced by annual turnover or creditworthiness suitable for contract values (to be specified in final tender)

Past Similar Tenders (Historical Results)

5 found

REP KIT AIR DRYER ASSY,INJECTOR ASSY FUEL,SYSTEM PROTECTION VALVE,REP KIT PISTON ASSY AIR COMPRESSO

Indian Army

Posted: 1 November 2024
Closed: 22 November 2024
GEM

FIELD COIL ASSY,REP KIT AIR DRYER ASSY,CLUTCH MASTER CYLINDER 19.05 DIA,HAZARD WARM SWITCH,BRAKE LI

Indian Army

LALITPUR, UTTAR PRADESH

Posted: 6 February 2025
Closed: 27 February 2025
GEM

Air Dryer Rep Kit,Air Dryer With Unloader Valve,Assy Auxiliary Water Tank,Assy Universal Joint Prop

Indian Army

Posted: 4 November 2024
Closed: 25 November 2024
GEM

REP KIT AIR DRYER ASSY,WIPER MOTOR,ELECTRIC FAN ASSY,KIT OF CONDENSER COMPLETE,GRADUATED HAND BRAKE

Indian Army

Posted: 3 November 2024
Closed: 25 November 2024
GEM

ASSY FLY WHEEL,REP KIT AIR DRYER,KIT ASSY AIT TANK,HOUSING OIL SEAL,TAPERED ROLLER BRG,RELAY BRAKE

Indian Army

MATHURA, UTTAR PRADESH

Posted: 18 June 2025
Closed: 9 July 2025
GEM

Bill of Quantities (BOQ) 6 Items

Item # Title Description Quantity Unit Consignee Delivery (Days)
1 Air Dryer Rep Kit SML 1 nos [email protected] 15
2 O Ring Large SML 1 nos [email protected] 15
3 Ball Brg SRE SML 1 nos [email protected] 15
4 Fuse 15 Amp SML 2 nos [email protected] 15
5 Rod Assy Steering MG 1 nos [email protected] 15
6 Air Exhaust Valve TMB 2 nos [email protected] 15

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar military/spares supply

4

Financial statements (past 2-3 years)

5

EMD/Security deposit proof (if specified in final tender)

6

Technical bid documents showing compliance

7

OEM authorization / manufacturer authorization letters

8

Original packaging certification or sealing proof

9

any other documents listed in final tender terms

Frequently Asked Questions

Key insights about JAMMU AND KASHMIR tender market

How to bid in the Indian Army air dryer spare parts tender Baramulla?

Bidders must submit OEM authorization, original packaging proof, GST, PAN, and experience certificates along with technical and financial bids. Ensure compliance with delivery timelines and the option quantity clause. The final documents will specify EMD, payment terms, and packaging standards for Baramulla procurement.

What documents are required for Indian Army spares tender in Jammu & Kashmir?

Documents include GST certificate, PAN, 2-3 years financial statements, OEM authorization, technical bid, experience certificates in defense supply, and packaging compliance proofs. Ensure items are original and sealed per ATC clause and provide courier charge agreements for non-conforming items.

What are the key technical requirements for air dryer kit and spares tender?

Key requisites include OEM-grade components: Air Dryer Rep Kit, O Ring Large, Ball Brg SRE, Fuse 15 Amp, Rod Assy Steering, and Air Exhaust Valve. Ensure sealed packaging, compatibility with military standards, and adherence to delivery timeframes plus the option quantity variation clause.

When is the delivery period for quantity variations in this tender Baramulla?

Delivery periods commence from the last date of the original delivery order. If quantity increases under the option clause, the extension is calculated as (additional quantity/original quantity) × original delivery period, with a minimum of 30 days and possible extension up to the original delivery period.

What is the eligibility requirement for supplying military spares in this bid?

Eligible bidders should demonstrate OEM authorization, defense-supply experience, and financial capacity. They must provide original sealed packaging and be prepared to manage up to 25% quantity variation at contract award and during the term, per ATC terms.

What happens if items do not meet technical specifications in this tender?

If items fail to meet specifications, the courier return charges are payable by the seller. Suppliers should ensure items match the listed product names and packaging standards; final documentation will confirm penalties or replacements.