Dual port charger,XT 60 12 awg charging cable,XT 90 10 awg charging cable,Balance cable connector,A
Indian Army
KOTA, RAJASTHAN
Menu
Bid Publish Date
28-Dec-2025, 10:15 am
Bid End Date
07-Jan-2026, 11:00 am
Location
Progress
Quantity
5
Category
Dual Port Charger
Bid Type
Single Packet Bid
The Indian Army, Department Of Military Affairs, seeks procurement of multiple electrical charging components including Dual Port Charger, XT 60 12 AWG charging cable, XT 90 10 AWG charging cable, Balance Cable Connector Port, and AC Connection Cable for Input. The BOQ lists 5 items, with no explicit quantities or values disclosed. Key selection drivers include OEM/ OEM Certified installation, commissioning, testing, and potential on-site training. A notable feature is the option clause allowing quantity adjustments of up to 25% during both initial and currency periods, with delivery time recalculated from the last delivery order date and a minimum extension of 30 days. This tender emphasizes controlled delivery and extended timeframes within contract rates. Tender scope appears to favor vendors capable of scale and rapid adaptation to variable orders.
Product scope includes: Dual Port Charger, XT 60 12 AWG Cable, XT 90 10 AWG Cable, Balance Cable Connector Port, AC Connection Cable for Input
OEM/ OEM-certified installation, commissioning, testing, configuration, and training required
Delivery quantity adjustment up to 25%, with corresponding delivery extension formula and minimum of 30 days
Administrative documents: PAN, GSTIN, Cancelled Cheque, EFT Mandate
Inspection by nominated agency: Pre-dispatch or Post Receipt depending on ATC selections
Option to increase/decrease quantity up to 25% during contract and currency
OEM installation and training must be performed by OEM-certified personnel
Three-year turnover evidence required; audited statements or CA certificate accepted
Not specified in data; bidders should anticipate standard government payment terms on delivery and acceptance post-inspection
Delivery period recalculated when options are exercised; minimum additional time 30 days; base and extended timelines anchored to original delivery period
Not specified; bidders should review ATC for LD provisions related to late delivery or non-conformance
Evidence of three-year turnover via audited statements or CA certificate
OEM authorization or ability to deploy OEM-certified installation resources
GST registration and PAN submission with bid
Indian Army
KOTA, RAJASTHAN
Indian Army
GURDASPUR, PUNJAB
Indian Army
BARAMULLA, JAMMU & KASHMIR
Indian Army
BARAMULLA, JAMMU & KASHMIR
Indian Army
BARAMULLA, JAMMU & KASHMIR
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Dual Port Charger | Dual Port Charger | 1 | nos | moregem | 15 |
| 2 | Xt 60 12 awg Charging Cable | Xt 60 12 awg Charging Cable | 1 | nos | moregem | 15 |
| 3 | Xt 90 10 awg Charging Cable | Xt 90 10 awg Charging Cable | 1 | nos | moregem | 15 |
| 4 | Balance Cable Connector Port | Balance Cable Connector Port | 1 | nos | moregem | 15 |
| 5 | AC Connection Cable for Input | AC Connection Cable for Input | 1 | nos | moregem | 15 |
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN copy
Cancelled Cheque copy
EFT Mandate certified by bank
Non-Disclosure Declaration on bidder letterhead
Audited financial statements or CA certificate indicating three-year turnover
OEM authorization or OEM-certified installation capability
Bidder code creation documents (as applicable per ATC)
Key insights about UTTAR PRADESH tender market
To bid, submit PAN, GSTIN, Cancelled Cheque, EFT Mandate, and a Non-Disclosure Declaration. Ensure OEM authorization or OEM-certified installation capability. Prepare three-year turnover evidence via audited statements or CA certificate and be ready for OEM installation/commissioning by trained personnel.
Required documents include PAN, GSTIN, Cancelled Cheque, EFT Mandate certified by bank, Non-Disclosure Declaration, and turnover evidence. Also include OEM authorization if you will provide on-site installation and training per ATC.
The purchaser may increase or decrease bid quantity up to 25% of bid quantity at contract award and during currency. Delivery timelines adjust using the specified formula with a minimum extension of 30 days.
Installation, commissioning, testing, and training must be performed by OEM or OEM-certified resource or OEM-authorized reseller, ensuring proper handover and training as per scope.
Standards would be tied to product safety and interoperability; OEM-certification and proper supplier documentation, with turnover proof for eligibility, are essential.
Inspection can be Pre-dispatch at seller premises or Post Receipt at buyer site, depending on ATC selections; nominated inspection agency conducts inspections prior to acceptance.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Choose from flexible plans to access tender documents instantly
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS