Capacitor Bank, 3.3 KV, 75 KVAR
Northern Coalfields Limited
Progress
Quantity
25
Category
43 KVAr HT Capacitor Units
Bid Type
Two Packet Bid
Hindustan Petroleum Corporation Ltd seeks procurement and installation services for 43 KVAr HT Capacitor Units, 86 KVAr HT Capacitor Units, and related installation of capacitor units at BIPS in Hisar, Haryana. The tender lacks published BOQ items, and the estimated value and EMD are not disclosed. The buyer reserves an option to increase or decrease quantity by up to 25%, with contractual rates unchanged. Delivery timing is linked to the original and extended delivery periods, with calculated extra time based on (increased quantity ÷ original quantity) × original delivery period, with a minimum of 30 days. This creates a flexible объем for cap installation projects while preserving price certainty. The ATC document has been uploaded by the buyer for bidder reference, and bidders must align with the option clause terms.
Product/service names: 43 KVAr HT Capacitor Units, 86 KVAr HT Capacitor Units, Installation of capacitor units at BIPS
Quantities: Not disclosed in BOQ; quantity flexibility +/- 25% as per option clause
Estimated value: Not disclosed
Experience: Implied high-voltage capacitor installation capability
Standards/certifications: Not specified in tender data; verify via ATC and HPCL terms
Option clause allows +/- 25% quantity adjustment with fixed contracted rates
Delivery schedule ties to last date of original order with extension rules
ATC document uploaded; bidders must review for site-specific requirements
Not detailed in provided data; refer to ATC and HPCL terms for payment schedule
Delivery period starts from last date of original delivery order; extended time calculated per formula and minimum 30 days
Not specified in the available data; confirm in ATC and contract terms
Proven capability to supply and install 43 KVAr and 86 KVAr HT capacitor units
Experience on high-voltage capacitor installation projects
Compliance with HPCL ATC terms and site safety requirements
Northern Coalfields Limited
Nmdc Limited
DANTEWADA, CHHATTISGARH
Iti Limited
BANGALORE, KARNATAKA
Hindustan Aeronautics Limited (hal)
NASHIK, MAHARASHTRA
Post Graduate Institute Of Medical Education And Research Chandigarh
CHANDIGARH, CHANDIGARH
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates of similar high-voltage capacitor installation projects
Financial statements for the last 3 years or turnover proof
EMD submission proof (as applicable per tender terms)
Technical bid documents detailing capacitors and installation approach
OEM authorization letters (where applicable for branded components)
Any site readiness or safety certification documents
Key insights about HARYANA tender market
Bidders should review the uploaded ATC, align with the option clause allowing +/-25% quantity changes, prepare bids with the absence of BOQ details, submit GST, PAN, experience and financial documents, and ensure installation capability for 43 KVAr and 86 KVAr HT capacitor units at BIPS, Hisar.
Required documents include GST registration, PAN, past project experience certificates for HV capacitor installation, financial statements, EMD proof, technical bid detailing capacitors and installation approach, OEM authorizations if branded components are used, and safety/site readiness certificates.
Delivery starts from the last date of the original delivery order; if quantity is increased, the extended period equals (increased/ original) × original period, with a minimum of 30 days. The purchaser may extend time up to the original delivery period during option exercise.
Scope comprises supply of 43 KVAr HT Capacitor Units, 86 KVAr HT Capacitor Units, and on-site installation at BIPS in Hisar, Haryana, under HPCL procurement guidelines; exact quantities require confirmation from the ATC and PO terms.
tender data does not specify standards; bidders should verify IS/IEC requirements via the ATC and obtain OEM certifications if applicable, ensuring high-voltage equipment compliance and safety compliance for installation at BIPS.
Price finalization occurs at contract award with fixed rates for the ordered quantity; delivery timelines follow the original order schedule and any extension due to the option clause, with minimum 30 days added for extended periods.
Access all tender documents at no cost
Main Document
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Main Document
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS