Guide Bars
Bharat Heavy Electricals Limited (bhel)
MEDAK, TELANGANA
Bid Publish Date
22-Nov-2025, 12:40 pm
Bid End Date
02-Dec-2025, 1:00 pm
Bid Opening Date
02-Dec-2025, 1:30 pm
Location
Progress
Quantity
1
Bid Type
Single Packet Bid
Organization: Iisco Steel Plant, a unit of Steel Authority of India Limited. Product: Guide Rails at Drive End procurement. The tender includes an option clause allowing up to 25% quantity variation at contracted rates, with delivery time recalculation based on original/extended periods. Inspection will occur at ISP Stores via the Inspection Cell, and conformity must be proven by warranty/guarantee certificates and Material Test Certificates. Bidders must ensure one-to-one replacement of materials installed on Sinter Machine SP1 & SP2 and supply complete sets. GST-related obligations and OEM authorization are explicit requirements. Delivery and invoicing must align with GST regulations (GSTIN on invoice, GST portal payment confirmation). Eligible bidders must upload required certificates and documents to participate in the bid.
One-to-one replacement of materials installed on Sinter Machine SP1 & SP2
Supply must be complete in all respects to form one set for each installation
Inspection at ISP Stores by Inspection Cell
Warranty/Guarantee Certificate required (per ATC, GEM Tender, GTC)
Material Test Certificate and Fitment Guarantee Certificate to accompany supply
Invoices to be raised in consignee name with consignee GSTIN
GST invoice and GST portal payment screenshot required
Option clause permits 25% quantity variation both at contract award and during currency at contracted rates
GST compliance is mandatory; exact GST amount reimbursement rules apply
OEM/manufacturer authorization required for non-OEM bidders; ensure proper vendor code
GST-related reimbursements as per actuals or applicable rates; invoice must reflect consignee GSTIN; GST payment proof to be uploaded on GeM portal
Delivery period starts from the last date of original delivery order; option-driven extensions calculated as (increased quantity/original quantity) × original delivery period, with a minimum of 30 days
Penalty provisions and LD if supply/delivery terms are breached; specific LD rate not disclosed in ATC
OEM/manufacturer authorization for non-OEM bidders
Provision of PAN and GSTIN with valid GST invoice capability
Ability to replace installed Sinter Machine components on SP1 & SP2 with complete sets
Bharat Heavy Electricals Limited (bhel)
MEDAK, TELANGANA
Bharat Dynamics Limited
MEDAK, TELANGANA
Durgapur Steel Plant
BARDHAMAN, WEST BENGAL
Bharat Dynamics Limited
MEDAK, TELANGANA
Bharat Earth Movers Limited (beml)
KOLAR, KARNATAKA
Tender Results
Loading results...
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN copy
Cancelled cheque copy
EFT Mandate certified by bank
OEM Manufacturer Authorization / Distributor authorization with complete details
Warranty/Guarantee Certificate as per ATC, GEM Tender and GTC
Material Test Certificate
Fitment Guarantee Certificate
GST invoice scanned copy and GST payment confirmation screenshot
Any other certificates sought in ATC/Corrigendum
Key insights about WEST BENGAL tender market
Bidders must submit PAN, GSTIN, Cancelled Cheque, and EFT Mandate; provide OEM or Manufacturer Authorization if not the OEM; attach Warranty, Material Test Certificate, and Fitment Guarantee; ensure GST invoice naming and upload GST payment proof on GeM portal; comply with 25% quantity variation option clause.
Required documents include PAN Card, GSTIN, Cancelled Cheque, EFT Mandate, OEM Authorization/Distributor authorization, Warranty/Guarantee Certificate, Material Test Certificate, Fitment Guarantee Certificate, and GST invoice with payment confirmation; ensure all certificates align with ATC/GEM/GTC terms.
The purchaser may increase or decrease the quantity by up to 25% at contract placement and during contract currency at contracted rates; delivery time adjusts proportionally based on the formula (increased quantity/original quantity) × original delivery period, with a minimum of 30 days.
Inspections occur at ISP Stores by the Inspection Cell; conformity to specifications must be demonstrated; require Warranty/Guarantee Certificate, Material Test Certificate, and Fitment Guarantee Certificate to accompany supply.
Invoices must be raised in the consignee name with the consignee GSTIN; upload scanned GST invoice and GST payment confirmation on the GeM portal; ensure payment terms align with tender ATC/GTC guidance.
Required certifications include OEM authorization for non-OEM bidders; warranty/guarantee certificates per ATC, GEM Tender and GTC; Material Test Certificate and Fitment Guarantee Certificate; ISI/IS standards are referenced in the tender context for conformity.
Delivery starts from the last date of the original delivery order; for option quantities, the extended time equals (increased quantity ÷ original quantity) × original delivery period, with a minimum extension of 30 days; the purchaser may extend within original delivery limits.
Submit an Authorization Form/Certificate detailing OEM/service provider name, designation, address, email, and phone number; ensure it accompanies the bid if the bidder is not the OEM; ensure validity and alignment with supplier registration.
Access all tender documents at no cost
Main Document
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Main Document
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS