GEM

Contract Bidding Open For DESIGN SUPPLY OF LATEST VIBRATION MONITORING SYSTEM FOR AIR BLOWER,Supervision of Errection and com in RUPNAGAR, PUNJAB

Bid Publish Date

09-Dec-2025, 9:58 am

Bid End Date

12-Jan-2026, 11:00 am

EMD

₹1,00,000

Progress

Issue09-Dec-2025, 9:58 am
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

3

Category

DESIGN SUPPLY OF LATEST VIBRATION MONITORING SYSTEM FOR AIR BLOWER

Bid Type

Two Packet Bid

Categories 15

A tender has been published for National Fertilizers Limited (nfl) DESIGN SUPPLY OF LATEST VIBRATION MONITORING SYSTEM FOR AIR BLOWER, Supervision of Errection and commissioning for vibration monitoring system, Training of NFL Engineers for Vibration monitoring System in RUPNAGAR, PUNJAB. Quantity: 3 by. Submission Deadline: 12-01-2026 11: 00: 00. Check eligibility and apply.

Past Similar Tenders (Historical Results)

5 found

Online condition monitoring system for blowers as per annexure

Directorate Of Purchase And Stores

Posted: 15 November 2024
Closed: 7 December 2024
GEM

Supply and Installation of Machining Vibration Measuring System

Indian Institute Of Technology (iit)

DHANBAD, JHARKHAND

Posted: 20 February 2025
Closed: 1 April 2025
GEM

VIBRATION MEASURING SYSTEM

Durgapur Steel Plant

BARDHAMAN, WEST BENGAL

Posted: 30 January 2025
Closed: 10 February 2025
GEM

GAS TURBINE VIBRATION SENSORS -C14A250017,VIBRATION MONITORY SYSTEM-C14A250017

Chennai Petroleum Corporation Limited

TIRUVALLUR, TAMIL NADU

Posted: 12 March 2025
Closed: 22 March 2025
GEM

Vibration Data Acquisition system

Directorate Of Purchase And Stores

MUMBAI, MAHARASHTRA

Posted: 29 January 2025
Closed: 20 February 2025
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Certificate (Requested in ATC)

2

Additional Doc 1 (Requested in ATC)

3

Additional Doc 2 (Requested in ATC)

4

Additional Doc 3 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

5

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer