Shell and Tube Heat Exchanger: Tag No. - HE-01, HE-02 & HE-03 (IBR Service) -1 No. Each
Bridge And Roof Company (india) Limited
VISAKHAPATNAM, ANDHRA PRADESH
Bid Publish Date
22-Nov-2025, 1:12 pm
Bid End Date
02-Dec-2025, 2:00 pm
Bid Opening Date
02-Dec-2025, 2:30 pm
Progress
Quantity
1
Bid Type
Two Packet Bid
Northern Coalfields Limited invites bids for the SHAAN LUBE HEAT EXCHANGER SHELL AND TUBE category, with scope including Supply, Installation, Testing and Commissioning. The tender specifies a flexible quantity option of up to 25% of bid quantity during both initial and currency periods. The procurement location is within India under Coal India Limited governance. Bidders must disclose whether they are manufacturers or traders and provide proof of manufacturing or principal/OEM authorization. Unique logistics clauses emphasize replacement of damaged items within one month and full responsibility for rejected lots. The bid includes a single, comprehensive landed cost approach driven by the GEM portal terms.
Scope: SHAAN LUBE heat exchanger shell and tube
Quantity: flexible up to 25% variation
Delivery: from original delivery date; minimum extension 30 days
Warranty/Replacement: damaged items replaced within 1 month
Documentation: full certificates and OEM proof required
Option clause allows 25% quantity variation during contract
Delivery period calculations include minimum 30 days extension
Damaged/rejected goods must be replaced within one month
Not specified in data; bidder to verify ATC for landed cost and any extra charges
Delivery timeline linked to original delivery order date with option-driven extensions; minimum 30 days for added quantity
Replacements required within one month; non-compliance may lead to buyer termination of certain lots at supplier risk
Manufacturer or trader/distributor status clearly declared
Proof of manufacturing or OEM authorization submitted
Compliance with all ATC and bid terms; certificates uploaded
Bridge And Roof Company (india) Limited
VISAKHAPATNAM, ANDHRA PRADESH
Oil India Limited
DIBRUGARH, ASSAM
Bharat Petroleum Corporation Ltd
Hindustan Petroleum Corporation Ltd
VISAKHAPATNAM, ANDHRA PRADESH
Indian Air Force
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration
PAN card
Experience certificates (similar projects)
Financial statements (turnover evidence)
EMD/Security deposit documentation
Technical bid documents
OEM authorizations or principal manufacturing proof
Proof of manufacturing for manufacturers or OEM authorizations for traders
Make/model declarations of offered items
Certificates required by bid document/ATC
Bidders must declare manufacturer or trader status, submit OEM/manufacturing proof, upload all required certificates, and provide a complete landed cost including installation, testing, and commissioning. Ensure compliance with ATC clauses and disclose make/model of offered item.
Required documents include GST registration, PAN, experience certificates for similar projects, financial statements, EMD, technical bid, OEM authorizations or principal manufacturing proof, and proof of make/model. All certificates must be uploaded per bid terms.
Delivery extensions are triggered by the option clause allowing up to 25% quantity variation. The extended period uses (increased quantity / original quantity) × original delivery period, with a minimum of 30 days.
Damaged items arriving at the consignee must be replaced within one month at supplier cost. If replacement is delayed or incomplete, the buyer is not responsible after the one-month window.
Scope includes Supply, Installation, Testing and Commissioning of SHAAN LUBE heat exchanger shell and tube units, with the total landed cost to be quoted by the bidder.
Yes, non-compliance may trigger rejection of lots; replacements must occur within one month at supplier risk, otherwise the buyer may pursue remedies per ATC.
All certificates sought in the bid document and ATC must be uploaded; manufacturers must prove manufacturing capability or provide OEM documentation for the offered item.
Yes, the purchaser may increase or decrease quantity by up to 25% during the contract at contracted rates, with delivery timing adjusted accordingly.
Access all tender documents at no cost
Main Document
TECHNICAL
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Main Document
TECHNICAL
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS