GEM

Indian Army FPV Gear Tender Assam 2025 - FPV 5 Inch Frame, Propellers, Goggles, Batteries

Bid Publish Date

24-Nov-2025, 5:31 pm

Bid End Date

04-Dec-2025, 7:00 pm

Progress

Issue24-Nov-2025, 5:31 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

18

Category

FPV 5 Inch Carbon Fiber Frame

Bid Type

Two Packet Bid

Categories 15

Tender Overview

The Indian Army, Department Of Military Affairs, seeks procurement of FPV drone hardware in DARRANG, ASSAM 784113, covering items such as FPV 5 Inch Carbon Fiber Frame, Propellers, FPV Analog Goggles, Batteries with long endurance, FPV Multi Port Charger, Remote Control, and FPV Soldering Iron. The BOQ lists 7 items but details are not disclosed; estimated value and EMD are not provided. The tender emphasizes a quantity option clause up to 25% and mandatory Manufacturer Authorization from OEM or authorized distributors. This procurement targets reliable, field-ready FPV equipment under government supply terms.

Key differentiators includeBidder must furnish OEM authorization Zertificates and comply with the option quantity policy; delivery timing mechanics are linked to original and extended periods, with adjustments based on the formula provided. Unique aspects involve the explicit right to vary quantity and the requirement for OEM-backed bids, ensuring compatibility with Indian Army drone operations.

Location, organization, and product mix: FPV drone components for military use in Assam; emphasis on authentic OEM support and documented authorization. The absence of explicit dates or start/end times in the data requires bidders to align proposals with standard government procurement cycles and ensure readiness for rapid delivery under contract terms.

Technical Specifications & Requirements

  • Core product categories identified: FPV 5 Inch Carbon Fiber Frame, Propellers, FPV Analog Goggles, Batteries with long Endurance, FPV Multi Port Charger, Remote Control, FPV Soldering Iron.
  • No numeric technical specs provided; emphasis on compliance to OEM authorization and government delivery norms.
  • Terms specify an Option Clause allowing up to 25% quantity variation during contract execution; delivery period scales with the extended time rule and a minimum of 30 days.
  • OEM authorization is mandatory for authorized distributors, with explicit requirement to furnish an Authorization Form/Certificate detailing name, designation, address, email, and phone.
  • The tender expects standard government procurement practices and alignment with Indian Army supply contracts.

Terms, Conditions & Eligibility

  • Option Clause: Purchaser may increase/decrease quantity up to 25% of bid/contract quantity; extended delivery period calculated as (Increased quantity ÷ Original quantity) × Original delivery period, min 30 days.
  • Manufacturer Authorization: Bids from Authorized Distributors must include OEM authorization with full contact details.
  • No explicit Start/End dates or estimated value/EMD provided; bidders should assume standard government tender timelines and ensure OEM-backed proposals.
  • Required to comply with terms of supply contracts and delivery terms under Department Of Military Affairs regulations.
  • Additional terms include adherence to standard procurement and delivery in accordance with Indian Army procedures.

Key Specifications

  • Product/service names: FPV 5 Inch Carbon Fiber Frame, FPV Propellers, FPV Analog Goggles, Batteries with long Endurance, FPV Multi Port Charger, Remote Control, FPV Soldering Iron.

  • Quantities/Capacities: Not disclosed in BOQ; 7 items listed with N/A quantities.

  • Estimated value/EMD: Not specified; no numeric figures provided.

  • Standards/Compliance: No explicit standards listed; emphasis on OEM authorization.

  • Delivery/Installation: Delivery period terms exist via option clause; formula-based extension with minimum 30 days.

Terms & Conditions

  • Option Clause permits ±25% quantity variation during contract and currency of the contract.

  • OEM authorization must accompany bids from distributors; include full authorisation details.

  • Delivery period adjustments are calculated with a minimum 30-day extension.

Important Clauses

Payment Terms

Not specified in data; standard government terms likely apply upon delivery and acceptance.

Delivery Schedule

Delivery period begins from last date of original delivery order; extended time calculated per option clause with a minimum 30 days.

Penalties/Liquidated Damages

Not specified; typical contracts include LD for delayed delivery; bidders should verify during bid submission.

Bidder Eligibility

  • Must provide OEM/Manufacturer Authorization for FPV equipment.

  • Authorized distributor status with complete contact details.

  • Compliance with standard government procurement practices and delivery obligations.

Past Similar Tenders (Historical Results)

5 found

Frame,Flight Stack,Motors,GPS,Camera,VTX Video Transmitter,Receiver,Propellers,Battery,FPV Goggles,

Indian Army

DODA, JAMMU & KASHMIR

Posted: 12 August 2025
Closed: 25 August 2025
GEM

Frame,Flight stack,Motors,GPS,camera,VTX Video Transmitter,Receiver,Propellers,Battery,FPV goggles,

Indian Army

DODA, JAMMU & KASHMIR

Posted: 13 August 2025
Closed: 29 August 2025
GEM

Frame,Flight Stack,Motors,GPS,Camera,VTX Video Transmitter,Receiver,Propellers,Battery,FPV Goggles,

Indian Army

RAJAURI, JAMMU & KASHMIR

Posted: 1 September 2025
Closed: 12 September 2025
GEM

Frame,Flight Stack,Motors,GPS,Camera,VTX Video Transmitter,Receiver,Propellers,Battery,FPV Goggles,

Indian Army

RAJAURI, JAMMU & KASHMIR

Posted: 31 August 2025
Closed: 10 September 2025
GEM

Indian Army Frame, Flight Stack & FPV Equipment Tender PoONCH Jammu & Kashmir 2025

Indian Army

POONCH, JAMMU & KASHMIR

Posted: 22 October 2025
Closed: 3 November 2025
GEM

Bill of Quantities (BOQ) 7 Items

Item # Title Description Quantity Unit Consignee Delivery (Days)
1 FPV 5 Inch Carbon Fiber Frame Premium Quality 1 nos besrilal 20
2 Propellers Premium Quality 6 nos besrilal 20
3 FPV Analog Goggles Premium Quality 1 nos besrilal 20
4 Batteries with long Endurance Premium Quality 5 nos besrilal 20
5 FPV Multi Port Charger Premium Quality 1 nos besrilal 20
6 Remote Control Premium Quality 3 nos besrilal 20
7 FPV Soldering Iron Premium Quality 1 nos besrilal 20

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

OEM/Manufacturer Authorization certificate / Authorisation Form with OEM details (name, designation, address, email, phone).

2

Bidder submission documents as per Terms and Conditions (GST registration, PAN, company details).

3

Technical bid documents confirming capability to supply FPV gear categories (Frame, Propellers, Goggles, Batteries, Charger, Remote, Soldering Iron).

4

CM/DOCs for compliance with government procurement norms (EMD proof if applicable by practice).

Frequently Asked Questions

Key insights about ASSAM tender market

How to bid for the FPV gear tender in Assam 2025?

To bid, secure OEM authorization from the drone gear manufacturer, attach an Authorization Form with complete contact details, and submit FPV equipment proposals covering the 7 item category. Ensure alignment with the 25% quantity variation clause and supply terms under the Department Of Military Affairs.

What documents are required for the Indian Army FPV tender in Assam?

Required documents include OEM authorization/MA from the drone gear manufacturer, official GST registration, PAN details, company profile, technical bid detailing FPV product capability, and any standard compliance certificates. Ensure the bid package reflects the 7 listed FPV items.

What are the delivery terms for the Indian Army FPV procurement in Assam?

Delivery terms rely on the original delivery period with an option to extend by up to 25% in quantity. The extended time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days, and may extend to the original delivery duration with approval.

What standards or certifications are required for FPV equipment bids?

The tender emphasizes OEM authorization and government procurement compliance; explicit ISI/ISO standards are not listed. Bidders should provide OEM certifications and ensure product compatibility with Indian Army requirements and robust field performance.

What is the scope of items in the FPV procurement in Assam 2025?

Scope includes FPV 5 Inch Carbon Fiber Frame, Propellers, FPV Analog Goggles, Batteries with long Endurance, FPV Multi Port Charger, Remote Control, and FPV Soldering Iron; exact quantities are not disclosed in the BOQ.

How to verify OEM authorization for the FPV tender in Assam?

Verify the Authorization Form/Certificate includes OEM name, designated contact, address, email, and phone. The bid must include this documentation for eligibility; without it, the bid may be rejected per the Manufacturer Authorization clause.

When is the bid submission deadline for the FPV gear tender in Assam?

No explicit deadline is provided in the data; bidders should monitor official tender portals for the Department Of Military Affairs procurement schedule and ensure timely submission with OEM authorization and technical bid.