Wick Type Kerosene Oil Heater
Indian Army
ANANTHNAG, JAMMU & KASHMIR
Bid Publish Date
05-Nov-2025, 7:16 pm
Bid End Date
28-Nov-2025, 7:00 pm
Bid Opening Date
12-Nov-2025, 7:30 pm
Location
Progress
Quantity
10
Bid Type
Two Packet Bid
Indian Army seeks procurement of a Bazooka Heater (Kerosene) in Kinnaur, Himachal Pradesh. While no technical specs are provided, the tender imposes an option clause allowing up to 25% quantity variation at contracted rates, with delivery extensions calculated as (increased/original) × original period, minimum 30 days. A detailed design drawing approval is required within 5 days post-award, with buyer approval or modification lists delivered within a further 5 days. Bidders must demonstrate 3 years of regular manufacture and supply to government entities and non-obsolescence of offered products. Bidder GST and vendor code prerequisites are included. This procurement targets OEMs or authorized resellers with government experience and compliant financial standing.
Bazooka Heater (Kerosene) product name and category
25% quantity variation right at contract award and during currency
Delivery period adjustment formula: (increased quantity ÷ original quantity) × original delivery period
Minimum delivery time extension: 30 days
5-day window for Detailed Design Drawings submission post-award
5-day approval/modification list return from buyer
3-year govt/PSU supply experience requirement
3-year residual market life requirement; no end-of-life declaration by OEM
GST handling: reimbursement as actuals or applicable rate, whichever lower
Vendor code creation documents: PAN, GSTIN, Cancelled Cheque, EFT Mandate
Option clause permits up to 25% quantity variation at contract rates
5-day submission and 5-day approval window for Detailed Design Drawings
3-year Govt/PSU supply experience required; not end-of-life product
GST handling by bidder; reimbursement based on actuals or applicable rate, whichever is lower, within the quoted GST percentage
Delivery period may be extended proportionally for increased quantity; minimum 30 days; extensions may apply during currency of contract
No explicit LD details provided; delays due to drawing approvals may adjust delivery period without LD
Regular manufacture and supply of same/similar category products to Central/State Govt or PSU for 3 years before bid opening
Not under liquidation or court receivership; provide undertaking
Not declared end-of-life by OEM within three years of bid
Indian Army
ANANTHNAG, JAMMU & KASHMIR
Indian Army
DARJEELING, WEST BENGAL
Indian Army
DARJEELING, WEST BENGAL
Indian Army
LEH, JAMMU & KASHMIR
Dg Armed Forces Medical Service
LEH, JAMMU & KASHMIR
Tender Results
Loading results...
Discover companies most likely to bid on this tender
Copy of PAN Card
Copy of GSTIN
Copy of Cancelled Cheque
Copy of EFT Mandate certified by Bank
Evidence of 3 years govt/PSU supply experience
Contract copies with Central/State Govt or PSUs
Declaration of non-liquidity / no receivership
Details of vendor code creation prerequisites
Any OEM authorization for bazooka heater kerosene products
Extended Deadline
28-Nov-2025, 7:00 pm
Opening Date
28-Nov-2025, 7:30 pm
Extended Deadline
27-Nov-2025, 7:00 pm
Opening Date
27-Nov-2025, 7:30 pm
Extended Deadline
20-Nov-2025, 7:00 pm
Opening Date
20-Nov-2025, 7:30 pm
Extended Deadline
19-Nov-2025, 7:00 pm
Opening Date
19-Nov-2025, 7:30 pm
Key insights about HIMACHAL PRADESH tender market
Bidders must submit PAN, GST, cancelled cheque, EFT mandate, and proof of 3 years govt/PSU supply experience. Include Detailed Design Drawings within 5 days of award and obtain buyer approval within 5 days; comply with 25% quantity variation and delivery extension rules.
Prepare PAN, GSTIN, Cancelled Cheque, EFT Mandate, and contracts showing 3 years govt/PSU supply experience. Include non-liquidity undertaking and OEM authorizations if applicable; ensure products are not end-of-life per OEM and meet 3-year market life.
The purchaser may increase/decrease quantity up to 25% at contract rates. Delivery time scales with a formula: (increase/original) × original delivery period, minimum 30 days; extended time permissible during contract currency.
Submit Detailed Design Drawings within 5 days of contract award. Buyer will approve or issue modification lists within 5 days; if delaying, the delivery period is re-fixed without LD for the delay period.
Bidders or OEMs must have regularly manufactured and supplied the same category products to Central/State Govt or PSUs for at least 3 years before bid opening.
The product must have a residual market life of at least 3 years and must not be declared end-of-life by the OEM within that period; ensure ongoing supply capability.
GST will be paid by the buyer as reimbursement to the bidder at actuals or at the applicable rate, whichever is lower, within the bidder's quoted GST percentage.
Submit PAN, GSTIN, Cancelled Cheque, and EFT Mandate; ensure bank certification and alignment with vendor code creation requirements.
Access all tender documents at no cost
Main Document
GEM_GENERAL_TERMS_AND_CONDITIONS
Main Document
GEM_GENERAL_TERMS_AND_CONDITIONS