GEM

Bids are Invited For Back liner FR 600 HC, Item-W4,BEARING FRAME FR600-S-M2,PUMP SHAFT FOR MESTO PUMP MM300,Bearing hous in CUDDAPAH, ANDHRA PRADESH

Bid Publish Date

28-Nov-2025, 2:59 pm

Bid End Date

29-Dec-2025, 9:00 am

EMD

₹35,500

Progress

Issue28-Nov-2025, 2:59 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

5

Category

Back liner FR 600 HC, Item-W4

Bid Type

Two Packet Bid

Categories 25

A tender has been published for Uranium Corporation Of India Limited Back liner FR 600 HC, Item-W4, BEARING FRAME FR600-S- M2, PUMP SHAFT FOR MESTO PUMP MM300, Bearing housing assembly in CUDDAPAH, ANDHRA PRADESH. Quantity: 5 by. Submission Deadline: 29-12-2025 09: 00: 00. Check eligibility and apply.

Past Similar Tenders (Historical Results)

5 found

Roller,Bearing Pin,Distributor Head,Friction Washer,Part Set of Seals,Cross Disc,Drive Shaft,Vane P

Indian Army

JALANDHAR, PUNJAB

Posted: 30 August 2025
Closed: 9 September 2025
GEM

Big End Bearing Cell,Rocker Arm Assembly,Push Rod,Pipe High Pressure,Cam Shaft Assembly,Cylinder He

Indian Army

WEST KAMENG, ARUNACHAL PRADESH

Posted: 7 August 2025
Closed: 18 August 2025
GEM

Oil Pump,CR Bearing,Main Bigend Bearing,Head Valve,Head Gasket,Push ROD Kit,Packing Set,Thrust Wash

Indian Army

GWALIOR, MADHYA PRADESH

Posted: 24 July 2025
Closed: 4 August 2025
GEM

PTO Shaft Bearing,Pump Housing,Roller,Vane Pump,TD Piston

Indian Army

SONITPUR, ASSAM

Posted: 20 December 2024
Closed: 10 January 2025
GEM

Indian Army Crown Wheel and Pinion & Related Mechanical Components Tender 2025 Maharashtra/Delhi ISI/ISO Standards

Indian Army

BAREILLY, UTTAR PRADESH

Posted: 22 October 2025
Closed: 1 November 2025
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Bidder Turnover

3

Certificate (Requested in ATC)

4

OEM Authorization Certificate

5

Additional Doc 1 (Requested in ATC)

6

Additional Doc 2 (Requested in ATC)

7

Additional Doc 3 (Requested in ATC)

8

Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

9

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer