Restoration due to Laying Gas pipeline using HDD method from Ch 0.00 km to Ch 2.287 km RHS 90 mm Dia.MDPE pipeline 2.287 km and ch1.300 km to Ch2.100 km LHS 32 mm Dia MDPE pipeline 0.800 km Total length 3.087 km along with the Bankura..
PUBLIC WORKS DEPARTMENT
📍 BANKURA, WEST BENGAL