GEM

Indian Army Flight Controller & Aerial Systems Tender Anantnag Jammu Kashmir 2025 - ISI/ISO Standards, 3-Year Turnover, 10 Lakh Value

Posted

22 Oct 2025, 07:07 pm

Deadline

06 Nov 2025, 08:00 pm

Value

₹99,99,000

Latest Corrigendum Available

Progress

Issue22 Oct 2025, 07:07 pm
Corrigendum29 Oct 2025
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

483

Category

Flight Controller

Bid Type

Two Packet Bid

Tender Overview

The Indian Army, Department of Military Affairs, invites bids for a broad suite of aerial system components including Flight Controller, GPS/Compass, Remote Controller, Camera 3 Axis Gimbal Day & Thermal Dual Sensor, Motors, ESCs, Propellers, Frame, Battery, Battery Charger, Power Distribution, Motor Drop Mechanism with holding, and Carry Case. Estimated value: ₹9,999,000. Location: Anantnag, Jammu & Kashmir - 192101. Scope covers Supply, Installation, Testing, Commissioning, and Operator Training, with statutory clearances if required. The tender emphasizes data sheet coherence with offered product specs, and End User Certificate handling when requested by the buyer. A key differentiator is the comprehensive lifecycle include training and statutory clearance support.

Key Specifications

  • Flight Controller, GPS/Compass, and Remote Controller

  • Camera 3 Axis Gimbal Day & Thermal Dual Sensor

  • Motors, ESCs, Propellers, Frame, Battery, Battery Charger

  • Power Distribution, Motor Drop Mechanism with holding

  • Tool Kit and Carry Case

  • Scope includes supply, installation, testing, commissioning, operator training

  • Data sheet must match product specifications; mismatches risk rejection

Terms & Conditions

  • EMD amount and payment terms to be confirmed in bid documents

  • Delivery includes installation, testing, commissioning, and operator training

  • Warranty penalties: 0.5% per week, up to 10% contract value; PBG forfeiture possible

Important Clauses

Payment Terms

Detailed payment schedule to be provided in contract; penalties apply for late service during warranty period

Delivery Schedule

Delivery, installation and commissioning timeline to be defined; timely training of operators is required

Penalties/Liquidated Damages

0.5% per week delay in warranty rectification; maximum 10% of total contract value; potential alternate sourcing at seller cost

Bidder Eligibility

  • Last 3 years average annual turnover meets minimum criteria

  • OEM turnover criteria met for offered product line

  • Data sheet alignment with technical parameters; no mismatches

Bill of Quantities (BOQ) 14 Items

Item # Title Description Quantity Unit Consignee Delivery (Days)
1 Flight Controller Flight Controller 20 nos buycon1@gem 45
2 GPS and Compass GPS and Compass 20 nos buycon1@gem 45
3 Remote Controller Remote Controller 20 nos buycon1@gem 45
4 Camera 3 Axis Gimbal Day and Thermal Dual Sensor Camera 3 Axis Gimbal Day and Thermal Dual Sensor 22 nos buycon1@gem 45
5 Motors Motors 84 nos buycon1@gem 45
6 ESCs ESCs 80 nos buycon1@gem 45
7 Propellers Propellers 90 nos buycon1@gem 45
8 Frame Frame 20 nos buycon1@gem 45
9 Battery Battery 40 nos buycon1@gem 45
10 Battery Charger Battery Charger 17 nos buycon1@gem 45
11 Power Distribution Power Distribution 20 nos buycon1@gem 45
12 Motor drop Mechanism with holding Motor drop Mechanism with holding 20 nos buycon1@gem 45
13 Tool Kit Tool Kit 15 nos buycon1@gem 45
14 Carry Case Carry Case 15 nos buycon1@gem 45

AI-Powered Bidder Prediction

Companies most likely to bid

Unlock Bidder Insights

AI predictions on likely bidders

Required Documents

1

Copy of PAN Card

2

Copy of GSTIN

3

Copy of Cancelled Cheque

4

Copy of EFT Mandate duly certified by Bank

5

Data Sheet of offered product; ensure parameter alignment with bid

6

End User Certificate (in buyer format if requested)

7

Audited Balance Sheets or CA/Cost Accountant turnover certificates for last 3 years

8

OEM authorization (if applicable)

9

Technical bid documents

Corrigendum Updates

2 Updates
#1

Update

29 Oct 2025
#2

Update

29 Oct 2025

Extended Deadline

06 Nov 2025, 08:00 pm

Opening Date

06 Nov 2025, 08:30 pm

Frequently Asked Questions

How to bid for the Indian Army flight controller tender in Anantnag 2025

Bidders should submit PAN, GSTIN, cancelled cheque, and EFT mandate; upload product data sheets aligned to offered specs; ensure End User Certificate readiness if requested; meet last 3 years turnover criteria and OEM turnover as specified in the bid document; include installation, testing, commissioning, and operator training in scope.

What documents are required for this Anantnag aerial systems tender

Required documents include PAN, GSTIN, cancelled cheque, EFT mandate; product data sheet; End User Certificate if requested; audited financial statements or CA/Cost Accountant turnover certificates for last 3 years; OEM authorizations where applicable; and technical bid documents with complete scope details.

What are the warranty penalties for delays in Indian Army procurement

Warranty compliance uses a 0.5% per week penalty on the unit price for each week of delay beyond the 10-day rectification window, capped at 10% of the total contract value; continued delays may trigger alternate sourcing at seller’s cost and PBG forfeiture.

What is the delivery scope for the Anantnag flight controller bid

Delivery includes supply, installation, testing, commissioning, and operator training; statutory clearances if required; data sheet conformity is critical to avoid rejection; timely service during warranty is mandatory with defined remedy timelines.

What standards or certifications are required for this procurement

The tender emphasizes product data sheet conformity; look for IS/ISO certification or specific standard numbers in the bid document; ensure OEM turnover criteria are met and that data sheets reflect compliant specifications for flight control and payload sensors.

How is turnover eligibility determined for bidders and OEMs

Bidder turnover is the average annual turnover over the last 3 years ending 31 March of the previous year, verified by audited balances or CA/Cost Accountant certificates; if the company is under 3 years old, turnover is calculated on completed years since incorporation.

What is included in the scope of supply for this tender

Scope includes supply of all listed components, installation, testing, commissioning, training of operators, and provision of any required statutory clearances; penalties apply for warranty delays, and non-conformity data sheets may lead to bid rejection.

Where can I find the End User Certificate requirements for this bid

End User Certificate requirements appear in the buyer’s terms; if requested, provide the certificate in the buyer’s standard format; ensure the document format matches the procurement portal’s submission guidelines.

Similar Tenders

Drone frame,Flight controller,Propeller,Brushless Motors,Camera,GPS Module,Receiver,FPV Goggle,Radi

Department of Military Affairs

ALLAHABAD, UTTAR PRADESH

View Details

Frame,Stack FC and ESC,Motors,Propellers,Remote and Receiver,Battery Charger,Camera,Battery,GPS

Department of Military Affairs

LALITPUR, UTTAR PRADESH

View Details

Brushless dc motors,Lithium Polymer Battery Pack,Carbon Fiber Frame with Mounting for GPS and Camer

Department of Military Affairs

KANGRA, HIMACHAL PRADESH

View Details

BRUSHLESS DC MOTORS,LITHIUM POLYMER BATTERY PACK,CARBON FIBER FRAME WITH MOUNTING FOR GPS AND CAMER

Department of Military Affairs

KANGRA, HIMACHAL PRADESH

Est: ₹2.7 L
View Details

Brushless DC Motor,Lithium polymer battery pack,Carbon Fiber frame with mounting for GPS and camera

Department of Military Affairs

CHAMBA, HIMACHAL PRADESH

View Details