Non Return Valve
North East Frontier Railway
KAMRUP, ASSAM
Menu
Bid Publish Date
05-Dec-2025, 9:40 am
Bid End Date
20-Dec-2025, 3:00 pm
Location
Progress
Quantity
1
Bid Type
Two Packet Bid
Bharat Heavy Electricals Limited (BHEL) invites bids for CI non-return valves to support NTPC Singrauli Stage-III (2x800MW). The procurement scope references ductile cast iron non-return valve components, with an emphasis on design data alignment and delivery readiness. The process requires Detailed Design Drawings approval within 7 days of award, and potential quantity adjustments up to 25% during and after contract award. The tender emphasizes compliance with approved drawings, and embeds a flexible delivery timeline tied to quantity variations. GST implications are vendor-borne, with actual GST reimbursement rules defined by the buyer, and a need for GSTIN documentation.
CI non-return valves
NTPC Singrauli Stage-III 2x800MW
7-day design drawing submission requirement
Up to 25% quantity variation with corresponding time extensions
GST handling on actuals or applicable rates
Option Clause allows ±25% quantity change with proportional delivery time
Detailed Design Drawings to be approved within 7 days of award
GST is to be borne by bidder with reimbursement as actuals or lower applicable rate
GST reimbursement policy per actuals vs applicable rates; no explicit advance or milestone payments stated
Delivery period linked to original order; extended period applies if option clause is exercised with 30+ days minimum
LD not explicitly detailed; no fixed penalty rate provided in data
No liquidation or bankruptcy status
Must provide PAN, GSTIN, EFT mandate
Must upload Data Sheet and Detailed Design Drawings plan
North East Frontier Railway
KAMRUP, ASSAM
Bhakra Beas Management Board
North East Frontier Railway
National Aluminium Company Limited, Bhubaneswar
ANGUL, ODISHA
Bharat Heavy Electricals Limited (bhel)
ANGUL, ODISHA
Tender Results
Loading results...
Discover companies most likely to bid on this tender
PAN Card
GSTIN
Cancelled cheque
EFT mandate certified by Bank
Data Sheet of offered product
End User Certificate (buyer format if requested)
Details of Detailed Design Drawings submission plan
Extended Deadline
20-Dec-2025, 3:00 pm
Opening Date
20-Dec-2025, 3:30 pm
Key insights about UTTAR PRADESH tender market
Bidders should prepare PAN, GSTIN, cancelled cheque, EFT mandate, and a detailed Data Sheet. Ensure alignment with the offered product and submit Detailed Design Drawings within 7 days of award for buyer approval. The option clause allows quantity changes up to 25%, impacting delivery timelines.
Submit PAN, GSTIN, cancelled cheque, EFT mandate, and the Data Sheet of offered valves. Include End User Certificate if requested by buyer. Vendor code creation requires these documents; ensure GST is prepared for reimbursement per actuals or lower applicable rates.
Delivery starts from the last date of the original delivery order. If the option clause is exercised, additional time is calculated as (increased quantity/original quantity) × original delivery period, minimum 30 days, with possible extension to the original delivery window.
The purchaser can modify quantity by ±25% during contract and currency, with scheduled delivery time extended proportionally. If original period is <30 days, extended time equals the original period; otherwise, calculated time governs until the original window ends.
GST reimbursement is based on actual rates or the lower applicable rate, not exceeding the quoted GST percentage. Suppliers must quote GST and ensure GSTIN applicability; purchaser bears reimbursement within policy limits.
Buyer approval within 7 days is mandatory; if delays occur, the delivery period is refixed for the period of delay without LD penalties, ensuring schedule integrity once drawings are approved.
Submit PAN, GSTIN, cancelled cheque, and EFT mandate; ensure Data Sheet consistency with offered products to allow data match verification before vendor code creation.
Bidders must demonstrate no liquidation or bankruptcy status, provide undertaking, and submit PAN, GSTIN, and EFT mandate. They should also supply a product Data Sheet and be prepared for Detailed Design Drawings approval within 7 days of award.
Sign up now to access all documents
Main Document
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Choose from flexible plans to access tender documents instantly
Main Document
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS