Front Wheel Bearing,Spidle Oil Seal,Flexible Hose,Mud Flap,Suspension Bush Kit,Brake Pressure Pipe,
Indian Army
SRINAGAR, JAMMU & KASHMIR
Bid Publish Date
08-Nov-2025, 5:43 pm
Bid End Date
28-Nov-2025, 6:00 pm
Bid Opening Date
28-Nov-2025, 6:30 pm
Location
Progress
Quantity
32
Category
TEMP GUAGE
Bid Type
Two Packet Bid
The Indian Army invites bids for a broad set of automotive and mechanical spare parts, including TEMP GUAGE, SUPPORT TUBE LINE, FUEL FLEXIBLE PIPE, RUBBER HOSE, ELBOW PIPE, V BELT, GASKET CYL HEAD, RUBBER CHANNEL, BUSHING SLEEVE, WEATHER STRIP, WINDSHIELD, SUSPENSION BUSH KIT, HOSE ASSEMBLY NON METALIC, and related items, for delivery at Darjeeling, West Bengal 734001. The procurement spans 16 items with potential quantity adjustments up to 25% during contract execution under the option clause. The vendor must meet ISO 9001 certification and demonstrate adequate turnover per bid documentation. The contract contemplates standard inspection and compliance processes as indicated by buyer terms; suppliers should prepare for a multi-item BOM and lifecycle support requirements.
Product categories: TEMP GUAGE, FUEL FLEXIBLE PIPE, RUBBER HOSE, ELBOW PIPE, V BELT, GASKET CYL HEAD, RUBBER CHANNEL, WEATHER STRIP, WINDSHIELD, SUSPENSION BUSH KIT, HOSE ASSEMBLY NON METALIC
Standards: ISO 9001 certified bidder or OEM
Turnover: Minimum average annual turnover over last 3 years as per bid document
Option clause: 25% quantity increase/decrease during contract and currency of contract
Inspection: SLBR52 inspection reference; need certificates and compliance with ATC/Corrigendum
ISO 9001 certification mandatory for bidder or OEM
Turnover criteria to be satisfied with audited statements or CA certificate
25% quantity variation right during contract with delivery adjustments
Payment terms aligned to contract; not specified in data; bidders must comply with buyer terms
Delivery period commences from the last date of original delivery order; option clause may extend period with adjusted time
Penalties/LD not detailed in provided terms; contract may include LD for late delivery as per standard Army procurement
Minimum three years of relevant experience in automotive spare parts supply
Audited turnover to meet bid document criteria (or CA certificate)
ISO 9001 certification for bidder or OEM
Indian Army
SRINAGAR, JAMMU & KASHMIR
Indian Army
DARJEELING, WEST BENGAL
Indian Army
GURDASPUR, PUNJAB
Indian Army
GANJAM, ODISHA
Indian Army
JAMMU, JAMMU & KASHMIR
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | TEMP GUAGE | TEMP GUAGE | 2 | nos | smbehera | 15 |
| 2 | SUPPORT TUBE LINE | SUPPORT TUBE LINE | 2 | nos | smbehera | 15 |
| 3 | FUEL FLEXIBLE PIPE | FUEL FLEXIBLE PIPE | 2 | nos | smbehera | 15 |
| 4 | RUBBER HOSE | RUBBER HOSE | 2 | nos | smbehera | 15 |
| 5 | ELBOW PIPE | ELBOW PIPE | 2 | nos | smbehera | 15 |
| 6 | RUBBER HOSE | RUBBER HOSE | 2 | nos | smbehera | 15 |
| 7 | V BELT | V BELT | 2 | nos | smbehera | 15 |
| 8 | GASKET CYL HEAD | GASKET CYL HEAD | 2 | nos | smbehera | 15 |
| 9 | RUBBER CHANNEL | RUBBER CHANNEL | 2 | nos | smbehera | 15 |
| 10 | BUSHING SLEEVE | BUSHING SLEEVE | 2 | nos | smbehera | 15 |
| 11 | WEATHER STRIP WIND SHIELD | WEATHER STRIP WIND SHIELD | 2 | nos | smbehera | 15 |
| 12 | SUSPENSION BUSH KIT | SUSPENSION BUSH KIT | 2 | nos | smbehera | 15 |
| 13 | SA OF HOSE 600 LONG | SA OF HOSE 600 LONG | 2 | nos | smbehera | 15 |
| 14 | HOSE ASSY NON METALIC | HOSE ASSY NON METALIC | 2 | nos | smbehera | 15 |
| 15 | ELBOW HOSE | ELBOW HOSE | 2 | nos | smbehera | 15 |
| 16 | HOSE | HOSE | 2 | nos | smbehera | 15 |
Discover companies most likely to bid on this tender
GST certificate
PAN card
Audited financial statements for the last 3 financial years or CA certificate indicating turnover
ISO 9001 certification (bidder or OEM)
OEM authorization (if bidding as OEM or on behalf of OEM)
Technical bid documents and product certificates for the listed items
Previous experience certificates for similar automotive spare parts supply
Any other certificates requested in ATC/Corrigendum
Key insights about WEST BENGAL tender market
Bidders must submit GST, PAN, turnover documents, ISO 9001 certificate, OEM authorizations (if applicable), and technical bid certificates as per ATC. Ensure SLBR52 inspection readiness and compliance with the 25% option clause. Upload all required certificates with the bid package for eligibility.
Required documents include GST certificate, PAN, 3-year turnover statements (audited or CA certificate), ISO 9001 certificate, OEM authorization if representing the OEM, technical bid, and any certificates specified in ATC/Corrigendum. Ensure all documents are uploaded with the bid.
Bidders must have ISO 9001 certification for themselves or the OEM. The product set includes hoses, pipes, gaskets, belts, and related components; ensure all items meet ISO quality management criteria and supplier documentation validates compliance.
Delivery periods may extend under the option clause: increased quantity is (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. The purchaser may further extend to the original delivery period while exercising the option.
OEMs must demonstrate minimum average annual turnover over the last three years as per bid document, supported by audited balance sheets or CA certificate. If the OEM is newer than three years, turnover is calculated on completed years post-incorporation for eligibility.
Bid submissions must include certificates per ATC and Corrigendum; inspection reference SLBR52 applies. Ensure all product certificates and quality documents are available and uploaded to avoid rejection of the bid package.
Access all tender documents at no cost
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS